NMWR-9-2815-220 Overhaul Manual for M60 M88 Engine AVDS-1790-2CA, AVDS-1790-2DA, AVDS-1790-2DR Download
Page 384 of 1014
NMWR 9-2815-220 AUTOMATIC INJECTION ADVANCE ASSEMBLY OVERHAUL—Continued 0019 00 Table 5. Overhaul Inspection Procedure for Injection Advance Stationary Vane (OIP 7320400) (Item 11, Figure 6) – Continued. QA NO. REF. CHARACTERISTIC INSP. REQUISITE REQ. LTR. METHOD 6 D Thickness Measure 2.1230 (53.9242 mm)Reference NOTE Check concurrently with 7320403 housing to provide 0.0010 – 0.0015 in. (0.0254 – 0.0381 mm) end clearance at assembly. 7 Fit of seal in vane Measure 0.0010L – 0.0070L in. (0.0254L – 0.1778L mm) 0019 00-16 Change 1