NMWR-9-2815-220 Overhaul Manual for M60 M88 Engine AVDS-1790-2CA, AVDS-1790-2DA, AVDS-1790-2DR Download
Page 593 of 1014
NMWR 9-2815-220 EXHAUST MANIFOLDS AND ASSOCIATED PARTS OVERHAUL—Continued 0028 00 Table 5. Overhaul Inspection Procedure for Left and Right Bank Cylinders No. 1, 2, and 3 Exhaust Manifold (OIP 11683988) Right (Item 16, Figure 1) and (OIP 11683987) Left (Item 13, Figure 2). QA NO. REF. CHARACTERISTIC INSP. REQUISITE REQ. LTR. METHOD 1 Cracks Visual None allowed 2 Scratches, nicks, Visual None allowed gouges, or raised metal on contact surfaces 3 Pressure test for leaks Underwater leak test No leaks permissible using 25-35 psi internal air pressure. Plug all openings. NOTE Clamp or secure bellows before submerging underwater to prevent expansion. 4 Fractured or broken Visual None allowed welds 5 Broken or warped Visual None allowed flanges (4 places) 0028 00-13 Change 1