NMWR-9-2815-220 Overhaul Manual for M60 M88 Engine AVDS-1790-2CA, AVDS-1790-2DA, AVDS-1790-2DR Download
Page 832 of 1014
NMWR 9-2815-220 FINAL INSPECTION RECORD (FIR) - CONTINUED 0047 01 Change 1 0047 01-2 Table 1. Final Inspection Record (FIR) (Continued) Engine, Diesel: 12-Cylinder, 90-Degree āVā-Type, AVDS-1790-2CA Dynamometer Tests and Final Inspection Special Instructions: - Continued (5) The following characteristics must be visually reviewed and all deficiencies and their corrective action shall be listed on attached deficiency sheets. A. Condition: All parts must exhibit no evidence of damage, mutilation, or poor workmanship of construction. B. Completeness of assembly and secured: All mounting brackets, bolts, nuts, rivets, washers, etc. must be complete and secured. Any evidence of parts being incomplete and improperly secured will be cause for rejection. C. Routing, clipping and clearances: All wiring harnesses, fuel, oil and air lines must be properly routed and clipped per their respective installation drawing. Sufficient clearances between these and adjacent parts must be maintained to ensure there can be no interference. Physically handle the item to verify it is secured. D. Paint: Painted areas must be thoroughly covered. There must be no evidence of thin areas. (6) No erasures shall be made to change symbols, signatures or data. (7) Inspectors shall sign for each item, when all characteristics of the item are acceptable, using the symbols listed below: SYMBOLS: ( ) ACCEPTABLE (x) UNACCEPTABLE (O) NOT APPLICABLE Sequence of inspection is divided into six (6) areas as viewed from damper end of engine as follows: Area No. 1 Damper End Area No. 2 Left Bank Area No. 3 Transmission Mounting Face End Area No. 4 Right Bank Area No. 5 Top Area No. 6 Bottom Mechanic/Technician Date Inspector Condition Code Date