NMWR-9-2815-220 Overhaul Manual for M60 M88 Engine AVDS-1790-2CA, AVDS-1790-2DA, AVDS-1790-2DR Download

Page 679 of 1014

NMWR 9-2815-220 FUEL INJECTION TUBES AND FUEL RETURN TUBES OVERHAUL—Continued 0033 00 Table 10. Overhaul Inspection Procedure for Left and Right Bank Cylinders No. 2, 3, 4, and 5 Fuel Injection Nozzle To Inter Cylinder Fuel Return Hose Assembly Pressure Line Multiple Fluid Connector (OIP 7323993) (Item 5, Figure 4). QA NO. REF. CHARACTERISTIC INSP. REQUISITE REQ. LTR. METHOD 1 Cracks Visual None allowed 2 Damaged threads Visual None allowed 3 Scratches, nicks, Visual None allowed gouges, or raised metal on seats and contact surfaces 4 Base metal showing Visual None allowed through protective finish END OF WORK PACKAGE 0033 00-17/-18 blank Change 1