Toa Corporation

CAGE Code: SP888

NCAGE Code: SP888

Status: Succeeded(Merged)

Type: Manufacturer

CAGE SP888 Toa Corporation
CAGE SP888 Toa Corporation

Summary

Toa Corporation is a Succeeded(Merged) Manufacturer with the Cage Code SP888.

Address

1-6-16, Hakataekimae, Hakata-Ku
Fukuoka
Fukuoka
812-0011
Japan

Related Information

No Related Information...

Associated CAGE Codes People who viewed this 'CAGE Code' also viewed...

CAGE Code FAQ Frequently Asked Questions (FAQ) for CAGE SP888

What is CAGE Code SP888?
SP888 is the unique identifier used by NATO Organizations to reference the physical entity known as Toa Corporation located at 1-6-16, Hakataekimae, Hakata-Ku, Fukuoka, Fukuoka, 812-0011, Japan.
Who is CAGE Code SP888?
SP888 refers to Toa Corporation located at 1-6-16, Hakataekimae, Hakata-Ku, Fukuoka, Fukuoka, 812-0011, Japan.
Where is CAGE Code SP888 Located?
CAGE Code SP888 is located in Fukuoka, Japan.

Contracting History for CAGE SP888 Contracting History for CAGE SP888 Most Recent 25 Records

N4008419C6500
N4008419c6500 Repair Fire Protection Pipeline
7 Apr 2020
Naval Fac Engineering Cmd Far East
Department Of Defense (Dod)
$11,022,062.54
N4008419C6500
N4008419c6500 Repair Fire Protection Pipeline
12 Aug 2020
Naval Fac Engineering Cmd Far East
Department Of Defense (Dod)
$11,288,744.01
W912HV19C0003
The Purpose Of This Modification Is To Revise Contract Line Item Numbers For Administrative Purposes.
14 Jan 2019
Us Army Engineer District Jpn
Department Of Defense (Dod)
$33,790,573.95
W912HV19C0003
Fuel Wharf, Mooring Dolphins,
27 Dec 2018
Us Army Engineer District Jpn
Department Of Defense (Dod)
$41,830,329.03
W912HV19C0003
Admin Mod To Correct The Period Of Performance Based On The Ntp Date.
27 Mar 2019
Us Army Engineer District Jpn
Department Of Defense (Dod)
$33,790,573.95
N4008419C6500
Igf::Ot::Igf N4008419c6500 Repair Fire Protection Pipeline At Hario Shima
28 Nov 2018
Naval Fac Engineering Cmd Far East
Department Of Defense (Dod)
$11,022,117.72
0003
Igf::Ot::Igf The Purpose Of This No Cost Modification Is To Provide 143 Calendar Days Time Extension Will Allow The Contractor Sufficient Time To Complete The Scope Of Work In The Contract Due To Contractors Inability To Access The Work Site At Juliet Basin Because Of The Extended Berthing Of Two Ships Being Repaired And Unable To Be Relocated To Other Berthing Spaces Which Is Beyond The Control And At No Fault Of The Contractor. The Contract Completion Date (Ccd) Is Revised From 14 November 2016 To 6 April 2017.
27 Mar 2017
Naval Fac Engineering Cmd Far East
Department Of Defense (Dod)
$425,182.63