NMWR-9-2815-220 Overhaul Manual for M60 M88 Engine AVDS-1790-2CA, AVDS-1790-2DA, AVDS-1790-2DR Download
Page 523 of 1014
NMWR 9-2815-220 SHROUDS, AIR DEFLECTORS, AND COOLING FANS, VANES, AND 0025 00 HOUSING OVERHAUL—Continued Table 35. Overhaul Inspection Procedure for Cylinder Air Deflector Outer Access Cover (OIP 8682702) (Item 18, Figure 3). QA NO. REF. CHARACTERISTIC INSP. REQUISITE REQ. LTR. METHOD 1 Cracks Visual None allowed 2 Bent Visual None allowed 3 Chipped or missing Visual None allowed paint 0025 00-49 Change 1