Emerald Electrical Consultants Llc
CAGE Code: 8E9G3
NCAGE Code: 8E9G3
Status: Active
Type: Commercial Supplier
Summary
Emerald Electrical Consultants Llc is an Active Commercial Supplier with the Cage Code 8E9G3.
Address
2575 Jason Industrial Pkwy
Unit C
Winston GA 30187-2170
United States
Points of Contact
No Points of Contact...
Related Information
No Related Information...
People who viewed this 'CAGE Code' also viewed...
Broadwater Controls Michael Kelly Boondockers Equipment Llc Jay Electric Agate Consulting Inc Arrow Ender Transportation Llc Jensen's Tree Service, Inc. Ameritech Architectural Inc Petersen Paul J Dba Asap Excavation Orsus Inc Poverty Creek Volunteer Fire Diamond Jack C Winston-Chloride Volunteer Fire Morrow Enterprises Inc. Schattenkerk William Gordon Alan Box B Enterprises Inc Freeland Douglas G Altitude Concepts Alum-A-Lift Inc
Frequently Asked Questions (FAQ) for CAGE 8E9G3
- What is CAGE Code 8E9G3?
- 8E9G3 is the unique identifier used by NATO Organizations to reference the physical entity known as Emerald Electrical Consultants Llc located at 2575 Jason Industrial Pkwy, Unit C, Winston GA 30187-2170, United States.
- Who is CAGE Code 8E9G3?
- 8E9G3 refers to Emerald Electrical Consultants Llc located at 2575 Jason Industrial Pkwy, Unit C, Winston GA 30187-2170, United States.
- Where is CAGE Code 8E9G3 Located?
- CAGE Code 8E9G3 is located in Winston, GA, USA.
Contracting History for CAGE 8E9G3 Most Recent 25 Records
- 89503222CWA000064
- Beaver Creek Substation And Cheyenne Substation Breaker Replacements
- 7 Apr 2022
- Beaver Creek Substation And Cheyenne Substation Breaker Replacements
- Western-Rocky Mountain Region
- Department Of Energy (Doe)
- $1,099,386.76
- Department Of Energy (Doe)
- 89503222CWA000064
- Beaver Creek Substation And Cheyenne Substation Breaker Replacements
- 28 Mar 2022
- Beaver Creek Substation And Cheyenne Substation Breaker Replacements
- Western-Rocky Mountain Region
- Department Of Energy (Doe)
- $1,099,386.76
- Department Of Energy (Doe)
- 89503222CWA000064
- P00003 Is Being Issued For Additional Materials Needed And Extend Period Of Performance For 120 Days. Extend The End Date From May 2, 2023, To August 30, 2023 For The Beaver Creek Substation And Cheyenne Substation Breaker Replacements.
- 25 Apr 2023
- P00003 Is Being Issued For Additional Materials Needed And Extend Period Of Performance For 120 Days. Extend The End Date From May 2, 2023, To August 30, 2023 For The Beaver Creek Substation And Cheyenne Substation Breaker Replacements.
- Western-Rocky Mountain Region
- Department Of Energy (Doe)
- $1,109,446.27
- Department Of Energy (Doe)