Taisei Rotec Corporation
Div Okinawa Branch Office
CAGE Code: SP787
NCAGE Code: SP787
Status: Succeeded(Merged)
Type: Manufacturer
Summary
Taisei Rotec Corporation, Div Okinawa Branch Office is a Succeeded(Merged) Manufacturer with the Cage Code SP787.
Address
3-11-1, Isa
Ginowan
901-2221
Japan
Points of Contact
No Points of Contact...
Related Information
No Related Information...
People who viewed this 'CAGE Code' also viewed...
North Power Construction Company Newyork Eagle Construction Company Super Jet Group Sina Aria Logistic And Trading Arif Noor Construction Company,Ltd Melad Abrar Intl. Transit And Bashir Qayum Logistics Services Dostamani Construction Company Sayed Zawar Ali Khan Renewable Energy Agency Jlcc Mohammad Eisa Sardarzada Well Naweed Insaaf Construction Company Aria Roshan Trading Company Inc Abdul Waris Kamran Road And Priority Development Stratigic Co Ace Limited Liability Company Asct Group Seroosh Services Lux Star Construction Company
Frequently Asked Questions (FAQ) for CAGE SP787
- What is CAGE Code SP787?
- SP787 is the unique identifier used by NATO Organizations to reference the physical entity known as Taisei Rotec Corporation Div Okinawa Branch Office located at 3-11-1, Isa, Ginowan, 901-2221, Japan.
- Who is CAGE Code SP787?
- SP787 refers to Taisei Rotec Corporation Div Okinawa Branch Office located at 3-11-1, Isa, Ginowan, 901-2221, Japan.
- Where is CAGE Code SP787 Located?
- CAGE Code SP787 is located in Ginowan, Japan.
Contracting History for CAGE SP787 Most Recent 25 Records
- 0014
- Igf::Ot::Igf The Purpose Of This Modification Is To Administratively Adjust The Final Amount Due And Payable Under The Subject Contract To Reflect Assessment And Collection Of Liquidated Damages For Failure To Complete The Work Within The Time-Frame Specified For Completion. The Specified Date For Completion Including All Authorized Extensions Is 17 March 2017. The Actual Date Of Completion By The Contractor Has Been Calculated As 21 March 2017, Which Is 4 Calendar Days After The Specified Date For Completion. Four (4) Calendar Days At The Prescribed Rate Of Jpy 24,366 Per Calendar Day For Delay Damages Totaling Jpy 97,464. As A Result Of This Modification, The Final Amount Due And Payable Under The Subject Contract Is Reduced By The Sum Of Jpy 97,464 From Jpy 20,655,255 To Jpy 20,557,791. The Original Contract Price Including All Modifications Of Jpy 20,655,255 And The Specified Time Completion Date Of 17 March 2017 Remain Unchanged.
- 20 Jul 2017
- Igf::Ot::Igf The Purpose Of This Modification Is To Administratively Adjust The Final Amount Due And Payable Under The Subject Contract To Reflect Assessment And Collection Of Liquidated Damages For Failure To Complete The Work Within The Time-Frame Specified For Completion. The Specified Date For Completion Including All Authorized Extensions Is 17 March 2017. The Actual Date Of Completion By The Contractor Has Been Calculated As 21 March 2017, Which Is 4 Calendar Days After The Specified Date For Completion. Four (4) Calendar Days At The Prescribed Rate Of Jpy 24,366 Per Calendar Day For Delay Damages Totaling Jpy 97,464. As A Result Of This Modification, The Final Amount Due And Payable Under The Subject Contract Is Reduced By The Sum Of Jpy 97,464 From Jpy 20,655,255 To Jpy 20,557,791. The Original Contract Price Including All Modifications Of Jpy 20,655,255 And The Specified Time Completion Date Of 17 March 2017 Remain Unchanged.
- Naval Fac Engineering Cmd Far East
- Department Of Defense (Dod)
- $168,741.62
- Department Of Defense (Dod)