Advanced Rotorcraft Technology, Inc.
Dba Advanced Technology Inc
CAGE Code: 9Y605
NCAGE Code: 9Y605
Status: Active
Type: Commercial Supplier
Dun & Bradstreet (DUNS): 149732315
Summary
Advanced Rotorcraft Technology, Inc., Dba Advanced Technology Inc is an Active Commercial Supplier with the Cage Code 9Y605 and is tracked by Dun & Bradstreet under DUNS Number 149732315..
Address
46757 Fremont Blvd
Fremont CA 94538-6539
United States
Points of Contact
No Points of Contact...
Related Information
People who viewed this 'CAGE Code' also viewed...
Virtual Reps 365 Llc Micon Telecommunications Inc Russell Morrison Consolite Corp Tatro And Wheeler, Inc. Diamond Flower Instrument Co Ames W V-B Co The Shipreme Meltz Baking Co Microniche Information Systems Inc Vishay Dale Electronics Llc Informix Systems Journal Onsite Environmental Laboratories, Liberty Global Solutions Llc Se Systems Inc Makita Usa Inc T C R Services Arsys Innotech Corp. Paciwave, Inc. Jetcomp Inc
Frequently Asked Questions (FAQ) for CAGE 9Y605
- What is CAGE Code 9Y605?
- 9Y605 is the unique identifier used by NATO Organizations to reference the physical entity known as Advanced Rotorcraft Technology, Inc. Dba Advanced Technology Inc located at 46757 Fremont Blvd, Fremont CA 94538-6539, United States.
- Who is CAGE Code 9Y605?
- 9Y605 refers to Advanced Rotorcraft Technology, Inc. Dba Advanced Technology Inc located at 46757 Fremont Blvd, Fremont CA 94538-6539, United States.
- Where is CAGE Code 9Y605 Located?
- CAGE Code 9Y605 is located in Fremont, CA, USA.
Contracting History for CAGE 9Y605 Most Recent 25 Records
- FA864923P1004
- Applying The Flight Certification (Flicert) Design And Certification Tool To Original Equipment Manufacturer (Oem) Electric Vertical Take Off And Landing (Evtol) Applications
- 13 Sep 2023
- Applying The Flight Certification (Flicert) Design And Certification Tool To Original Equipment Manufacturer (Oem) Electric Vertical Take Off And Landing (Evtol) Applications
- Fa8649 Usaf Sbir Sttr Contracting
- Department Of Defense (Dod)
- $749,950.00
- Department Of Defense (Dod)
- 80NSSC21C0610
- Improved Fidelity Simulation Models For Vtol Concept Vehicles
- 27 Sep 2023
- Improved Fidelity Simulation Models For Vtol Concept Vehicles
- Nasa Shared Services Center
- National Aeronautics And Space Administration (Nasa)
- $574,430.00
- National Aeronautics And Space Administration (Nasa)
- 80NSSC21C0610
- Improved Fidelity Simulation Models For Vtol Concept Vehicles
- 13 Dec 2021
- Improved Fidelity Simulation Models For Vtol Concept Vehicles
- Nasa Shared Services Center
- National Aeronautics And Space Administration (Nasa)
- $535,430.00
- National Aeronautics And Space Administration (Nasa)
- 80NSSC21C0610
- Eo14042 Improve Fidelity Simulation Models For Vtol Concept Vehicles
- 14 Oct 2021
- Eo14042 Improve Fidelity Simulation Models For Vtol Concept Vehicles
- Nasa Shared Services Center
- National Aeronautics And Space Administration (Nasa)
- $535,430.00
- National Aeronautics And Space Administration (Nasa)
- 80NSSC21C0610
- Improved Fidelity Simulation Models For Vtol Concept Vehicles
- 23 Aug 2021
- Improved Fidelity Simulation Models For Vtol Concept Vehicles
- Nasa Shared Services Center
- National Aeronautics And Space Administration (Nasa)
- $535,430.00
- National Aeronautics And Space Administration (Nasa)
- 80NSSC21C0610
- Improved Fidelity Simulation Models For Vtol Concept Vehicles
- 1 Sep 2023
- Improved Fidelity Simulation Models For Vtol Concept Vehicles
- Nasa Shared Services Center
- National Aeronautics And Space Administration (Nasa)
- $535,430.00
- National Aeronautics And Space Administration (Nasa)
- 80NSSC21C0610
- Eo14042 Improved Fidelity Simulation Models For Vtol Concept Vehicles
- 14 Feb 2023
- Eo14042 Improved Fidelity Simulation Models For Vtol Concept Vehicles
- Nasa Shared Services Center
- National Aeronautics And Space Administration (Nasa)
- $535,430.00
- National Aeronautics And Space Administration (Nasa)
- 80NSSC21C0610
- Eo14042 Improved Fidelity Simulation Models For Vtol Concept Vehicles
- 17 Sep 2022
- Eo14042 Improved Fidelity Simulation Models For Vtol Concept Vehicles
- Nasa Shared Services Center
- National Aeronautics And Space Administration (Nasa)
- $535,430.00
- National Aeronautics And Space Administration (Nasa)
- FA864921P1614
- F2-14902 Sttr Phase Ii Cfd Augmented Comprehensive Evtol Analysts And Certification Tool
- 3 Aug 2021
- F2-14902 Sttr Phase Ii Cfd Augmented Comprehensive Evtol Analysts And Certification Tool
- Fa8649 Usaf Sbir Sttr Contracting
- Department Of Defense (Dod)
- $749,985.00
- Department Of Defense (Dod)
- FA864921P1614
- F2-14902 Sttr Phase Ii Update Clin 0005 Submit Updated Sbir/Sttr Lifecycle Certification See Special Contract Requirements. 6 Certifications After Award.
- 4 Aug 2021
- F2-14902 Sttr Phase Ii Update Clin 0005 Submit Updated Sbir/Sttr Lifecycle Certification See Special Contract Requirements. 6 Certifications After Award.
- Fa8649 Usaf Sbir Sttr Contracting
- Department Of Defense (Dod)
- $749,985.00
- Department Of Defense (Dod)
- W913E521P0013
- Vvpm Software U437g00
- 6 Apr 2021
- Vvpm Software U437g00
- W2r2 Cold Rgns Rsch Eng Lab
- Department Of Defense (Dod)
- $30,000.00
- Department Of Defense (Dod)
- FA864921P0086
- Small Business Technology Transfer, Augmented Comprehensive Evtol Analysis And Certification Tool
- 18 Nov 2020
- Small Business Technology Transfer, Augmented Comprehensive Evtol Analysis And Certification Tool
- Fa8649 Usaf Sbir Sttr Contracting
- Department Of Defense (Dod)
- $149,997.00
- Department Of Defense (Dod)
- W911QX21C0002
- Exercise Of Option Modification For Sbir Ii Topic A2-8160 - Modeling And Control Methods For Future Vertical Lift Rotorcraft Fatigue Reduction
- 20 Jan 2022
- Exercise Of Option Modification For Sbir Ii Topic A2-8160 - Modeling And Control Methods For Future Vertical Lift Rotorcraft Fatigue Reduction
- W6qk Acc-Apg Adelphi
- Department Of Defense (Dod)
- $1,074,645.74
- Department Of Defense (Dod)
- W58RGZ21C0034
- Army Aviation Sbir Phase Ii For Proposal Entitled, "Advanced Comprehensive Analysis Tool For Emerging Vertical Lift Configurations"
- 7 Feb 2023
- Army Aviation Sbir Phase Ii For Proposal Entitled, "Advanced Comprehensive Analysis Tool For Emerging Vertical Lift Configurations"
- W6qk Acc-Rsa
- Department Of Defense (Dod)
- $1,099,976.66
- Department Of Defense (Dod)
- W58RGZ21C0034
- Army Aviation Sbir Phase Ii For Proposal Entitled, "Advanced Comprehensive Analysis Tool For Emerging Vertical Lift Configurations"
- 4 Aug 2022
- Army Aviation Sbir Phase Ii For Proposal Entitled, "Advanced Comprehensive Analysis Tool For Emerging Vertical Lift Configurations"
- W6qk Acc-Rsa
- Department Of Defense (Dod)
- $1,099,976.66
- Department Of Defense (Dod)
- W58RGZ21C0034
- Army Aviation Sbir Phase Ii For Proposal Entitled, "Advanced Comprehensive Analysis Tool For Emerging Vertical Lift Configurations"
- 13 Aug 2023
- Army Aviation Sbir Phase Ii For Proposal Entitled, "Advanced Comprehensive Analysis Tool For Emerging Vertical Lift Configurations"
- W6qk Acc-Rsa
- Department Of Defense (Dod)
- $1,899,956.66
- Department Of Defense (Dod)
- W58RGZ21C0034
- Army Aviation Sbir Phase Ii For Proposal Entitled, "Advanced Comprehensive Analysis Tool For Emerging Vertical Lift Configurations"
- 20 Sep 2021
- Army Aviation Sbir Phase Ii For Proposal Entitled, "Advanced Comprehensive Analysis Tool For Emerging Vertical Lift Configurations"
- W6qk Acc-Rsa
- Department Of Defense (Dod)
- $549,993.64
- Department Of Defense (Dod)
- W911QX21C0007
- Stop Work Order Modification For A Sbir Phase Ii - Topic A19-019 Prop No A2-8159 "Physics-Based Unified Uav Design And Analysis Tool"
- 21 Apr 2022
- Stop Work Order Modification For A Sbir Phase Ii - Topic A19-019 Prop No A2-8159 "Physics-Based Unified Uav Design And Analysis Tool"
- W6qk Acc-Apg Adelphi
- Department Of Defense (Dod)
- $1,099,939.15
- Department Of Defense (Dod)
- W911QX21C0007
- Incremental Funding Modification For Clin 0001 Sbir Phase Ii - Topic A19-019 Prop No A2-8159 "Physics-Based Unified Uav Design And Analysis Tool"
- 21 Jun 2022
- Incremental Funding Modification For Clin 0001 Sbir Phase Ii - Topic A19-019 Prop No A2-8159 "Physics-Based Unified Uav Design And Analysis Tool"
- W6qk Acc-Apg Adelphi
- Department Of Defense (Dod)
- $1,099,939.15
- Department Of Defense (Dod)
- W911QX21C0007
- No Cost Extension Modification For Clin 0001-0002 Sbir Phase Ii - Topic A19-019 Prop No A2-8159 "Physics-Based Unified Uav Design And Analysis Tool."
- 28 Feb 2023
- No Cost Extension Modification For Clin 0001-0002 Sbir Phase Ii - Topic A19-019 Prop No A2-8159 "Physics-Based Unified Uav Design And Analysis Tool."
- W6qk Acc-Apg Adelphi
- Department Of Defense (Dod)
- $1,099,939.15
- Department Of Defense (Dod)
- W911W618C0034
- Fy 17 Rapid Innovation Remove Funds
- 3 Aug 2023
- Fy 17 Rapid Innovation Remove Funds
- W6qk Aatd Contr Off
- Department Of Defense (Dod)
- $999,999.98
- Department Of Defense (Dod)
- 9531BM23P0064
- 2-Bladded Teetering Helicopter Model
- 25 Sep 2023
- 2-Bladded Teetering Helicopter Model
- Ntsb Acq Lease Mgmt Division
- National Transportation Safety Board (Ntsb)
- $59,000.00
- National Transportation Safety Board (Ntsb)
- 9531BM19P0050
- Rotorcraft Engineering Simulation Software Maintenance Agreements
- 31 Aug 2022
- Rotorcraft Engineering Simulation Software Maintenance Agreements
- Ntsb Acq Lease Mgmt Division
- National Transportation Safety Board (Ntsb)
- $75,600.00
- National Transportation Safety Board (Ntsb)
- 692M1524P00012
- Procurement Of Art Flight Lab Development System, Vvpm Add-On & Training In Support Of Cockpit Simulation Facility Vertical Flight Aviation Simulation Technology Lab.
- 4 Jan 2024
- Procurement Of Art Flight Lab Development System, Vvpm Add-On & Training In Support Of Cockpit Simulation Facility Vertical Flight Aviation Simulation Technology Lab.
- 692M15 Acquisition & Grants, Aaq600
- Department Of Transportation (Dot)
- $149,500.00
- Department Of Transportation (Dot)
- W911QX19P0190
- 6 Month Sbir Phase I Topic A19-020. The Contractor Shall Research And Develop A Modeling And Control Methods For Future Vertical Lift Rotorcraft Fatigue Reduction.
- 15 Aug 2019
- 6 Month Sbir Phase I Topic A19-020. The Contractor Shall Research And Develop A Modeling And Control Methods For Future Vertical Lift Rotorcraft Fatigue Reduction.
- W6qk Acc-Apg Adelphi
- Department Of Defense (Dod)
- $162,493.56
- Department Of Defense (Dod)