Noro Insaat Taahhut Turizm Nakliyat
Dis Ticaret Sanayi Ve Ticaret
Limited Sirketi
CAGE Code: TC710
NCAGE Code: TC710
Status: Active
Type: Commercial Service Contractor
Summary
Noro Insaat Taahhut Turizm Nakliyat, Dis Ticaret Sanayi Ve Ticaret, Limited Sirketi is an Active Commercial Service Contractor with the Cage Code TC710.
Address
Gokce Rezidans, K:3, D:16
Cemalpasa Mahallesi Ataturk Caddesi
Seyhan
01120
Turkey
Points of Contact
No Points of Contact...
Related Information
No Related Information...
People who viewed this 'CAGE Code' also viewed...
North Power Construction Company Newyork Eagle Construction Company Super Jet Group Sina Aria Logistic And Trading Arif Noor Construction Company,Ltd Melad Abrar Intl. Transit And Bashir Qayum Logistics Services Dostamani Construction Company Sayed Zawar Ali Khan Renewable Energy Agency Jlcc Mohammad Eisa Sardarzada Well Naweed Insaaf Construction Company Aria Roshan Trading Company Inc Abdul Waris Kamran Road And Priority Development Stratigic Co Ace Limited Liability Company Asct Group Seroosh Services Lux Star Construction Company
Frequently Asked Questions (FAQ) for CAGE TC710
- What is CAGE Code TC710?
- TC710 is the unique identifier used by NATO Organizations to reference the physical entity known as Noro Insaat Taahhut Turizm Nakliyat Dis Ticaret Sanayi Ve Ticaret Limited Sirketi located at Gokce Rezidans, K:3, D:16, Cemalpasa Mahallesi Ataturk Caddesi, Seyhan, 01120, Turkey.
- Who is CAGE Code TC710?
- TC710 refers to Noro Insaat Taahhut Turizm Nakliyat Dis Ticaret Sanayi Ve Ticaret Limited Sirketi located at Gokce Rezidans, K:3, D:16, Cemalpasa Mahallesi Ataturk Caddesi, Seyhan, 01120, Turkey.
- Where is CAGE Code TC710 Located?
- CAGE Code TC710 is located in Seyhan, Turkey.
Contracting History for CAGE TC710 Most Recent 25 Records
- 0002
- Sofa: Cr007 Time Modification For Civil Unrest Time Due To Contractor For Delays Due To Reported And Unreported Civil Unrest In The Country, The Capital Of Ouagadougou And On The Military Compound That Houses The Constructed Facility.
- 28 May 2019
- Sofa: Cr007 Time Modification For Civil Unrest Time Due To Contractor For Delays Due To Reported And Unreported Civil Unrest In The Country, The Capital Of Ouagadougou And On The Military Compound That Houses The Constructed Facility.
- W2sd Fest Nau1 Europe
- Department Of Defense (Dod)
- $425,441.80
- Department Of Defense (Dod)
- 0001
- De-Obligate Minimum Guarantee. Africa Matoc Base Year
- 28 Mar 2022
- De-Obligate Minimum Guarantee. Africa Matoc Base Year
- W2sd Fest Nau1 Europe
- Department Of Defense (Dod)
- $0.00
- Department Of Defense (Dod)
- 0002
- Sofa: Cr007 Time Extension/Material And Workmanship Item 07. A Time Extension Is Required To Bring The Contract Into Good Standing. Significant Factors Lead To A Substantial Delay Beyond The Period Of Performance Due To The Cultural, Environmental Restraints, And Hardships Experienced In Executing Work In Djibouti. We Will Evaluate, Quantify, And Negotiate The Time Delay As A Result Of These Factors. Item 8. Usace Is Pursuing A Credit Modification For The Deficient Work That Was Exhibited. Deficiency In The Materials Utilized And Workmanship In The Construction Execution Of The Roof Slab Has Been Identified Multiple Times As A Deficient Feature Of Work. After Three Attempts In Resolving The Issue Through Slab Replacement, The Slab Has Began To Fail And Sag Beyond Acceptable Limits. To Remedy The Situation, Supporting Structural Columns Were Recommended By Usace Structural Engineers To Be Installed In Order To Stabilize The Roof Slab From Full Failure And Collapse. These Necessary Structural Remediation Elements Limited The Clear Space Requirement And Intent Of The Warehouse Contract Design. Usace Will Accept The Deficient Work For An Equitable
- 12 Jun 2019
- Sofa: Cr007 Time Extension/Material And Workmanship Item 07. A Time Extension Is Required To Bring The Contract Into Good Standing. Significant Factors Lead To A Substantial Delay Beyond The Period Of Performance Due To The Cultural, Environmental Restraints, And Hardships Experienced In Executing Work In Djibouti. We Will Evaluate, Quantify, And Negotiate The Time Delay As A Result Of These Factors. Item 8. Usace Is Pursuing A Credit Modification For The Deficient Work That Was Exhibited. Deficiency In The Materials Utilized And Workmanship In The Construction Execution Of The Roof Slab Has Been Identified Multiple Times As A Deficient Feature Of Work. After Three Attempts In Resolving The Issue Through Slab Replacement, The Slab Has Began To Fail And Sag Beyond Acceptable Limits. To Remedy The Situation, Supporting Structural Columns Were Recommended By Usace Structural Engineers To Be Installed In Order To Stabilize The Roof Slab From Full Failure And Collapse. These Necessary Structural Remediation Elements Limited The Clear Space Requirement And Intent Of The Warehouse Contract Design. Usace Will Accept The Deficient Work For An Equitable
- W2sd Fest Nau1 Europe
- Department Of Defense (Dod)
- $481,142.30
- Department Of Defense (Dod)