NMWR-9-2815-220 Overhaul Manual for M60 M88 Engine AVDS-1790-2CA, AVDS-1790-2DA, AVDS-1790-2DR Download
Page 805 of 1014
NMWR 9-2815-220 ENGINE SHIPPING AND STORAGE OVERHAUL—Continued 0044 00 REPAIR – Continued 4. Replace unserviceable skids. Fabricate skids from wood conforming to Class A of A-A-52520. 5. If interior or exterior of container required removal of paint or rust by power buffing, apply spot prime and paint as required. If container required abrasive blasting, remove grit and coat with one coat of primer (A-A-2962 or TT-P-664D, Type IV) as prescribed by TM 43-0139. ASSEMBLY 1. Refer to WP 0005 00 for general assembly procedures. 2. Assemble engine shipping and storage container in accordance with TM 9-2815-220-34. 3. Pressurize the container to 10-psi using air that has passed through a water separator, and allow container to stand for a minimum of 12 hours. In a period of 12 hours, at an ambient temperature that does not vary more than 5 °F, a pressure drop of more than 1/4 psi will be sufficient cause for rejection. Leaks may be detected using a solution of detergent and water. If the container air pressure is maintained satisfactorily, release pressure, remove air pressure gage, and install relief valve. 0044 00-3 Change 1