Universidad Nacional De San Agustin
CAGE Code: SGZ35
NCAGE Code: SGZ35
Status: Active
Type: Commercial Supplier
Summary
Universidad Nacional De San Agustin is an Active Commercial Supplier with the Cage Code SGZ35.
Address
Calle Santa Catalina 117
Arequipa
Arequipa
04001
Peru
Points of Contact
Related Information
No Related Information...
People who viewed this 'CAGE Code' also viewed...
North Power Construction Company Newyork Eagle Construction Company Super Jet Group Sina Aria Logistic And Trading Arif Noor Construction Company,Ltd Melad Abrar Intl. Transit And Bashir Qayum Logistics Services Dostamani Construction Company Sayed Zawar Ali Khan Renewable Energy Agency Jlcc Mohammad Eisa Sardarzada Well Naweed Insaaf Construction Company Aria Roshan Trading Company Inc Abdul Waris Kamran Road And Priority Development Stratigic Co Ace Limited Liability Company Asct Group Seroosh Services Lux Star Construction Company
Frequently Asked Questions (FAQ) for CAGE SGZ35
- What is CAGE Code SGZ35?
- SGZ35 is the unique identifier used by NATO Organizations to reference the physical entity known as Universidad Nacional De San Agustin located at Calle Santa Catalina 117, Arequipa, Arequipa, 04001, Peru.
- Who is CAGE Code SGZ35?
- SGZ35 refers to Universidad Nacional De San Agustin located at Calle Santa Catalina 117, Arequipa, Arequipa, 04001, Peru.
- Where is CAGE Code SGZ35 Located?
- CAGE Code SGZ35 is located in Arequipa, Peru.
Contracting History for CAGE SGZ35 Most Recent 25 Records
- 80GSFC20C0003
- University Of Peru Satellite Laser Ranging Operations.
- 30 Jun 2021
- University Of Peru Satellite Laser Ranging Operations.
- Nasa Goddard Space Flight Center
- National Aeronautics And Space Administration (Nasa)
- $501,122.66
- National Aeronautics And Space Administration (Nasa)
- 80GSFC20C0003
- University Of Peru Satellite Laser Ranging Operations.
- 14 Oct 2020
- University Of Peru Satellite Laser Ranging Operations.
- Nasa Goddard Space Flight Center
- National Aeronautics And Space Administration (Nasa)
- $501,122.66
- National Aeronautics And Space Administration (Nasa)
- 80GSFC20C0003
- University Of Peru Satellite Laser Ranging Operations.
- 24 Nov 2020
- University Of Peru Satellite Laser Ranging Operations.
- Nasa Goddard Space Flight Center
- National Aeronautics And Space Administration (Nasa)
- $501,122.66
- National Aeronautics And Space Administration (Nasa)
- 80GSFC20C0003
- University Of Peru Satellite Laser Ranging Operations.
- 16 Nov 2023
- University Of Peru Satellite Laser Ranging Operations.
- Nasa Goddard Space Flight Center
- National Aeronautics And Space Administration (Nasa)
- $873,856.91
- National Aeronautics And Space Administration (Nasa)
- 80GSFC20C0003
- University Of Peru Satellite Laser Ranging Operations.
- 20 Jun 2023
- University Of Peru Satellite Laser Ranging Operations.
- Nasa Goddard Space Flight Center
- National Aeronautics And Space Administration (Nasa)
- $672,698.91
- National Aeronautics And Space Administration (Nasa)
- 80GSFC20C0003
- University Of Peru Satellite Laser Ranging Operations.
- 24 Jun 2022
- University Of Peru Satellite Laser Ranging Operations.
- Nasa Goddard Space Flight Center
- National Aeronautics And Space Administration (Nasa)
- $701,841.66
- National Aeronautics And Space Administration (Nasa)
- 80GSFC20C0003
- University Of Peru Satellite Laser Ranging Operations.
- 25 Nov 2019
- University Of Peru Satellite Laser Ranging Operations.
- Nasa Goddard Space Flight Center
- National Aeronautics And Space Administration (Nasa)
- $501,122.66
- National Aeronautics And Space Administration (Nasa)
- 80GSFC20C0003
- University Of Peru Satellite Laser Ranging Operations.
- 10 Nov 2022
- University Of Peru Satellite Laser Ranging Operations.
- Nasa Goddard Space Flight Center
- National Aeronautics And Space Administration (Nasa)
- $701,841.66
- National Aeronautics And Space Administration (Nasa)
- 80GSFC20C0003
- University Of Peru Satellite Laser Ranging Operations.
- 8 Sep 2023
- University Of Peru Satellite Laser Ranging Operations.
- Nasa Goddard Space Flight Center
- National Aeronautics And Space Administration (Nasa)
- $672,678.91
- National Aeronautics And Space Administration (Nasa)
- 80GSFC20C0003
- University Of Peru Satellite Laser Ranging Operations.
- 30 Sep 2021
- University Of Peru Satellite Laser Ranging Operations.
- Nasa Goddard Space Flight Center
- National Aeronautics And Space Administration (Nasa)
- $501,122.66
- National Aeronautics And Space Administration (Nasa)
- 80GSFC20C0003
- University Of Peru Satellite Laser Ranging Operations.
- 24 Jun 2022
- University Of Peru Satellite Laser Ranging Operations.
- Nasa Goddard Space Flight Center
- National Aeronautics And Space Administration (Nasa)
- $701,841.66
- National Aeronautics And Space Administration (Nasa)
- 80GSFC20C0003
- University Of Peru Satellite Laser Ranging Operations.
- 22 Nov 2021
- University Of Peru Satellite Laser Ranging Operations.
- Nasa Goddard Space Flight Center
- National Aeronautics And Space Administration (Nasa)
- $701,841.66
- National Aeronautics And Space Administration (Nasa)
- NNG15VP01C
- Nasa/Gsfc Has A Requirement To Acquire Support Services For The Administration, Operations, And Maintenance Of The Transportable Laser Ranging System (Tlrs-3) Located At The Universidad Nacional De San Agustin (Unsa) In Arequipa, Peru, Which Is Part Of The Nasa Satellite Laser Ranging Network. The Contractor Shall Provide The Personnel, Materials, And Facilities Necessary To Operate And Maintain The Satellite Tracking Station At Characato, Arequipa, Peru: I. In Accordance With The New International Agreement Between Nasa And The Universidad Nacional De San Agustin (Unsa), Which Was Renewed By Nasa On June 10, 2014 And Ed By Unsa On July 2, 2014 (Valid Until October 25, 2019), Unsa, For Its Part, Shall Fulfill The Following Responsibilities: 1. Provide The 1,450-Square-Meter Fenced Site Located At The San Francisco Observatory In Characato, In Addition To The Buildings, Equipment And Materials Owned By Unsa, For Station Operations. It Is Noted That Unsa Shall Use The Area Surrounding The Station As It Sees Fit As Long As This Usage Is Not Detrimental To The Functioning Of The Station. 2. Select And Train, As Mutually Agreed Upon, And In Conformity With Nasa's Technical Performance Requirements, Unsa Technical Personnel Responsible For The Operation And Maintenance Of The Satellite Tracking System. Unsa Shall Also Be Responsible For The Administrative Management And Necessary Janitorial Services. Unsa Shall Establish Procedures For Paying Unsa Personnel Their Salaries And Social Benefits.
- 21 Aug 2023
- Nasa/Gsfc Has A Requirement To Acquire Support Services For The Administration, Operations, And Maintenance Of The Transportable Laser Ranging System (Tlrs-3) Located At The Universidad Nacional De San Agustin (Unsa) In Arequipa, Peru, Which Is Part Of The Nasa Satellite Laser Ranging Network. The Contractor Shall Provide The Personnel, Materials, And Facilities Necessary To Operate And Maintain The Satellite Tracking Station At Characato, Arequipa, Peru: I. In Accordance With The New International Agreement Between Nasa And The Universidad Nacional De San Agustin (Unsa), Which Was Renewed By Nasa On June 10, 2014 And Ed By Unsa On July 2, 2014 (Valid Until October 25, 2019), Unsa, For Its Part, Shall Fulfill The Following Responsibilities: 1. Provide The 1,450-Square-Meter Fenced Site Located At The San Francisco Observatory In Characato, In Addition To The Buildings, Equipment And Materials Owned By Unsa, For Station Operations. It Is Noted That Unsa Shall Use The Area Surrounding The Station As It Sees Fit As Long As This Usage Is Not Detrimental To The Functioning Of The Station. 2. Select And Train, As Mutually Agreed Upon, And In Conformity With Nasa's Technical Performance Requirements, Unsa Technical Personnel Responsible For The Operation And Maintenance Of The Satellite Tracking System. Unsa Shall Also Be Responsible For The Administrative Management And Necessary Janitorial Services. Unsa Shall Establish Procedures For Paying Unsa Personnel Their Salaries And Social Benefits.
- Nasa Goddard Space Flight Center
- National Aeronautics And Space Administration (Nasa)
- $740,257.81
- National Aeronautics And Space Administration (Nasa)
- NNG15VP01C
- Igf::Ot::Igf Nasa/Gsfc Has A Requirement To Acquire Support Services For The Administration, Operations, And Maintenance Of The Transportable Laser Ranging System (Tlrs-3) Located At The Universidad Nacional De San Agustin (Unsa) In Arequipa, Peru, Which Is Part Of The Nasa Satellite Laser Ranging Network. The Contractor Shall Provide The Personnel, Materials, And Facilities Necessary To Operate And Maintain The Satellite Tracking Station At Characato, Arequipa, Peru: I. In Accordance With The New International Agreement Between Nasa And The Universidad Nacional De San Agustin (Unsa), Which Was Renewed By Nasa On June 10, 2014 And Confirmed By Unsa On July 2, 2014 (Valid Until October 25, 2019), Unsa, For Its Part, Shall Fulfill The Following Responsibilities: 1. Provide The 1,450-Square-Meter Fenced Site Located At The San Francisco Observatory In Characato, In Addition To The Buildings, Equipment And Materials Owned By Unsa, For Station Operations. It Is Noted That Unsa Shall Use The Area Surrounding The Station As It Sees Fit As Long As This Usage Is Not Detrimental To The Functioning Of The Station. 2. Select And Train, As Mutually Agreed Upon, And In Conformity With Nasa's Technical Performance Requirements, Unsa Technical Personnel Responsible For The Operation And Maintenance Of The Satellite Tracking System. Unsa Shall Also Be Responsible For The Administrative Management And Necessary Janitorial Services. Unsa Shall Establish Procedures For Paying Unsa Personnel Their Salaries And Social Benefits.
- 29 Jun 2018
- Igf::Ot::Igf Nasa/Gsfc Has A Requirement To Acquire Support Services For The Administration, Operations, And Maintenance Of The Transportable Laser Ranging System (Tlrs-3) Located At The Universidad Nacional De San Agustin (Unsa) In Arequipa, Peru, Which Is Part Of The Nasa Satellite Laser Ranging Network. The Contractor Shall Provide The Personnel, Materials, And Facilities Necessary To Operate And Maintain The Satellite Tracking Station At Characato, Arequipa, Peru: I. In Accordance With The New International Agreement Between Nasa And The Universidad Nacional De San Agustin (Unsa), Which Was Renewed By Nasa On June 10, 2014 And Confirmed By Unsa On July 2, 2014 (Valid Until October 25, 2019), Unsa, For Its Part, Shall Fulfill The Following Responsibilities: 1. Provide The 1,450-Square-Meter Fenced Site Located At The San Francisco Observatory In Characato, In Addition To The Buildings, Equipment And Materials Owned By Unsa, For Station Operations. It Is Noted That Unsa Shall Use The Area Surrounding The Station As It Sees Fit As Long As This Usage Is Not Detrimental To The Functioning Of The Station. 2. Select And Train, As Mutually Agreed Upon, And In Conformity With Nasa's Technical Performance Requirements, Unsa Technical Personnel Responsible For The Operation And Maintenance Of The Satellite Tracking System. Unsa Shall Also Be Responsible For The Administrative Management And Necessary Janitorial Services. Unsa Shall Establish Procedures For Paying Unsa Personnel Their Salaries And Social Benefits.
- Nasa Goddard Space Flight Center
- National Aeronautics And Space Administration (Nasa)
- $739,136.00
- National Aeronautics And Space Administration (Nasa)
- NNG15VP01C
- Igf::Ot::Igf Nasa/Gsfc Has A Requirement To Acquire Support Services For The Administration, Operations, And Maintenance Of The Transportable Laser Ranging System (Tlrs-3) Located At The Universidad Nacional De San Agustin (Unsa) In Arequipa, Peru, Which Is Part Of The Nasa Satellite Laser Ranging Network. The Contractor Shall Provide The Personnel, Materials, And Facilities Necessary To Operate And Maintain The Satellite Tracking Station At Characato, Arequipa, Peru: I. In Accordance With The New International Agreement Between Nasa And The Universidad Nacional De San Agustin (Unsa), Which Was Renewed By Nasa On June 10, 2014 And Confirmed By Unsa On July 2, 2014 (Valid Until October 25, 2019), Unsa, For Its Part, Shall Fulfill The Following Responsibilities: 1. Provide The 1,450-Square-Meter Fenced Site Located At The San Francisco Observatory In Characato, In Addition To The Buildings, Equipment And Materials Owned By Unsa, For Station Operations. It Is Noted That Unsa Shall Use The Area Surrounding The Station As It Sees Fit As Long As This Usage Is Not Detrimental To The Functioning Of The Station. 2. Select And Train, As Mutually Agreed Upon, And In Conformity With Nasa's Technical Performance Requirements, Unsa Technical Personnel Responsible For The Operation And Maintenance Of The Satellite Tracking System. Unsa Shall Also Be Responsible For The Administrative Management And Necessary Janitorial Services. Unsa Shall Establish Procedures For Paying Unsa Personnel Their Salaries And Social Benefits.
- 31 Jan 2018
- Igf::Ot::Igf Nasa/Gsfc Has A Requirement To Acquire Support Services For The Administration, Operations, And Maintenance Of The Transportable Laser Ranging System (Tlrs-3) Located At The Universidad Nacional De San Agustin (Unsa) In Arequipa, Peru, Which Is Part Of The Nasa Satellite Laser Ranging Network. The Contractor Shall Provide The Personnel, Materials, And Facilities Necessary To Operate And Maintain The Satellite Tracking Station At Characato, Arequipa, Peru: I. In Accordance With The New International Agreement Between Nasa And The Universidad Nacional De San Agustin (Unsa), Which Was Renewed By Nasa On June 10, 2014 And Confirmed By Unsa On July 2, 2014 (Valid Until October 25, 2019), Unsa, For Its Part, Shall Fulfill The Following Responsibilities: 1. Provide The 1,450-Square-Meter Fenced Site Located At The San Francisco Observatory In Characato, In Addition To The Buildings, Equipment And Materials Owned By Unsa, For Station Operations. It Is Noted That Unsa Shall Use The Area Surrounding The Station As It Sees Fit As Long As This Usage Is Not Detrimental To The Functioning Of The Station. 2. Select And Train, As Mutually Agreed Upon, And In Conformity With Nasa's Technical Performance Requirements, Unsa Technical Personnel Responsible For The Operation And Maintenance Of The Satellite Tracking System. Unsa Shall Also Be Responsible For The Administrative Management And Necessary Janitorial Services. Unsa Shall Establish Procedures For Paying Unsa Personnel Their Salaries And Social Benefits.
- Nasa Goddard Space Flight Center
- National Aeronautics And Space Administration (Nasa)
- $574,719.00
- National Aeronautics And Space Administration (Nasa)
- NNG15VP01C
- Nasa/Gsfc Has A Requirement To Acquire Support Services For The Administration, Operations, And Maintenance Of The Transportable Laser Ranging System (Tlrs-3) Located At The Universidad Nacional De San Agustin (Unsa) In Arequipa, Peru, Which Is Part Of The Nasa Satellite Laser Ranging Network. The Contractor Shall Provide The Personnel, Materials, And Facilities Necessary To Operate And Maintain The Satellite Tracking Station At Characato, Arequipa, Peru: I. In Accordance With The New International Agreement Between Nasa And The Universidad Nacional De San Agustin (Unsa), Which Was Renewed By Nasa On June 10, 2014 And Ed By Unsa On July 2, 2014 (Valid Until October 25, 2019), Unsa, For Its Part, Shall Fulfill The Following Responsibilities: 1. Provide The 1,450-Square-Meter Fenced Site Located At The San Francisco Observatory In Characato, In Addition To The Buildings, Equipment And Materials Owned By Unsa, For Station Operations. It Is Noted That Unsa Shall Use The Area Surrounding The Station As It Sees Fit As Long As This Usage Is Not Detrimental To The Functioning Of The Station. 2. Select And Train, As Mutually Agreed Upon, And In Conformity With Nasa's Technical Performance Requirements, Unsa Technical Personnel Responsible For The Operation And Maintenance Of The Satellite Tracking System. Unsa Shall Also Be Responsible For The Administrative Management And Necessary Janitorial Services. Unsa Shall Establish Procedures For Paying Unsa Personnel Their Salaries And Social Benefits.
- 18 Apr 2022
- Nasa/Gsfc Has A Requirement To Acquire Support Services For The Administration, Operations, And Maintenance Of The Transportable Laser Ranging System (Tlrs-3) Located At The Universidad Nacional De San Agustin (Unsa) In Arequipa, Peru, Which Is Part Of The Nasa Satellite Laser Ranging Network. The Contractor Shall Provide The Personnel, Materials, And Facilities Necessary To Operate And Maintain The Satellite Tracking Station At Characato, Arequipa, Peru: I. In Accordance With The New International Agreement Between Nasa And The Universidad Nacional De San Agustin (Unsa), Which Was Renewed By Nasa On June 10, 2014 And Ed By Unsa On July 2, 2014 (Valid Until October 25, 2019), Unsa, For Its Part, Shall Fulfill The Following Responsibilities: 1. Provide The 1,450-Square-Meter Fenced Site Located At The San Francisco Observatory In Characato, In Addition To The Buildings, Equipment And Materials Owned By Unsa, For Station Operations. It Is Noted That Unsa Shall Use The Area Surrounding The Station As It Sees Fit As Long As This Usage Is Not Detrimental To The Functioning Of The Station. 2. Select And Train, As Mutually Agreed Upon, And In Conformity With Nasa's Technical Performance Requirements, Unsa Technical Personnel Responsible For The Operation And Maintenance Of The Satellite Tracking System. Unsa Shall Also Be Responsible For The Administrative Management And Necessary Janitorial Services. Unsa Shall Establish Procedures For Paying Unsa Personnel Their Salaries And Social Benefits.
- Nasa Goddard Space Flight Center
- National Aeronautics And Space Administration (Nasa)
- $744,400.98
- National Aeronautics And Space Administration (Nasa)
- NNG15VP01C
- Nasa/Gsfc Has A Requirement To Acquire Support Services For The Administration, Operations, And Maintenance Of The Transportable Laser Ranging System (Tlrs-3) Located At The Universidad Nacional De San Agustin (Unsa) In Arequipa, Peru, Which Is Part Of The Nasa Satellite Laser Ranging Network. The Contractor Shall Provide The Personnel, Materials, And Facilities Necessary To Operate And Maintain The Satellite Tracking Station At Characato, Arequipa, Peru: I. In Accordance With The New International Agreement Between Nasa And The Universidad Nacional De San Agustin (Unsa), Which Was Renewed By Nasa On June 10, 2014 And Ed By Unsa On July 2, 2014 (Valid Until October 25, 2019), Unsa, For Its Part, Shall Fulfill The Following Responsibilities: 1. Provide The 1,450-Square-Meter Fenced Site Located At The San Francisco Observatory In Characato, In Addition To The Buildings, Equipment And Materials Owned By Unsa, For Station Operations. It Is Noted That Unsa Shall Use The Area Surrounding The Station As It Sees Fit As Long As This Usage Is Not Detrimental To The Functioning Of The Station. 2. Select And Train, As Mutually Agreed Upon, And In Conformity With Nasa's Technical Performance Requirements, Unsa Technical Personnel Responsible For The Operation And Maintenance Of The Satellite Tracking System. Unsa Shall Also Be Responsible For The Administrative Management And Necessary Janitorial Services. Unsa Shall Establish Procedures For Paying Unsa Personnel Their Salaries And Social Benefits.
- 30 Jun 2020
- Nasa/Gsfc Has A Requirement To Acquire Support Services For The Administration, Operations, And Maintenance Of The Transportable Laser Ranging System (Tlrs-3) Located At The Universidad Nacional De San Agustin (Unsa) In Arequipa, Peru, Which Is Part Of The Nasa Satellite Laser Ranging Network. The Contractor Shall Provide The Personnel, Materials, And Facilities Necessary To Operate And Maintain The Satellite Tracking Station At Characato, Arequipa, Peru: I. In Accordance With The New International Agreement Between Nasa And The Universidad Nacional De San Agustin (Unsa), Which Was Renewed By Nasa On June 10, 2014 And Ed By Unsa On July 2, 2014 (Valid Until October 25, 2019), Unsa, For Its Part, Shall Fulfill The Following Responsibilities: 1. Provide The 1,450-Square-Meter Fenced Site Located At The San Francisco Observatory In Characato, In Addition To The Buildings, Equipment And Materials Owned By Unsa, For Station Operations. It Is Noted That Unsa Shall Use The Area Surrounding The Station As It Sees Fit As Long As This Usage Is Not Detrimental To The Functioning Of The Station. 2. Select And Train, As Mutually Agreed Upon, And In Conformity With Nasa's Technical Performance Requirements, Unsa Technical Personnel Responsible For The Operation And Maintenance Of The Satellite Tracking System. Unsa Shall Also Be Responsible For The Administrative Management And Necessary Janitorial Services. Unsa Shall Establish Procedures For Paying Unsa Personnel Their Salaries And Social Benefits.
- Nasa Goddard Space Flight Center
- National Aeronautics And Space Administration (Nasa)
- $744,451.58
- National Aeronautics And Space Administration (Nasa)
- NNG15VP01C
- Nasa/Gsfc Has A Requirement To Acquire Support Services For The Administration, Operations, And Maintenance Of The Transportable Laser Ranging System (Tlrs-3) Located At The Universidad Nacional De San Agustin (Unsa) In Arequipa, Peru, Which Is Part Of The Nasa Satellite Laser Ranging Network. The Contractor Shall Provide The Personnel, Materials, And Facilities Necessary To Operate And Maintain The Satellite Tracking Station At Characato, Arequipa, Peru: I. In Accordance With The New International Agreement Between Nasa And The Universidad Nacional De San Agustin (Unsa), Which Was Renewed By Nasa On June 10, 2014 And Confirmed By Unsa On July 2, 2014 (Valid Until October 25, 2019), Unsa, For Its Part, Shall Fulfill The Following Responsibilities: 1. Provide The 1,450-Square-Meter Fenced Site Located At The San Francisco Observatory In Characato, In Addition To The Buildings, Equipment And Materials Owned By Unsa, For Station Operations. It Is Noted That Unsa Shall Use The Area Surrounding The Station As It Sees Fit As Long As This Usage Is Not Detrimental To The Functioning Of The Station. 2. Select And Train, As Mutually Agreed Upon, And In Conformity With Nasa's Technical Performance Requirements, Unsa Technical Personnel Responsible For The Operation And Maintenance Of The Satellite Tracking System. Unsa Shall Also Be Responsible For The Administrative Management And Necessary Janitorial Services. Unsa Shall Establish Procedures For Paying Unsa Personnel Their Salaries And Social Benefits.
- 27 Sep 2019
- Nasa/Gsfc Has A Requirement To Acquire Support Services For The Administration, Operations, And Maintenance Of The Transportable Laser Ranging System (Tlrs-3) Located At The Universidad Nacional De San Agustin (Unsa) In Arequipa, Peru, Which Is Part Of The Nasa Satellite Laser Ranging Network. The Contractor Shall Provide The Personnel, Materials, And Facilities Necessary To Operate And Maintain The Satellite Tracking Station At Characato, Arequipa, Peru: I. In Accordance With The New International Agreement Between Nasa And The Universidad Nacional De San Agustin (Unsa), Which Was Renewed By Nasa On June 10, 2014 And Confirmed By Unsa On July 2, 2014 (Valid Until October 25, 2019), Unsa, For Its Part, Shall Fulfill The Following Responsibilities: 1. Provide The 1,450-Square-Meter Fenced Site Located At The San Francisco Observatory In Characato, In Addition To The Buildings, Equipment And Materials Owned By Unsa, For Station Operations. It Is Noted That Unsa Shall Use The Area Surrounding The Station As It Sees Fit As Long As This Usage Is Not Detrimental To The Functioning Of The Station. 2. Select And Train, As Mutually Agreed Upon, And In Conformity With Nasa's Technical Performance Requirements, Unsa Technical Personnel Responsible For The Operation And Maintenance Of The Satellite Tracking System. Unsa Shall Also Be Responsible For The Administrative Management And Necessary Janitorial Services. Unsa Shall Establish Procedures For Paying Unsa Personnel Their Salaries And Social Benefits.
- Nasa Goddard Space Flight Center
- National Aeronautics And Space Administration (Nasa)
- $767,548.20
- National Aeronautics And Space Administration (Nasa)