Fa-Ber Construction Plc
CAGE Code: SZS80
NCAGE Code: SZS80
Status: Active
Type: Commercial Supplier
Summary
Fa-Ber Construction Plc is an Active Commercial Supplier with the Cage Code SZS80.
Address
Bole Sub City Kebelle 03/05
Addis Ababa
101131
Ethiopia
Points of Contact
No Points of Contact...
Related Information
No Related Information...
Frequently Asked Questions (FAQ) for CAGE SZS80
- What is CAGE Code SZS80?
- SZS80 is the unique identifier used by NATO Organizations to reference the physical entity known as Fa-Ber Construction Plc located at Bole Sub City Kebelle 03/05, Addis Ababa, 101131, Ethiopia.
- Who is CAGE Code SZS80?
- SZS80 refers to Fa-Ber Construction Plc located at Bole Sub City Kebelle 03/05, Addis Ababa, 101131, Ethiopia.
- Where is CAGE Code SZS80 Located?
- CAGE Code SZS80 is located in Addis Ababa, Ethiopia.
Contracting History for CAGE SZS80 Most Recent 25 Records
- 72066318C00004
- Igf::Cl::Igf - Water Supply Construction At Five Sites Under Clins 3&4 (Clin 3: Agumamit, Kuni, And Gulem Dejen, And Clin 4: Kachena Gudie And Lideta) With Fa-Ber Construction Plc In Joint Venture (Jv) With Tam Geoengineering Plc In The Amount Of $712,699.85 Including Vat.
- 20 Jun 2018
- Igf::Cl::Igf - Water Supply Construction At Five Sites Under Clins 3&4 (Clin 3: Agumamit, Kuni, And Gulem Dejen, And Clin 4: Kachena Gudie And Lideta) With Fa-Ber Construction Plc In Joint Venture (Jv) With Tam Geoengineering Plc In The Amount Of $712,699.85 Including Vat.
- Usaid/Ethopia
- Agency For International Development (Usaid)
- $712,699.85
- Agency For International Development (Usaid)
- 72066318C00004
- Igf::Cl::Igf - The Purpose Of This Modification Is To Institute The Following Changes Within The General Scope Of The Contract: 1. Site 3.1 Agumamit: Add A Water Point For A School With Additional Price Of $7,614.00 2. Site 3.2 Kuni: Add Photovoltaic (Pv) System With Additional Price Of $54,889.00 3. Site 3.3 Gulem Dejen: Remove All Well Scope, Quarterly Water Quality Testing, And Provisional Sum For Access Road Add Pv System (Agreed Price: $41,337.00) Within The Revised Scope. As The Result Of Reduction In Scope And Addition Of The Pv System, The Original Agreed Price Of Site 3.3 Will Be Reduced By $70,556.00 From $111,893.00 To $41,337.00 4. Site 4.2 Lideta: Add A Water Point For Lideta Community With Additional Price Of $8,508.00And 5. Extend The Performance Period Of Clin 3/Group Sites (Site 3.1: Agumamit, Site 3.2 : Kuni, And Site 3:3 : Gulem Dejen) By 134 Calendar Days From 01/19/2019 To 06/03/2019 And Clin 4/Group 4 (Site 4.2 : Lideta) From 11/20/2018 To 03/ 22/2019. The Net Effect In The Original Price Of The Contract Resulted From The Above Changes In Scope Will Be As Follows: 1) The Firm-Fixed Price Of The Contract Will Increase By $455.00 From $619,739.00 To $620,194.00 2) The Associated Value Added Tax (Vat) Will Increase By $68.25 From $92,960.85 To $93,029.10 And 3) The Total Firm-Fixed Price Including Vat Will Increase By $523.25 From $712,699.85 To $713,223.10 - End - The Notice To Proceed For The Change Orders Was Issued On 11/29/2018 And 01/22/2019 To Provide An Equitable Time Due To The Revision In Scope And Lack Of Access To Kuni Site.
- 20 Jun 2019
- Igf::Cl::Igf - The Purpose Of This Modification Is To Institute The Following Changes Within The General Scope Of The Contract: 1. Site 3.1 Agumamit: Add A Water Point For A School With Additional Price Of $7,614.00 2. Site 3.2 Kuni: Add Photovoltaic (Pv) System With Additional Price Of $54,889.00 3. Site 3.3 Gulem Dejen: Remove All Well Scope, Quarterly Water Quality Testing, And Provisional Sum For Access Road Add Pv System (Agreed Price: $41,337.00) Within The Revised Scope. As The Result Of Reduction In Scope And Addition Of The Pv System, The Original Agreed Price Of Site 3.3 Will Be Reduced By $70,556.00 From $111,893.00 To $41,337.00 4. Site 4.2 Lideta: Add A Water Point For Lideta Community With Additional Price Of $8,508.00And 5. Extend The Performance Period Of Clin 3/Group Sites (Site 3.1: Agumamit, Site 3.2 : Kuni, And Site 3:3 : Gulem Dejen) By 134 Calendar Days From 01/19/2019 To 06/03/2019 And Clin 4/Group 4 (Site 4.2 : Lideta) From 11/20/2018 To 03/ 22/2019. The Net Effect In The Original Price Of The Contract Resulted From The Above Changes In Scope Will Be As Follows: 1) The Firm-Fixed Price Of The Contract Will Increase By $455.00 From $619,739.00 To $620,194.00 2) The Associated Value Added Tax (Vat) Will Increase By $68.25 From $92,960.85 To $93,029.10 And 3) The Total Firm-Fixed Price Including Vat Will Increase By $523.25 From $712,699.85 To $713,223.10 - End - The Notice To Proceed For The Change Orders Was Issued On 11/29/2018 And 01/22/2019 To Provide An Equitable Time Due To The Revision In Scope And Lack Of Access To Kuni Site.
- Usaid/Ethiopia
- Agency For International Development (Usaid)
- $713,223.10
- Agency For International Development (Usaid)
- 72066318C00004
- The Purpose Of This Modification Is To De-Sub Obligate $24,439.97 From The Firm-Fixed Price Of The Completed Contract, As Modified. Following This Action, The Revised Firm-Fixed Price And The Obligated Amount Of The Contract Is $688,783.13.
- 30 Mar 2021
- The Purpose Of This Modification Is To De-Sub Obligate $24,439.97 From The Firm-Fixed Price Of The Completed Contract, As Modified. Following This Action, The Revised Firm-Fixed Price And The Obligated Amount Of The Contract Is $688,783.13.
- Usaid/Ethiopia
- Agency For International Development (Usaid)
- $683,783.13
- Agency For International Development (Usaid)