Nova Constructors Limited Liability
Co.

CAGE Code: SWL23

NCAGE Code: SWL23

Status: Succeeded(Merged)

Type: Commercial Service Contractor

Summary

Nova Constructors Limited Liability, Co. is a Succeeded(Merged) Commercial Service Contractor with the Cage Code SWL23.

Address

267, Ihei, Chatan-Cho
Park Side Ihei 1F.101
Nakagumi-Gun
Tokyo
904-0102
Japan

Points of Contact

No Points of Contact...

Related Information

No Related Information...

CAGE Code FAQ Frequently Asked Questions (FAQ) for CAGE SWL23

What is CAGE Code SWL23?
SWL23 is the unique identifier used by NATO Organizations to reference the physical entity known as Nova Constructors Limited Liability Co. located at 267, Ihei, Chatan-Cho, Park Side Ihei 1F.101, Nakagumi-Gun, Tokyo, 904-0102, Japan.
Who is CAGE Code SWL23?
SWL23 refers to Nova Constructors Limited Liability Co. located at 267, Ihei, Chatan-Cho, Park Side Ihei 1F.101, Nakagumi-Gun, Tokyo, 904-0102, Japan.
Where is CAGE Code SWL23 Located?
CAGE Code SWL23 is located in Nakagumi-Gun, Japan.

Contracting History for CAGE SWL23 Contracting History for CAGE SWL23 Most Recent 25 Records

W912HV16C0008
Definitization And Settlement Of Change Cm005 Reclaim Fuel, Type Iv Hydrant Fuel Repair, Misawa Ab, Japan.
6 Mar 2018
Us Army Engineer District Jpn
Department Of Defense (Dod)
$5,349,109.02
W912HV16C0008
Igf::Ot::Igf 1 New Counterpoise Contractor Shall Provide All Labor, Equipment, Materials, And Supervision For The Following Scope Of Work: Install New Counterpoise Grid Around The Filter Building (Bldg 3127) In Accordance With Contract W912hv-16-C-0008, Cm 004, Sketch 1 (Dwg Eg-101) And Specification Section 33 70 02.00 10. Note That Connections To Existing Lightning Protection Lines Exiting The Filter Building Should Be Made With Exothermic Welds. 2 Lightning Surge Arrestor Contractor Shall Provide All Labor, Equipment, Materials, And Supervision For The Following Scope Of Work: Install Six (6) Sets (One For Each Has) Of Conductors, Mounting Brackets, And Necessary Connectors In Order To Tie-In The Bypass Line To The New Surge Arrestor Already Required By Contract. 3 Insulating Flange Gasket Contractor Shall Provide All Labor, Equipment, Materials, And Supervision For The Following Scope Of Work 4. Install Additional Conduit, Wiring, And Any Required Electrical Components Between The Existing Prt And The New Pump Control Panel (Pcp) In Order To Satisfy The Design Intent As Indicated In Contract W912hv-C-0008 Drawing Ei 503, Note 4.
15 Dec 2017
Us Army Engineer District Jpn
Department Of Defense (Dod)
$5,349,109.02
W912HV16C0008
Igf::Ot::Igf A. Scope Of Work Cm005-1 Reclaim Fuel Part 1 Statement Of Work 1. Provide All Material, Labor, Equipment And Supervision To Drain All Fuel From The System In Accordance With The Attached Revised Drawing M-001 2. Complete The Following Scope Of Work For The Active And Abandoned Loops: A.The Contractor Shall Remove And Deliver Fuel To Fuel Farm #2, As Indicated Below. B.The Contractor Shall Dispose Of Fuel Properly Off Base, As Indicated Below. C.The Contractor Will Provide A Means To Measure The Amount Of Fuel Being Removed From The Lines And Provide That Number To The Resident Office. Reclaim Procedure: This Fuel Shall Be Taken To The Fuel Farm #2 For Off-Loading. Misawa Pol Staff Shall Connect To The Vehicle And Unload All Fuel From The Vehicle(S). Dispose: The Contractor Shall Dispose Of The Fuel In A Proper Manner Off Base. 3.West Loop: The Contractor Shall Dispose Of All Fuel Removed From West Loop Pipe Line Off Base. 4.East Loop: For The East Loop Only, The Contractor Shall Follow The Outline Procedure Below. A.Contractor Is To Provide Fuel Vehicle(S) To Transport The Fuel From The Extraction Point To Fuel Farm #2, Near Falcon Gate. B.Each Truck Shall Be Stationed Within The Fuel Farm And Remain Standing For 1 Hour. Within That Time The Government Designated Agents (Gda) Shall Provide Direction To The Contractor. Direction From The Gda Shall Be Either To Dispose Or To Reclaim. 5.Tank Fill Stand: Provide All Material, Labor, Equipment And Supervision To Complete The Following Scope Of Work For The Transfer Line: A.Contractor Shall Provide A Work Plan To Reduce The Fuel In The Tank Fill Stand To A Level So Work Can Be Performed Safely, And Reduce The Fuel In Accordance With The Plan. 6. Abandoned Loop The Contractor Shall Dispose Of All Fuel Removed From Abandoned Pipe Line Off Base. 7. All Fuels Requiring Disposal Off Base Will Be Disposed Within The Aomori Prefecture Area Of Operation And Not Transported To Tokyo.
27 Oct 2017
Us Army Engineer District Jpn
Department Of Defense (Dod)
$5,349,109.02
W912HV16C0008
Igf::Ot::Igf Delete Clin 009 Work Within This Clin Is Not Required
8 Mar 2018
Us Army Engineer District Jpn
Department Of Defense (Dod)
$5,349,109.02
W912HV16C0008
Igf::Ot::Igf Cm001: Provide All Required Labor, Supervision, Materials, And Equipment To Complete The Following: 1. Replace Carbon Steel Spool As Recommended On Rfi#7 With Stainless Steel Spool. Cm002: Provide All Required Labor, Supervision, Material And Equipment To Complete The Scope Of Work Within The Following Attached Drawings:"W912hv-16-C-0008 : Cm002 : Prt Redesign : Sheets 1 Through 5".
6 Jul 2017
Us Army Engineer District Jpn
Department Of Defense (Dod)
$5,349,109.02