NMWR-9-2815-220 Overhaul Manual for M60 M88 Engine AVDS-1790-2CA, AVDS-1790-2DA, AVDS-1790-2DR Download

Page 765 of 1014

NMWR 9-2815-220 ENGINE ELECTRICAL COMPONENTS OVERHAUL—Continued 0042 00 Table 4. Overhaul Inspection Procedure for Time Totalizing Meter (OIP 11640392) (Item 26, Figure 1). QA NO. REF. CHARACTERISTIC INSP. REQUISTE REQ. LTR. METHOD 1 Inspect case for dents or Visual None allowed Damage that could hinder unit function. 2 Damaged threads on Visual None allowed Connector 3 Operational check Connect meter to a NOTE 24 volt electrical system After test, the time and test. Run sufficient totalizing meter time to be certain meter should be reset to is recording accurately. zero using the resetting device. (WP 0054 00, Fig.2, item 9) 0042 00-9 Change 1