NMWR-9-2815-220 Overhaul Manual for M60 M88 Engine AVDS-1790-2CA, AVDS-1790-2DA, AVDS-1790-2DR Download

Page 815 of 1014

NMWR 9-2815-220 MOBILIZATION REQUIREMENTS 0046 00 SCOPE 1. The purpose of this work package is to streamline and accelerate the overhaul process during the mobilization. 2. Deviation from normal maintenance, as described below, may be authorized by Director, ACALA during mobilization in a wartime scenario. DEVIATION FROM NORMAL MAINTENANCE 1. If the materials, personnel, and processing equipment needed to return items to Code A condition are not available, depots may be authorized to ship overhauled items in less than Code A condition by use of a waiver approved by the contracting officer. 2. If mandatory replacement parts are not available, depots may be authorized to reuse original parts. However all reused parts have to be inspected/reclaimed and found to meet all new part dimensions and/or OIP requirements. 3. Requirements to repair cosmetic defects that do not affect serviceability may be waived. END OF WORK PACKAGE 0046 00-1/-2 blank