Mirait.T- Acty Jv

CAGE Code: SFR06

NCAGE Code: SFR06

Status: Succeeded(Merged)

Type: Commercial Service Contractor

Summary

Mirait.T- Acty Jv is a Succeeded(Merged) Commercial Service Contractor with the Cage Code SFR06.

Address

3-3-15, Edobori, Nishi-Ku
Osaka
Osaka
550-0002
Japan

Points of Contact

No Points of Contact...

Related Information

No Related Information...

Associated CAGE Codes People who viewed this 'CAGE Code' also viewed...

CAGE Code FAQ Frequently Asked Questions (FAQ) for CAGE SFR06

What is CAGE Code SFR06?
SFR06 is the unique identifier used by NATO Organizations to reference the physical entity known as Mirait.T- Acty Jv located at 3-3-15, Edobori, Nishi-Ku, Osaka, Osaka, 550-0002, Japan.
Who is CAGE Code SFR06?
SFR06 refers to Mirait.T- Acty Jv located at 3-3-15, Edobori, Nishi-Ku, Osaka, Osaka, 550-0002, Japan.
Where is CAGE Code SFR06 Located?
CAGE Code SFR06 is located in Osaka, Japan.

Contracting History for CAGE SFR06 Contracting History for CAGE SFR06 Most Recent 25 Records

N4008420F4470
Ndk-S106, Flcy-Fmc Replace The Steam Decentralization System
2 Jul 2020
Naval Fac Engineering Cmd Far East
Department Of Defense (Dod)
$6,792,170.43
N4008420F4471
Eproject No1650329 San-38 Asbestos Removal At New Sanno Basement
26 Jun 2020
Naval Fac Engineering Cmd Far East
Department Of Defense (Dod)
$2,033,211.52
N4008420F4478
Repaint Interior At 3365, 3354 And 3008
24 Jun 2020
Naval Fac Engineering Cmd Far East
Department Of Defense (Dod)
$1,349,476.67
N4008420F4217
X009 Ysk-A64, Replace Roofs Of Bldgs A64
17 Mar 2020
Naval Fac Engineering Cmd Far East
Department Of Defense (Dod)
$1,160,549.94
N4008420F4217
X003 Ysk-A64, Replace Roof Of Bldgs A64, A66 And A69
25 Aug 2020
Naval Fac Engineering Cmd Far East
Department Of Defense (Dod)
$1,160,549.94
N4008420F4287
Db, Dbb Macc. This Task Order Is To Replace Fire Alarm System At New Sanno Hotel, Bldg. 38, Tokyo, Japan With 630 Calendar Days After Date Of Order.
25 Mar 2020
Naval Fac Engineering Cmd Far East
Department Of Defense (Dod)
$4,570,227.67
N4008420F4079
To Incorporate Dfas 52.204-7018
6 Feb 2020
Naval Fac Engineering Cmd Far East
Department Of Defense (Dod)
$890,654.60
N4008420F4079
Time Extension For Material Delay Due To Covid-19 For The Project, B-1289 Replace Chillers And Cooling Towers At Naf Atsugi, Japan
28 May 2020
Naval Fac Engineering Cmd Far East
Department Of Defense (Dod)
$890,654.60
N4008420F4079
B-1289 Replace Chillers And Cooling Towers At Naf Atsugi, Japan
22 Jan 2020
Naval Fac Engineering Cmd Far East
Department Of Defense (Dod)
$890,654.60
N4008420F4154
Ysk-1942, Upgrade To Led Light Fixtures
31 Jan 2020
Naval Fac Engineering Cmd Far East
Department Of Defense (Dod)
$3,448,362.72
N4008419F4511
Igf::Ot::Igf Ysk-Stln001 Replace Steam Piping
28 Jun 2019
Naval Fac Engineering Cmd Far East
Department Of Defense (Dod)
$2,215,500.00
N4008419F4511
Ysk-Stln001 Replace Steam Piping
27 Feb 2020
Naval Fac Engineering Cmd Far East
Department Of Defense (Dod)
$2,215,500.00
N4008419F4253
Replace Roof And Carpet Bldg. No. 181 At Naf Atsugi
21 Mar 2019
Naval Fac Engineering Cmd Far East
Department Of Defense (Dod)
$948,081.35
N4008419D0074
Db/Dbb Kanto Plains Macc: This Modification Incorporates Revised Roofing Specification And Mandatory Dfars Clauses
26 May 2020
Naval Fac Engineering Cmd Far East
Department Of Defense (Dod)
$0.00
N4008419D0074
Idiq Fy19 Big Macc For Various Clients In The Kanto Plains Operational Area, Japan
18 Sep 2019
Naval Fac Engineering Cmd Far East
Department Of Defense (Dod)
$0.00
N4008419D0074
Db/Dbb Kanto Plains Macc
28 Jun 2019
Naval Fac Engineering Cmd Far East
Department Of Defense (Dod)
$0.00
N4008419F4259
Third Option Period Idiq Big Macc, Ysk-1556 Replace Fan Coil Units And Condensate Lines. This Modification Is For Lift The Suspension Of Work Effective 25 September 2019. Extend 198 Days From 4 April 2019 With No Additional Cost.
17 Sep 2019
Naval Fac Engineering Cmd Far East
Department Of Defense (Dod)
$2,455,333.54
N4008419F4259
Secon Option Period Idiq Big Macc. This Task Order Is To Replace Fan Coil Units At Ysk-1556 At Cfay With 390 Calendar Days After Date Of Order.
11 Mar 2019
Naval Fac Engineering Cmd Far East
Department Of Defense (Dod)
$2,455,333.54
N4008419F4259
Third Option Period Idiq Big Macc, Ysk-1556 Replace Fan Coil Units And Condensate Lines. This Modification Is For Suspension Of Work By 120 Calendar Days Effective 17 March 2019, Due To Other Contractor Is Now Working At Ysk-1556, And Correct Typographical Errors Of Task Order.
29 May 2019
Naval Fac Engineering Cmd Far East
Department Of Defense (Dod)
$2,455,333.54
N4008419F4274
Correct Contract Completion Date.
13 May 2019
Naval Fac Engineering Cmd Far East
Department Of Defense (Dod)
$1,569,083.59
N4008419F4274
Install Fire Pump Bldg 467 At Us Naf Atsugi, Japan
26 Mar 2019
Naval Fac Engineering Cmd Far East
Department Of Defense (Dod)
$1,569,083.59
N4008419F4398
Additional Acm Removal For Repair Air Terminal Bldg. No. 206
23 Sep 2020
Naval Fac Engineering Cmd Far East
Department Of Defense (Dod)
$11,796,648.02
N4008419F4398
Modification To Incorporate Final Design To A Task Order For Repair Air Terminal Bldg. No. 206
5 Aug 2020
Naval Fac Engineering Cmd Far East
Department Of Defense (Dod)
$11,796,648.02
N4008419F4398
Repair Air Terminal Bldg. No. 206 At Naf Atsugi
28 Jun 2019
Naval Fac Engineering Cmd Far East
Department Of Defense (Dod)
$11,796,648.02
N4008419F4214
Modify Existing Steam Heater, Ysk-1235, Big Macc
26 Feb 2019
Naval Fac Engineering Cmd Far East
Department Of Defense (Dod)
$1,129,094.99