NMWR-9-2815-220 Overhaul Manual for M60 M88 Engine AVDS-1790-2CA, AVDS-1790-2DA, AVDS-1790-2DR Download
Page 494 of 1014
NMWR 9-2815-220  SHROUDS, AIR DEFLECTORS, AND COOLING FANS, VANES, AND 0025 00  HOUSING OVERHAUL—Continued  Table 6. Overhaul Inspection Procedure for Damper End Cylinder No. 1 Right Bank Cooling Shroud  (OIP E2DRS131-001) (Item 9, Figure 2).  QA NO. REF. CHARACTERISTIC INSP. REQUISITE  REQ. LTR. METHOD  1 Cracks Visual None allowed  2 Bent Visual None allowed  3 Chipped or missing Visual None allowed  paint  0025 00-20  Change 1