Tri-State Generation And
Transmission Association, Inc.
CAGE Code: 8PSB5
NCAGE Code: 8PSB5
Status: Active
Type: Commercial Supplier
Summary
Tri-State Generation And, Transmission Association, Inc. is an Active Commercial Supplier with the Cage Code 8PSB5.
Address
1100, West 116Th Avenue
Westminster CO 80234-2814
United States
Points of Contact
No Points of Contact...
Related Information
No Related Information...
People who viewed this 'CAGE Code' also viewed...
Mission Knives, Inc. Western Illuminated Plastics Patrick Construction Building And Microage Of Denver/Boulder Signia Aerospace, Llc C And S Elevator Co Inc Lincoln Mfg Co Inc Worleyparsons Komex Inc. Karavan Rec-Creative Inc Mccahan Property Services, Inc Aztec Cadcom Systems Super Pc Memory, Inc. Wandel And Goltermann Inc Yowell Equipment Demolition Inc Innovative Metal Designs, Inc Independent Power Systems J. Joseph Gartland Jr. Inc. Rka Recruiting Llc Denali Ventures Inc Woodstream Corp Fenwick Products Inc
Frequently Asked Questions (FAQ) for CAGE 8PSB5
- What is CAGE Code 8PSB5?
- 8PSB5 is the unique identifier used by NATO Organizations to reference the physical entity known as Tri-State Generation And Transmission Association, Inc. located at 1100, West 116Th Avenue, Westminster CO 80234-2814, United States.
- Who is CAGE Code 8PSB5?
- 8PSB5 refers to Tri-State Generation And Transmission Association, Inc. located at 1100, West 116Th Avenue, Westminster CO 80234-2814, United States.
- Where is CAGE Code 8PSB5 Located?
- CAGE Code 8PSB5 is located in Westminster, CO, USA.
Contracting History for CAGE 8PSB5 Most Recent 25 Records
- 140R4020P0089
- The Purpose Of This Bi-Lateral No Cost Modification Is To Incorporate Revised Sow.
- 15 Oct 2020
- The Purpose Of This Bi-Lateral No Cost Modification Is To Incorporate Revised Sow.
- Upper Colorado Regional Office
- Department Of The Interior (Doi)
- $100,000.00
- Department Of The Interior (Doi)
- 140R4020P0089
- Preliminary Work To Relocate The Transmission Lines At Elephant Butte Power Plant From The Power Plant Roof To The Designated New Switchyard Across The River.
- 18 Sep 2020
- Preliminary Work To Relocate The Transmission Lines At Elephant Butte Power Plant From The Power Plant Roof To The Designated New Switchyard Across The River.
- Upper Colorado Regional Office
- Department Of The Interior (Doi)
- $49,190.18
- Department Of The Interior (Doi)
- 140R4020P0089
- The Purpose Of This Modification Is To Terminate The Purchase Order For Convenience To The Government And Close Out Order.
- 3 Mar 2022
- The Purpose Of This Modification Is To Terminate The Purchase Order For Convenience To The Government And Close Out Order.
- Upper Colorado Regional Office
- Department Of The Interior (Doi)
- $49,190.18
- Department Of The Interior (Doi)