NMWR-9-2815-220 Overhaul Manual for M60 M88 Engine AVDS-1790-2CA, AVDS-1790-2DA, AVDS-1790-2DR Download
Page 499 of 1014
NMWR 9-2815-220 SHROUDS, AIR DEFLECTORS, AND COOLING FANS, VANES, AND 0025 00 HOUSING OVERHAUL—Continued Table 11. Overhaul Inspection Procedure for Cylinder No. 1 Left Bank and No. 6 Right Bank Engine Airflow Baffle (OIP 8682756) (Item 20, Figure 2). QA NO. REF. CHARACTERISTIC INSP. REQUISITE REQ. LTR. METHOD 1 Cracks Visual None allowed 2 Bent Visual None allowed 3 Chipped or missing Visual None allowed paint 0025 00-25 Change 1