NMWR-9-2815-220 Overhaul Manual for M60 M88 Engine AVDS-1790-2CA, AVDS-1790-2DA, AVDS-1790-2DR Download

Page 881 of 1014

NMWR 9-2815-220 FINAL INSPECTION RECORD (FIR) - CONTINUED 0047 01 0047 01-51 Change 1 Table 1. Final Inspection Record (FIR) (Continued) Engine, Diesel: 12-Cylinder, 90-Degree ā€œVā€-Type, AVDS-1790-2DR Dynamometer Tests and Final Inspection Serial No. Contract No. Dynamometer Test. Final Inspection Contractor Inspector and Date Contractor Inspector and Date Government Inspector and Date Government Inspector and Date Special Instructions: (1) Contractor inspection and data shall be completed prior to submission to government inspector for acceptance. (2) Tests shall be performed in accordance with the requirements of MIL-E-62177(C). (3) Inspections shall be performed to determine conformance with engine drawing 11684150 and reference drawings specified. (4) Dynamometer test results shall be recorded on final run. (5) The following characteristics must be visually reviewed and all deficiencies and their corrective action shall be listed on attached deficiency sheets. A. Condition: All parts must exhibit no evidence of damage, mutilation, or poor workmanship of construction. B. Completeness of assembly and secured: All mounting brackets, bolts, nuts, rivets, washers, etc. must be complete and secured. Any evidence of parts being incomplete and improperly secured will be cause for rejection. C. Routing, clipping and clearances: All wiring harnesses, fuel, oil and air lines must be properly routed and clipped per their respective installation drawing. Sufficient clearances between these and adjacent parts must be maintained to ensure there can be no interference. Physically handle the item to verify it is secured. D. Paint: Painted areas must be thoroughly covered. There must be no evidence of thin areas. (6) No erasures shall be made to change symbols, signatures or data.