Tomas Osinski Design Inc.
CAGE Code: 819Z7
NCAGE Code: 819Z7
Status: Discontinued
Type: Commercial Supplier
Summary
Tomas Osinski Design Inc. is a Discontinued Commercial Supplier with the Cage Code 819Z7.
Address
4240 Glenmuir Ave
Los Angeles CA 90065-3941
United States
Points of Contact
No Points of Contact...
Related Information
No Related Information...
People who viewed this 'CAGE Code' also viewed...
Simco Sales, Inc. G I Maintenance Los Angeles Potato Distributors Inc Pacific Radio Electronics Computer Graphics & Networking, Inc. Lehigh Safety Shoe Co Calumet Photographic Inc General Photo-Grapic Inc Fairchild Aviation Recorders Data Grimes-Stassforth Stationary Co Tork-Master Div Of General Controls Victory Salvage Inc. Abbott Instrument And Engineering Co Ells Dick Co Fiedler C O Cc Security Systems University Of California National Sam Sung Air Control Llc Electronic Stationers Gentle Touch House Keeping Llc
Frequently Asked Questions (FAQ) for CAGE 819Z7
- What is CAGE Code 819Z7?
- 819Z7 is the unique identifier used by NATO Organizations to reference the physical entity known as Tomas Osinski Design Inc. located at 4240 Glenmuir Ave, Los Angeles CA 90065-3941, United States.
- Who is CAGE Code 819Z7?
- 819Z7 refers to Tomas Osinski Design Inc. located at 4240 Glenmuir Ave, Los Angeles CA 90065-3941, United States.
- Where is CAGE Code 819Z7 Located?
- CAGE Code 819Z7 is located in Los Angeles, CA, USA.
Contracting History for CAGE 819Z7 Most Recent 25 Records
- 47PM0218C0006
- Section 889
- 1 Apr 2020
- Section 889
- Pbs Ncr Capital Construction Ctr 2
- General Services Administration (Gsa)
- $8,263,824.68
- General Services Administration (Gsa)
- 47PM0218C0006
- Contract 47Pm0218c0006, Tapestry For Eisenhower Memorial, Wash., Dc Mod Ps0003 Credit For Unused Wire Funds The Contractor's Signature In Block 15B Indicates His Agreement To A Credit In The Amount Of $400,000.00 For Unused Wire Funds. This Modification Is For The Tapestry Artist To Issue A Credit Back For Unused Wire Funds. Clin 0004 Mod 1 - Increased Tapestry Background Density As A Part Of The Artwork ($400,000.00) Rwa N1794807 Reference Tomas Osinski Proposal Dated 04/23/19 And Scope Of Work Accounting Line Wpiaa-18-0006.2019.192X.11.P1140001.Pg80.Pg413.K01..Dc0097zz..1794807.1....... From $1,640,464.40 To $1,240,464.40. Completion Date Remains: 12/31/2019 All Work Is To Be Accomplished In Accordance With All Applicable Regulations, Requirements And Standards. All Terms And Conditions Remain In Full Force And Effect.
- 6 May 2019
- Contract 47Pm0218c0006, Tapestry For Eisenhower Memorial, Wash., Dc Mod Ps0003 Credit For Unused Wire Funds The Contractor's Signature In Block 15B Indicates His Agreement To A Credit In The Amount Of $400,000.00 For Unused Wire Funds. This Modification Is For The Tapestry Artist To Issue A Credit Back For Unused Wire Funds. Clin 0004 Mod 1 - Increased Tapestry Background Density As A Part Of The Artwork ($400,000.00) Rwa N1794807 Reference Tomas Osinski Proposal Dated 04/23/19 And Scope Of Work Accounting Line Wpiaa-18-0006.2019.192X.11.P1140001.Pg80.Pg413.K01..Dc0097zz..1794807.1....... From $1,640,464.40 To $1,240,464.40. Completion Date Remains: 12/31/2019 All Work Is To Be Accomplished In Accordance With All Applicable Regulations, Requirements And Standards. All Terms And Conditions Remain In Full Force And Effect.
- Pbs Ncr Capital Construction Ctr 2
- General Services Administration (Gsa)
- $9,110,921.40
- General Services Administration (Gsa)
- 47PM0218C0006
- 47Pm0218c0006, Requirement For Metal Tapestry Panels For Eisenhower Memorial, Washington, Dc. Mod Po0001 Exercise Option 1 And Option 2 Effective With This Modification, The Government Is Hereby Exercising Tapestry Options 1&2 As An Aggregate Add To The Contract In The Amount Of $3,608,457.00. Option1 And Option 2 Were Accepted And Awarded Upon Contract Execution With A Reservation To Exercise In Accordance With The Contract Schedule And Requirements As Stated In The Contract. The Period Of Performance For Option 1 And Option 2 Extends To December 31, 2019. Clin 0002: Option 1 Fabrication Of The Metal Tapestry Panels. Add $3,342,857.00. The Government Hereby Exercises This Option In Accordance With The Contract Schedule And Requirements . The Period Of Performance For The Option 1 Work End On December 31 2019. Clin 0003: Option 2 Installation Oversight Of The Metal Tapestry Panels. Add $265,500.00. The Government Hereby Exercises This Option In Accordance With The Contract Schedule And Requirements. The Period Of Performance For Option 2 Extends To December 31, 2019. Period Of Performance Extended To 12/31/2019. All Work Is To Be Accomplished In Accordance With All Contract Requirements And Standards. All Terms And Conditions Remain In Full Force And Effect.
- 10 Sep 2018
- 47Pm0218c0006, Requirement For Metal Tapestry Panels For Eisenhower Memorial, Washington, Dc. Mod Po0001 Exercise Option 1 And Option 2 Effective With This Modification, The Government Is Hereby Exercising Tapestry Options 1&2 As An Aggregate Add To The Contract In The Amount Of $3,608,457.00. Option1 And Option 2 Were Accepted And Awarded Upon Contract Execution With A Reservation To Exercise In Accordance With The Contract Schedule And Requirements As Stated In The Contract. The Period Of Performance For Option 1 And Option 2 Extends To December 31, 2019. Clin 0002: Option 1 Fabrication Of The Metal Tapestry Panels. Add $3,342,857.00. The Government Hereby Exercises This Option In Accordance With The Contract Schedule And Requirements . The Period Of Performance For The Option 1 Work End On December 31 2019. Clin 0003: Option 2 Installation Oversight Of The Metal Tapestry Panels. Add $265,500.00. The Government Hereby Exercises This Option In Accordance With The Contract Schedule And Requirements. The Period Of Performance For Option 2 Extends To December 31, 2019. Period Of Performance Extended To 12/31/2019. All Work Is To Be Accomplished In Accordance With All Contract Requirements And Standards. All Terms And Conditions Remain In Full Force And Effect.
- Pbs Ncr Capital Construction Ctr 2
- General Services Administration (Gsa)
- $9,510,921.40
- General Services Administration (Gsa)
- 47PM0218C0006
- Modification Ps0002 - Tapestry Increased Background The Contractor's Signature In Block 15(B) Indicates Its Agreement To Provide Related Materials And Labor For The Tapestry Background Increased Density As Of Part Of The Artwork In Accordance With Clin #4. This Is An Add To The Contract In The Amount Of $1,640,646.40. The New Aggregate Contract Total Amount Is $9,510,921.40. The Contract Period Of Performance End Date Will Remain Through December 31, 2019. All Work Is To Be Accomplished In Accordance With All Applicable Contract Requirements And Standards.
- 26 Nov 2018
- Modification Ps0002 - Tapestry Increased Background The Contractor's Signature In Block 15(B) Indicates Its Agreement To Provide Related Materials And Labor For The Tapestry Background Increased Density As Of Part Of The Artwork In Accordance With Clin #4. This Is An Add To The Contract In The Amount Of $1,640,646.40. The New Aggregate Contract Total Amount Is $9,510,921.40. The Contract Period Of Performance End Date Will Remain Through December 31, 2019. All Work Is To Be Accomplished In Accordance With All Applicable Contract Requirements And Standards.
- Pbs Ncr Capital Construction Ctr 2
- General Services Administration (Gsa)
- $9,510,921.40
- General Services Administration (Gsa)
- 47PM0218C0006
- Added Rods And Machine Shipping
- 12 May 2020
- Added Rods And Machine Shipping
- Pbs Ncr Ofc Of Acquisition Mgmt
- General Services Administration (Gsa)
- $8,282,967.17
- General Services Administration (Gsa)
- 47PM0218C0006
- Credit For Unused Allowances And Contingencies Obligated Under The Base Contract And Contract Modification For Additional Wire.
- 23 Dec 2019
- Credit For Unused Allowances And Contingencies Obligated Under The Base Contract And Contract Modification For Additional Wire.
- Pbs Ncr Capital Construction Ctr 2
- General Services Administration (Gsa)
- $8,263,824.68
- General Services Administration (Gsa)
- 47PM0218C0006
- No Cost Decommit Mod
- 10 Jan 2020
- No Cost Decommit Mod
- Pbs Ncr Capital Construction Ctr 2
- General Services Administration (Gsa)
- $8,263,824.68
- General Services Administration (Gsa)
- 47PM0218C0006
- Furnish And Install Metal Tapestry Panels For Dwight D. Eisenhower Memorial, Wash., Dc
- 6 Feb 2018
- Furnish And Install Metal Tapestry Panels For Dwight D. Eisenhower Memorial, Wash., Dc
- Pbs Ncr Capital Construction Ctr 2
- General Services Administration (Gsa)
- $8,282,967.17
- General Services Administration (Gsa)