Honeybee Robotics Llc
Div Honeybee Robotics Exploration
Technology

CAGE Code: 8DST0

NCAGE Code: 8DST0

Status: Sale Through Distribution Only (No Procurement)

Type: Manufacturer

Summary

Honeybee Robotics Llc, Div Honeybee Robotics Exploration, Technology is a Sale Through Distribution Only (No Procurement) Manufacturer with the Cage Code 8DST0.

Address

2408 Lincoln Avenue
Altadena CA 91001-5436
United States

Points of Contact

No Points of Contact...

Related Information

No Related Information...

Associated CAGE Codes People who viewed this 'CAGE Code' also viewed...

CAGE Code FAQ Frequently Asked Questions (FAQ) for CAGE 8DST0

What is CAGE Code 8DST0?
8DST0 is the unique identifier used by NATO Organizations to reference the physical entity known as Honeybee Robotics Llc Div Honeybee Robotics Exploration Technology located at 2408 Lincoln Avenue, Altadena CA 91001-5436, United States.
Who is CAGE Code 8DST0?
8DST0 refers to Honeybee Robotics Llc Div Honeybee Robotics Exploration Technology located at 2408 Lincoln Avenue, Altadena CA 91001-5436, United States.
Where is CAGE Code 8DST0 Located?
CAGE Code 8DST0 is located in Altadena, CA, USA.

Contracting History for CAGE 8DST0 Contracting History for CAGE 8DST0 Most Recent 25 Records

80LARC21CA006
Design, Prototype, And Test The Lunar Array Mast And Power System, A Solar Panel System Designed To Provide 10 Kilowatts Of Electrical Power And Be Robotically Deployable At The South Pole Of The Lunar Surface.
23 Oct 2023
Nasa Langley Research Center
National Aeronautics And Space Administration (Nasa)
$4,904,509.00
80LARC21CA006
Design, Prototype, And Test The Lunar Array Mast And Power System (Lamps), A Solar Panel System Designed To Provide 10 Kilowatts Of Electrical Power And Be Robotically Deployable At The South Pole Of The Lunar Surface.
24 May 2023
Nasa Langley Research Center
National Aeronautics And Space Administration (Nasa)
$2,802,221.00
80LARC21CA006
Eo14042 Design, Prototype, And Test The Lunar Array Mast And Power System (Lamps), A Solar Panel System Designed To Provide 10 Kilowatts Of Electrical Power And Be Robotically Deployable At The South Pole Of The Lunar Surface.
25 Apr 2023
Nasa Langley Research Center
National Aeronautics And Space Administration (Nasa)
$2,601,840.00
80LARC21CA006
Design, Prototype, And Test The Lunar Array Mast And Power System, A Solar Panel System Designed To Provide 10 Kilowatts Of Electrical Power And Be Robotically Deployable At The South Pole Of The Lunar Surface.
21 Sep 2023
Nasa Langley Research Center
National Aeronautics And Space Administration (Nasa)
$2,902,221.00
80KSC020P0021
Polar Resources Ice Mining Experiment -1 (Prime) The Regolith And Ice Drill For Exploring New Terrain (Trident) Drill Fabrication And Testing. Mod 10: Incorporate Statement Of Work Revision 7 And Revised Milestones Payment Schedule.
24 Feb 2023
Nasa Kennedy Space Center
National Aeronautics And Space Administration (Nasa)
$7,394,637.25
80KSC020P0021
Polar Resources Ice Mining Experiment -1 (Prime) The Regolith And Ice Drill For Exploring New Terrain (Trident) Drill Fabrication And Testing. Mod 11: Incorporate Contract Changes Listed At Paragraphs A Thru N. Funding And Values Are Increased.
21 Jun 2023
Nasa Kennedy Space Center
National Aeronautics And Space Administration (Nasa)
$7,394,637.25
80KSC020P0021
Eo14042 Prime1 Trident Drill Fabrication And Testing. Mod 6: Incorporate Far Clause I.9 52.223-99 Ensuring Adequate Covid-19 Safety Protocols For Federal Contractors (Oct 2021) (Deviation)
13 Oct 2021
Nasa Kennedy Space Center
National Aeronautics And Space Administration (Nasa)
$7,394,637.25
80KSC020P0021
Polar Resources Ice Mining Experiment -1 (Prime) The Regolith And Ice Drill For Exploring New Terrain (Trident) Drill Fabrication And Testing. No Cost Extension To 1/15/2024.
22 Dec 2023
Nasa Kennedy Space Center
National Aeronautics And Space Administration (Nasa)
$7,394,637.25
80KSC020P0021
Polar Resources Ice Mining Experiment -1 (Prime) The Regolith And Ice Drill For Exploring New Terrain (Trident) Drill Fabrication And Testing. Modification Revises Statement Of Work, Incorporates Milestone Payment Schedule, And Deletes A Clause.
21 Aug 2020
Nasa Kennedy Space Center
National Aeronautics And Space Administration (Nasa)
$7,394,637.25
80KSC020P0021
Polar Resources Ice Mining Experiment -1 (Prime) The Regolith And Ice Drill For Exploring New Terrain (Trident) Drill Fabrication And Testing. Extends Tasks 1 & 2, Adds Task 12 And 13. The Purchase Order Value Is Increased $805,214.25.
28 Sep 2021
Nasa Kennedy Space Center
National Aeronautics And Space Administration (Nasa)
$7,394,637.25
80KSC020P0021
Polar Resources Ice Mining Experiment -1 (Prime) The Regolith And Ice Drill For Exploring New Terrain (Trident) Drill Fabrication And Testing. No Cost Extension To 01/19/2023.
22 Aug 2022
Nasa Kennedy Space Center
National Aeronautics And Space Administration (Nasa)
$7,394,637.25
80KSC020P0021
Polar Resources Ice Mining Experiment -1 (Prime) The Regolith And Ice Drill For Exploring New Terrain (Trident) Drill Fabrication And Testing. Incorporates Far 52.204-24 And 52.204-25.
24 Sep 2020
Nasa Kennedy Space Center
National Aeronautics And Space Administration (Nasa)
$7,394,637.25
80KSC020P0021
Polar Resources Ice Mining Experiment -1 (Prime) The Regolith And Ice Drill For Exploring New Terrain (Trident) Drill Fabrication And Testing. Mod 9: Incorporate Statement Of Work Revision 6, And Milestone Payment Schedule
13 Dec 2022
Nasa Kennedy Space Center
National Aeronautics And Space Administration (Nasa)
$7,394,637.25
80KSC020P0021
Polar Resources Ice Mining Experiment -1 (Prime) The Regolith And Ice Drill For Exploring New Terrain (Trident) Drill Fabrication And Testing. Modification To Remove And Replace Statement Of Work And Increase Funding $1,034,195.00.
19 Mar 2021
Nasa Kennedy Space Center
National Aeronautics And Space Administration (Nasa)
$7,394,637.25
80KSC020P0021
Polar Resources Ice Mining Experiment -1 (Prime) The Regolith And Ice Drill For Exploring New Terrain (Trident) Drill Fabrication And Testing.
31 Jul 2020
Nasa Kennedy Space Center
National Aeronautics And Space Administration (Nasa)
$7,394,637.25
80KSC020P0021
Polar Resources Ice Mining Experiment -1 (Prime) The Regolith And Ice Drill For Exploring New Terrain (Trident) Drill Fabrication And Testing. Replace Clause 1852.204-76 (Nov 11) With 1852.204-76 (Deviation 21-01).
30 Sep 2021
Nasa Kennedy Space Center
National Aeronautics And Space Administration (Nasa)
$7,394,637.25
80KSC020P0021
Prime1 Trident Drill Fabrication And Testing. Mod 7: Incorporate The Government And Contractor Agreed Upon Revised Deliverable Dates. Dates Extended At No Cost To The Government.
7 Feb 2022
Nasa Kennedy Space Center
National Aeronautics And Space Administration (Nasa)
$7,394,637.25
80GSFC20C0115
The Sample Acquisition At Mars (Sam) Suite Investigation Will Cast A Wide Analytical Net To Capture Chemical Indicators Of The Habitability Of Mars. Sam Will "Find The Carbon" Revealing Their Likely Source And Transformational Processes.
13 Apr 2023
Nasa Goddard Space Flight Center
National Aeronautics And Space Administration (Nasa)
$1,371,600.00
80GSFC20C0115
The Sample Acquisition At Mars (Sam) Suite Investigation Will Cast A Wide Analytical Net To Capture Chemical Indicators Of The Habitability Of Mars. Sam Will "Find The Carbon" Revealing Their Likely Source And Transformational Processes.
27 Jun 2023
Nasa Goddard Space Flight Center
National Aeronautics And Space Administration (Nasa)
$1,844,175.00
80GSFC20C0115
The Sample Acquisition At Mars (Sam) Suite Investigation Will Cast A Wide Analytical Net To Capture Chemical Indicators Of The Habitability Of Mars. Sam Will "Find The Carbon" Revealing Their Likely Source And Transformational Processes.
13 Jun 2023
Nasa Goddard Space Flight Center
National Aeronautics And Space Administration (Nasa)
$1,844,175.00
80MSFC20C0007
The Contractor Shall Develop Technology For Acquiring And Transferring Regolith From The Lunar Surface To Instruments And Sample Return Containers
29 Sep 2023
Nasa Marshall Space Flight Center
National Aeronautics And Space Administration (Nasa)
$6,220,076.00
80MSFC20C0007
The Contractor Shall Develop Technology For Acquiring And Transferring Regolith From The Lunar Surface To Instruments And Sample Return Containers
4 Dec 2023
Nasa Marshall Space Flight Center
National Aeronautics And Space Administration (Nasa)
$6,220,076.00
80MSFC20C0007
The Contractor Shall Develop Technology For Acquiring And Transferring Regolith From The Lunar Surface To Instruments And Sample Return Containers
7 Jul 2023
Nasa Marshall Space Flight Center
National Aeronautics And Space Administration (Nasa)
$6,046,696.00
80GSFC19C0022
Draco (Drill For Acquisition Of Complex Organics) Mission
22 Aug 2023
Nasa Goddard Space Flight Center
National Aeronautics And Space Administration (Nasa)
$73,878,091.04
80NSSC23PA614
Cooling Fan Assembly
28 Feb 2023
Nasa Shared Services Center
National Aeronautics And Space Administration (Nasa)
$235,800.00