Pacific Federal Contractors Llc
CAGE Code: 86SC7
NCAGE Code: 86SC7
Status: Active
Type: Commercial Supplier
Summary
Pacific Federal Contractors Llc is an Active Commercial Supplier with the Cage Code 86SC7.
Address
1938 Hau St
Honolulu HI 96819-3255
United States
Points of Contact
No Points of Contact...
Related Information
No Related Information...
People who viewed this 'CAGE Code' also viewed...
Best Instant Signs Pacific Sign And Graphics Ali'i Kai International Holding American Heart Assn Hawaii Affil Designs On Time George House Usa Inc Pacific Rim Productions Ltd Peacock Gaudio Sales And Marketing Versa Tec Co Gouvea's Inc J.T.E. Inc L. Kang Inc. Hawaii Integrated Inc Hpc Foods, Ltd. Island Coffee Co Johnson Joan M Co Mac Farms Of Hawaii Llc O K Distributors Pacific Poultry Co Ltd Island Banana Company Inc Dba Daily
Frequently Asked Questions (FAQ) for CAGE 86SC7
- What is CAGE Code 86SC7?
- 86SC7 is the unique identifier used by NATO Organizations to reference the physical entity known as Pacific Federal Contractors Llc located at 1938 Hau St, Honolulu HI 96819-3255, United States.
- Who is CAGE Code 86SC7?
- 86SC7 refers to Pacific Federal Contractors Llc located at 1938 Hau St, Honolulu HI 96819-3255, United States.
- Where is CAGE Code 86SC7 Located?
- CAGE Code 86SC7 is located in Honolulu, HI, USA.
Contracting History for CAGE 86SC7 Most Recent 25 Records
- W912J620C0001
- Knmd189008 F22 Composite Repair Facility Change Amount In Change Order No. 04 And Incorporate Change Order No. 05. Clin 006 Change Order No. 04 Decrease Amount, Change To $4,496.01. Remove Nte. Clin 007 Incorporate Change Order No. 05 For $19,398.97.
- 18 Mar 2022
- Knmd189008 F22 Composite Repair Facility Change Amount In Change Order No. 04 And Incorporate Change Order No. 05. Clin 006 Change Order No. 04 Decrease Amount, Change To $4,496.01. Remove Nte. Clin 007 Incorporate Change Order No. 05 For $19,398.97.
- W7m4 Uspfo Activity Hi Arng
- Department Of Defense (Dod)
- $20,621,441.96
- Department Of Defense (Dod)
- W912J620C0001
- The Purpose Of This Modification Is To Incorporate Addendum No. 04, Dated 9-Aug-2021. Addendum No. 04 Made To Drawings For Project No. Knmd189008, Construct Addition To Lo/Crf, B3408.
- 16 Aug 2021
- The Purpose Of This Modification Is To Incorporate Addendum No. 04, Dated 9-Aug-2021. Addendum No. 04 Made To Drawings For Project No. Knmd189008, Construct Addition To Lo/Crf, B3408.
- W7m4 Uspfo Activity Hi Arng
- Department Of Defense (Dod)
- $20,440,413.77
- Department Of Defense (Dod)
- W912J620C0001
- Knmd189008 F22 Composite Repair Facility - Construct Lo/Crf Bay Addition - Reconfigure Existing Mechanical Areas - Sitework And Utilities Knmd162546 Repair Fire Suppression B3408
- 1 Apr 2021
- Knmd189008 F22 Composite Repair Facility - Construct Lo/Crf Bay Addition - Reconfigure Existing Mechanical Areas - Sitework And Utilities Knmd162546 Repair Fire Suppression B3408
- W7m4 Uspfo Activity Hi Arng
- Department Of Defense (Dod)
- $20,397,508.00
- Department Of Defense (Dod)
- W912J620C0001
- Extend The Period Of Performance 60 Non-Compensable Days As A Result Of A Delayed Finish From Unforeseen Delays Of Installation Of The Pcc Pavement, And The Delayed Start In Hangar Door Installation.
- 7 Sep 2023
- Extend The Period Of Performance 60 Non-Compensable Days As A Result Of A Delayed Finish From Unforeseen Delays Of Installation Of The Pcc Pavement, And The Delayed Start In Hangar Door Installation.
- W7m4 Uspfo Activity Hi Arng
- Department Of Defense (Dod)
- $22,498,064.05
- Department Of Defense (Dod)
- W912J620C0001
- The Purpose Of This Modification Is To Incorporate Change Order No. 03. The Period Of Performance Will Not Be Extended For This Work.
- 18 Nov 2021
- The Purpose Of This Modification Is To Incorporate Change Order No. 03. The Period Of Performance Will Not Be Extended For This Work.
- W7m4 Uspfo Activity Hi Arng
- Department Of Defense (Dod)
- $20,482,326.15
- Department Of Defense (Dod)
- W912J620C0001
- Knmd189008 F22 Composite Repair Facility. The Purpose Of This Modification Is To Have Previously Incorporated By Reference Contract Clause To Now Be Included As Full Text. Far Clause 52.203-13 Contractor Code Of Business Ethics And Conduct.
- 26 May 2021
- Knmd189008 F22 Composite Repair Facility. The Purpose Of This Modification Is To Have Previously Incorporated By Reference Contract Clause To Now Be Included As Full Text. Far Clause 52.203-13 Contractor Code Of Business Ethics And Conduct.
- W7m4 Uspfo Activity Hi Arng
- Department Of Defense (Dod)
- $20,397,508.00
- Department Of Defense (Dod)
- W912J620C0001
- The Purpose Of This Modification Is To Incorporate Addendum No. 05, Dated 17-Jun-2022. Addendum No. 05 Made To Drawings And Specifications For Project No. Knmd189008, Construction Addition To Lo/Crf, B3408
- 15 Feb 2023
- The Purpose Of This Modification Is To Incorporate Addendum No. 05, Dated 17-Jun-2022. Addendum No. 05 Made To Drawings And Specifications For Project No. Knmd189008, Construction Addition To Lo/Crf, B3408
- W7m4 Uspfo Activity Hi Arng
- Department Of Defense (Dod)
- $20,873,064.05
- Department Of Defense (Dod)
- W912J620C0001
- Extend The Period Of Performance 60 Non-Compensable Days As A Result On Unforeseen Shipping Delays, And The Delayed Start In Uniformity Testing.
- 10 Jul 2023
- Extend The Period Of Performance 60 Non-Compensable Days As A Result On Unforeseen Shipping Delays, And The Delayed Start In Uniformity Testing.
- W7m4 Uspfo Activity Hi Arng
- Department Of Defense (Dod)
- $22,498,064.05
- Department Of Defense (Dod)
- W912J620C0001
- Knmd189008 F22 Composite Repair Facility. Incorporate Fire Suppression System (Fss) Redesign. $1,625,000.00. The Period Of Performance Will Be Extended 463 Calendar Days For This Work.
- 27 Sep 2023
- Knmd189008 F22 Composite Repair Facility. Incorporate Fire Suppression System (Fss) Redesign. $1,625,000.00. The Period Of Performance Will Be Extended 463 Calendar Days For This Work.
- W7m4 Uspfo Activity Hi Arng
- Department Of Defense (Dod)
- $22,498,064.05
- Department Of Defense (Dod)
- W912J620C0001
- The Purpose Of This Modification Is To Incorporate Change Order No. 07 For Rfp-019 Steel Manufacturer Cost Per Addendum No. 04. Design Deficiency. The Period Of Performance Will Not Be Extended For This Work.
- 29 Jun 2022
- The Purpose Of This Modification Is To Incorporate Change Order No. 07 For Rfp-019 Steel Manufacturer Cost Per Addendum No. 04. Design Deficiency. The Period Of Performance Will Not Be Extended For This Work.
- W7m4 Uspfo Activity Hi Arng
- Department Of Defense (Dod)
- $20,665,164.05
- Department Of Defense (Dod)
- W912J620C0001
- The Purpose Of This Modification Is To Incorporate Change Order No. 01 - Rfi Revisions Waterline-Concrete F-22 Locrf 3Rd Bay B3408. The Period Of Performance Will Not Be Extended For This Work.
- 16 Sep 2021
- The Purpose Of This Modification Is To Incorporate Change Order No. 01 - Rfi Revisions Waterline-Concrete F-22 Locrf 3Rd Bay B3408. The Period Of Performance Will Not Be Extended For This Work.
- W7m4 Uspfo Activity Hi Arng
- Department Of Defense (Dod)
- $20,482,326.15
- Department Of Defense (Dod)
- W912J620C0001
- Knmd189008 F22 Composite Repair Facility. Incorporate Change Order No. 08. The Period Of Performance Will Be Extended 215 Calendar Days For This Work. Add Clin 0010 To Incorporate Change Order No. 08 For $207,900.00.
- 26 Jan 2023
- Knmd189008 F22 Composite Repair Facility. Incorporate Change Order No. 08. The Period Of Performance Will Be Extended 215 Calendar Days For This Work. Add Clin 0010 To Incorporate Change Order No. 08 For $207,900.00.
- W7m4 Uspfo Activity Hi Arng
- Department Of Defense (Dod)
- $20,873,064.05
- Department Of Defense (Dod)
- W912J620C0001
- Extend The Period Of Performance 60 Non-Compensable Days As A Result On Unforeseen Shipping Delays, And The Delayed Start In Testing Related To Project's Stringent Airfield Pavement Requirements.
- 10 May 2023
- Extend The Period Of Performance 60 Non-Compensable Days As A Result On Unforeseen Shipping Delays, And The Delayed Start In Testing Related To Project's Stringent Airfield Pavement Requirements.
- W7m4 Uspfo Activity Hi Arng
- Department Of Defense (Dod)
- $20,873,064.05
- Department Of Defense (Dod)
- W912J620C0001
- Knmd189008 F22 Composite Repair Facility - Contaminated Soil Testing
- 22 Nov 2021
- Knmd189008 F22 Composite Repair Facility - Contaminated Soil Testing
- W7m4 Uspfo Activity Hi Arng
- Department Of Defense (Dod)
- $20,621,441.96
- Department Of Defense (Dod)
- W912J620C0001
- Knmd189008 F22 Composite Repair Facility. Incorporate Change Order No. 06. The Period Of Performance Will Be Extended 58 Calendar Days For This Work. Add Clin 0008 And Subclins 0008Aa Through 0008Ag To Incorporate Change Order No. 06 For $119,720.83.
- 18 Apr 2022
- Knmd189008 F22 Composite Repair Facility. Incorporate Change Order No. 06. The Period Of Performance Will Be Extended 58 Calendar Days For This Work. Add Clin 0008 And Subclins 0008Aa Through 0008Ag To Incorporate Change Order No. 06 For $119,720.83.
- W7m4 Uspfo Activity Hi Arng
- Department Of Defense (Dod)
- $20,665,164.05
- Department Of Defense (Dod)