Capital Construction Llc
CAGE Code: 82XJ5
NCAGE Code: 82XJ5
Status: Active
Type: Commercial Supplier
Summary
Capital Construction Llc is an Active Commercial Supplier with the Cage Code 82XJ5.
Address
649 W 54Th Ave
Anchorage AK 99518-1138
United States
Points of Contact
No Points of Contact...
Related Information
No Related Information...
People who viewed this 'CAGE Code' also viewed...
Alaska Garden And Pet Supply Cabinet Doctors Inc Alaska Engineering And Business Gunderson Equipment Ltd B4 Aac Jv, Llc Artic Chain Doyle Transport King Crabb Productions C A Excavating La-Z-Boy Furniture Galleries University Of Alaska Anchorage The Golden Construction Metro Electric Inc Cpi Carts And Parts Inc Oasis Environmental Inc Joyce James Austin Touch N Go K And W Interiors Alaska Land Clearing Contractors, Anchorage Taxicab Co Inc
Frequently Asked Questions (FAQ) for CAGE 82XJ5
- What is CAGE Code 82XJ5?
- 82XJ5 is the unique identifier used by NATO Organizations to reference the physical entity known as Capital Construction Llc located at 649 W 54Th Ave, Anchorage AK 99518-1138, United States.
- Who is CAGE Code 82XJ5?
- 82XJ5 refers to Capital Construction Llc located at 649 W 54Th Ave, Anchorage AK 99518-1138, United States.
- Where is CAGE Code 82XJ5 Located?
- CAGE Code 82XJ5 is located in Anchorage, AK, USA.
Contracting History for CAGE 82XJ5 Most Recent 25 Records
- FA500023C0037
- Project To Install Fitness Flooring (Artificial Turf) In The Infield Of The Track In The Main Hangar Bay At Building 7309.
- 13 Sep 2023
- Project To Install Fitness Flooring (Artificial Turf) In The Infield Of The Track In The Main Hangar Bay At Building 7309.
- Fa5000 673 Cons Lgc
- Department Of Defense (Dod)
- $637,000.00
- Department Of Defense (Dod)
- FA500023C0025
- This Project Consists Of Painting The Interior Walls Within The Main Chapel In Building 3, Replacing Two Glass Window Pieces, And Removing And Replacing The Flooring As Shown In The Drawings.
- 27 Jul 2023
- This Project Consists Of Painting The Interior Walls Within The Main Chapel In Building 3, Replacing Two Glass Window Pieces, And Removing And Replacing The Flooring As Shown In The Drawings.
- Fa5000 673 Cons Lgc
- Department Of Defense (Dod)
- $131,337.00
- Department Of Defense (Dod)
- FA500022C0048
- Glenn Highway Sign
- 28 Apr 2023
- Glenn Highway Sign
- Fa5000 673 Cons Lgc
- Department Of Defense (Dod)
- $66,590.00
- Department Of Defense (Dod)
- FA500022P0177
- Repair Concrete And Install Steel Stairs
- 17 Apr 2023
- Repair Concrete And Install Steel Stairs
- Fa5000 673 Cons Lgc
- Department Of Defense (Dod)
- $173,000.00
- Department Of Defense (Dod)
- FA500021C0062
- Renovate Bldg. 952
- 14 Aug 2023
- Renovate Bldg. 952
- Fa5000 673 Cons Lgc
- Department Of Defense (Dod)
- $1,873,865.97
- Department Of Defense (Dod)
- FA500021C0062
- Period Of Performance Extension
- 30 Jun 2023
- Period Of Performance Extension
- Fa5000 673 Cons Lgc
- Department Of Defense (Dod)
- $1,873,865.97
- Department Of Defense (Dod)
- FA500021C0062
- Renovate Bldg 952
- 13 Sep 2021
- Renovate Bldg 952
- Fa5000 673 Cons Lgc
- Department Of Defense (Dod)
- $1,892,000.00
- Department Of Defense (Dod)
- FA500021C0062
- Hjzh 21-1408, Renovate Bldg. 952. Pop Extension Mod
- 28 Oct 2022
- Hjzh 21-1408, Renovate Bldg. 952. Pop Extension Mod
- Fa5000 673 Cons Lgc
- Department Of Defense (Dod)
- $1,804,309.97
- Department Of Defense (Dod)
- FA500021C0062
- Hjzh 21-1408, Renovate Bldg 952. Work Reduction Mod.
- 9 Sep 2022
- Hjzh 21-1408, Renovate Bldg 952. Work Reduction Mod.
- Fa5000 673 Cons Lgc
- Department Of Defense (Dod)
- $1,804,309.97
- Department Of Defense (Dod)
- FA500021P0086
- Replace Fire Suppression System At Jber,Ak.
- 27 Jul 2021
- Replace Fire Suppression System At Jber,Ak.
- Fa5000 673 Cons Lgc
- Department Of Defense (Dod)
- $75,000.00
- Department Of Defense (Dod)
- FA500021C0051
- Hjzh 21-4003, Repair Piping& Hvac B750
- 14 Jun 2022
- Hjzh 21-4003, Repair Piping& Hvac B750
- Fa5000 673 Cons Lgc
- Department Of Defense (Dod)
- $1,085,108.00
- Department Of Defense (Dod)
- FA500021C0051
- Period Of Performance Time Extension
- 31 Aug 2022
- Period Of Performance Time Extension
- Fa5000 673 Cons Lgc
- Department Of Defense (Dod)
- $1,085,108.00
- Department Of Defense (Dod)
- FA500021C0051
- Repair Piping & Hvac B750
- 29 Jul 2021
- Repair Piping & Hvac B750
- Fa5000 673 Cons Lgc
- Department Of Defense (Dod)
- $1,009,200.00
- Department Of Defense (Dod)
- FA500021C0050
- Replacement Of Multiple Doors In Cys Facilities
- 28 Jul 2021
- Replacement Of Multiple Doors In Cys Facilities
- Fa5000 673 Cons Lgc
- Department Of Defense (Dod)
- $301,898.00
- Department Of Defense (Dod)
- FA500021C0050
- Replace Exterior Doors At Base Cdc
- 18 Jul 2022
- Replace Exterior Doors At Base Cdc
- Fa5000 673 Cons Lgc
- Department Of Defense (Dod)
- $261,992.00
- Department Of Defense (Dod)
- FA500021C0050
- Install Exterior Doors At Installation Child Development Center
- 16 Feb 2023
- Install Exterior Doors At Installation Child Development Center
- Fa5000 673 Cons Lgc
- Department Of Defense (Dod)
- $301,898.00
- Department Of Defense (Dod)
- FA500021C0050
- Replace Exterior Doors At Cdc Iaw Fc 4-740-14F, Cdc Facility Design Guide. 3-4.2.2.4 Exit Requirements
- 4 Nov 2022
- Replace Exterior Doors At Cdc Iaw Fc 4-740-14F, Cdc Facility Design Guide. 3-4.2.2.4 Exit Requirements
- Fa5000 673 Cons Lgc
- Department Of Defense (Dod)
- $301,898.00
- Department Of Defense (Dod)
- FA500021P0077
- Renovate Bldg. 55
- 28 Jul 2021
- Renovate Bldg. 55
- Fa5000 673 Cons Lgc
- Department Of Defense (Dod)
- $348,200.00
- Department Of Defense (Dod)
- FA500021C0050
- Extend Period Of Performance.
- 1 Aug 2022
- Extend Period Of Performance.
- Fa5000 673 Cons Lgc
- Department Of Defense (Dod)
- $261,992.00
- Department Of Defense (Dod)
- FA500021P0077
- Renovate Building 55
- 11 Jul 2022
- Renovate Building 55
- Fa5000 673 Cons Lgc
- Department Of Defense (Dod)
- $615,282.00
- Department Of Defense (Dod)
- FA500021P0070
- A. Provide Labor, Material, And Equipment To Complete The Work Scope Changes Described Within The Mod #1 Sow And Gfp Furnishings Layout. B. Extend The Completion Date To 30 August 2022.
- 24 May 2022
- A. Provide Labor, Material, And Equipment To Complete The Work Scope Changes Described Within The Mod #1 Sow And Gfp Furnishings Layout. B. Extend The Completion Date To 30 August 2022.
- Fa5000 673 Cons Lgc
- Department Of Defense (Dod)
- $121,003.00
- Department Of Defense (Dod)
- FA500021P0070
- Reconfigure Offices Bldg. 730
- 20 Jul 2021
- Reconfigure Offices Bldg. 730
- Fa5000 673 Cons Lgc
- Department Of Defense (Dod)
- $121,003.00
- Department Of Defense (Dod)
- FA500021C0036
- Mold Remediation.
- 11 Jan 2022
- Mold Remediation.
- Fa5000 673 Cons Lgc
- Department Of Defense (Dod)
- $156,650.00
- Department Of Defense (Dod)
- FA500021C0036
- Project Is To Renovate Two (2) Small Offices, One (1) Large Open Office, And Install One (1) Man Door For Fire Egress Near An Overhead Door On Joint Base Elmendorf-Richardson, Ak.
- 20 Jul 2021
- Project Is To Renovate Two (2) Small Offices, One (1) Large Open Office, And Install One (1) Man Door For Fire Egress Near An Overhead Door On Joint Base Elmendorf-Richardson, Ak.
- Fa5000 673 Cons Lgc
- Department Of Defense (Dod)
- $156,650.00
- Department Of Defense (Dod)
- FA500021C0034
- Correct Pay Office.
- 1 Oct 2021
- Correct Pay Office.
- Fa5000 673 Cons Lgc
- Department Of Defense (Dod)
- $18,000.00
- Department Of Defense (Dod)