Hdr And Tehama Joint Venture

CAGE Code: 8CAY6

NCAGE Code: 8CAY6

Status: Active

Type: Commercial Supplier

Summary

Hdr And Tehama Joint Venture is an Active Commercial Supplier with the Cage Code 8CAY6.

Address

2345 Grand Blvd Ste 700
Kansas City MO 64108-2625
United States

Points of Contact

No Points of Contact...

Related Information

No Related Information...

Associated CAGE Codes People who viewed this 'CAGE Code' also viewed...

CAGE Code FAQ Frequently Asked Questions (FAQ) for CAGE 8CAY6

What is CAGE Code 8CAY6?
8CAY6 is the unique identifier used by NATO Organizations to reference the physical entity known as Hdr And Tehama Joint Venture located at 2345 Grand Blvd Ste 700, Kansas City MO 64108-2625, United States.
Who is CAGE Code 8CAY6?
8CAY6 refers to Hdr And Tehama Joint Venture located at 2345 Grand Blvd Ste 700, Kansas City MO 64108-2625, United States.
Where is CAGE Code 8CAY6 Located?
CAGE Code 8CAY6 is located in Kansas City, MO, USA.

Contracting History for CAGE 8CAY6 Contracting History for CAGE 8CAY6 Most Recent 25 Records

W50S8X23F0002
Qmsn172511, Repair Base Infrastructure Design
28 Sep 2023
W7mx Uspfo Activity Caang 129
Department Of Defense (Dod)
$829,998.50
W912DR23F0369
Clin 3- Meetings And Recordkeeping.
26 Sep 2023
W2sd Endist Baltimore
Department Of Defense (Dod)
$399,617.63
FA488723F0096
Architect And Engineering Services To Complete The Area Development Plan For The Munitions Compound At Luke Afb.
13 Sep 2023
Fa4887 56 Cons Cc
Department Of Defense (Dod)
$386,701.44
FA488723F0096
A&E For Luke Afb Munitions Area Development Plan
5 Oct 2023
Fa4887 56 Cons Cc
Department Of Defense (Dod)
$386,701.44
FA303023F0085
Ae Services For Road Repair At Goodfellow Afb.
12 Sep 2023
Fa3030 17 Cons Cc
Department Of Defense (Dod)
$376,742.17
FA700023F0165
Boundary Line Survey, Linear Segmentation, And Water Study For Usafa, Farish And Bullseye.
29 Sep 2023
Fa7000 10 Cons Lgc
Department Of Defense (Dod)
$16,701,431.00
FA448423F0324
A&E Study Water System
28 Sep 2023
Fa4484 87 Cons Pk
Department Of Defense (Dod)
$626,549.54
FA485523F0030
This Is A Architect And Engineer Preliminary Charrette Report To Repair Fire Suppression On Hanger 208 At Cannon Afb.
26 Jun 2023
Fa4855 27 Socons Lgc
Department Of Defense (Dod)
$199,631.13
FA286022F0126
Suspension Of Work Pending Egress Option Required For Design Completion.
18 Apr 2023
Fa2860 316 Cons Pk
Department Of Defense (Dod)
$535,062.98
FA286022F0126
Incorporate Sow Revisions For Egress Options
12 Sep 2023
Fa2860 316 Cons Pk
Department Of Defense (Dod)
$535,062.98
FA286022F0126
Design-Repair/Recommission Fire Suppression System, Bldg. 1754 (Hangar 3)
30 Sep 2022
Fa2860 316 Cons Pk
Department Of Defense (Dod)
$535,062.98
FA286022F0126
Extend Pop
29 Mar 2023
Fa2860 316 Cons Pk
Department Of Defense (Dod)
$535,062.98
W912DR22F0329
In-Scope Modification For National Environmental Policy Act And Environmental Baseline Survey Support To The Air National Guard
27 Sep 2023
W2sd Endist Baltimore
Department Of Defense (Dod)
$928,351.49
FA286022F0102
Title I Services For B1791
31 Aug 2023
Fa2860 316 Cons Pk
Department Of Defense (Dod)
$249,888.48
FA286022F0102
Title I Services For Bldg 1791
10 Jan 2023
Fa2860 316 Cons Pk
Department Of Defense (Dod)
$249,888.48
FA286022F0102
Title I Services For Bldg 1791
12 Sep 2022
Fa2860 316 Cons Pk
Department Of Defense (Dod)
$249,888.48
FA813722F0082
A-E Next Idiq Pool 3- Task Order - Industrial Waste Treatment Plant (Iwtp) System Facilities Study, Tinker Afb, Ok
19 May 2023
Fa8137 Afmc Pzioc
Department Of Defense (Dod)
$601,601.13
FA813722F0081
Ae Next Task Order - Facilities Study B3 Comprehensive Assessment.
27 Sep 2022
Fa8137 Afmc Pzioc
Department Of Defense (Dod)
$261,177.96
FA309922F0007
The Purpose Of This Bilateral Modification Is To Extend The Pop By 55 Calendar Days. The Reason For This Time Extension Is To Account For Time Needed To Incorporate Div 01 Specs And Additional 65% Afcec Review Comments In The 95% Design Package.
7 Apr 2023
Fa3099 47 Conf Cc
Department Of Defense (Dod)
$281,739.27
FA309922F0007
The Purpose Of This Modification Is To Extend The Period Of Performance For The 35% Design.
1 Nov 2022
Fa3099 47 Conf Cc
Department Of Defense (Dod)
$281,739.27
FA309922F0007
The Purpose Of This Project Is To Complete A 100 Design To Remove The Existing High Expansion Foam System (Hefs) In Building 50 Hangar 1 And Replace With An Automatic Water Sprinkler System
15 Aug 2022
Fa3099 47 Conf Cc
Department Of Defense (Dod)
$281,739.27
W912DR22F0291
Joint Base Myer Henderson Hall - Environmental Condition Of Property (Ecp) Assessment
28 Sep 2022
W2sd Endist Baltimore
Department Of Defense (Dod)
$299,486.47
FA461022F0104
Planning Task Order, Charrette Report Requirement For Spaceport Of The Future Infrastructure Roadmap At Vandenberg Sfb.
15 Sep 2022
Fa4610 30 Cons Pk
Department Of Defense (Dod)
$1,499,550.66
FA461022F0104
Planning Task Order, Charrette Report Requirement For Spaceport Of The Future Infrastructure Roadmap At Vandenberg Sfb.
26 Sep 2023
Fa4610 30 Cons Pk
Department Of Defense (Dod)
$1,499,550.66
FA461022F0046
12-1156B, Concept Design, Replace Overhead Distribution Line K3
30 Jun 2022
Fa4610 30 Cons Pk
Department Of Defense (Dod)
$296,550.05