Barber Klein - Foresight Jv Llc
Dba Barber Klein Contractors Pllc

CAGE Code: 7VSB4

NCAGE Code: 7VSB4

Status: Active

Type: Commercial Supplier

Summary

Barber Klein - Foresight Jv Llc, Dba Barber Klein Contractors Pllc is an Active Commercial Supplier with the Cage Code 7VSB4.

Address

7254 Golden Wings Rd Unit 9
Jacksonville FL 32244-3321
United States

Points of Contact

No Points of Contact...

Related Information

No Related Information...

Associated CAGE Codes People who viewed this 'CAGE Code' also viewed...

CAGE Code FAQ Frequently Asked Questions (FAQ) for CAGE 7VSB4

What is CAGE Code 7VSB4?
7VSB4 is the unique identifier used by NATO Organizations to reference the physical entity known as Barber Klein - Foresight Jv Llc Dba Barber Klein Contractors Pllc located at 7254 Golden Wings Rd Unit 9, Jacksonville FL 32244-3321, United States.
Who is CAGE Code 7VSB4?
7VSB4 refers to Barber Klein - Foresight Jv Llc Dba Barber Klein Contractors Pllc located at 7254 Golden Wings Rd Unit 9, Jacksonville FL 32244-3321, United States.
Where is CAGE Code 7VSB4 Located?
CAGE Code 7VSB4 is located in Jacksonville, FL, USA.

Contracting History for CAGE 7VSB4 Contracting History for CAGE 7VSB4 Most Recent 25 Records

80KSC018F0021
Revitalize Kennedy Space Center's Water And Waste Water Systems, Phase 6 Mod 3: A. The Purpose Of This Modification Is To Perform A Wet-Tap Installation In Lieu Of A Center Wide Outage (Attachment 1), In The Amount Of $23,460. B. As A Result Of This Modification, The Total Contract Value Will Increase From $3,450,459.06 To $3,473,919.06; An Increase Of $23,460. C. The Contract Completion Date Remains June 16, 2019. D. Change Block 22 Of The Sf 1442 To Read $3,473,919.06 In Lieu Of $3,450,459.06; An Increase Of $23,460. E. Statement Of Release: In Consideration Of The Modification Agreed To Herein As Complete Equitable Adjustment For The Negotiated Wet-Tap Change, The Contractor Hereby Releases The Government From Any And All Liability For Further Equitable Adjustments Attributable To Such Facts Or Circumstances Giving Rise To This Change.
9 Nov 2018
Nasa Kennedy Space Center
National Aeronautics And Space Administration (Nasa)
$3,735,105.06
80KSC018F0021
Revitalize Kennedy Space Center's Water And Waste Water Systems, Phase 6 Mod 26: Extends The Contract Completion Date By 7 Days In Order To Allow For The Negotiation Of Tracking Number (Tn)-13. Contract Is Hereby Extended To 3-30-22.
23 Mar 2022
Nasa Kennedy Space Center
National Aeronautics And Space Administration (Nasa)
$3,735,105.06
80JSC018F0018
Repair Sanitary Sewer System At Jsc
13 Feb 2019
Nasa Johnson Space Center
National Aeronautics And Space Administration (Nasa)
$6,735,334.54
80KSC018F0021
Revitalize Kennedy Space Center's Water And Waste Water Systems, Phase 6. Modification Provides An Equitable Adjustment For Impacts Resulting From Restricted Access Due To Covid 19. Completion Date Extended To 10/14/20 And An Increase Of $17,498
24 Jul 2020
Nasa Kennedy Space Center
National Aeronautics And Space Administration (Nasa)
$3,735,105.06
80KSC018F0021
Revitalize Kennedy Space Center's Water And Waste Water Systems, Phase 6. The Purpose Of The Modification Is To Extend The Contract Completion Date By 7 Days At No Additional Cost To The Government. As A Result Of This Modification The Contract Completion Date Of February 27, 2020 Is Hereby Extended To March 5, 2020.
27 Feb 2020
Nasa Kennedy Space Center
National Aeronautics And Space Administration (Nasa)
$3,735,105.06
80JSC018F0018
Repair Sanitary Sewer System At Jsc
27 Mar 2018
Nasa Johnson Space Center
National Aeronautics And Space Administration (Nasa)
$6,735,334.54
80JSC018F0018
Repair Sanitary Sewer System At Jsc
9 Apr 2020
Nasa Johnson Space Center
National Aeronautics And Space Administration (Nasa)
$6,735,334.54
80SSC018D0002
This Regionalized Multiple Award Construction Contract Two (Macc-Ii) Shall Result In The Award Of A Maximum Of Twenty-Four (24) Indefinite Delivery/Indefinite Quantity (Idiq) In Support Macc-Ii. The Macc-Ii Provides A Critical In-Place Contractual Mechanism Through A Regionalized Multiple Award, Indefinite Delivery, Indefinite Quantity (Idiq) Contract To Support General Construction, Alteration, Modification, Maintenance And Repair, Demolition, Design-Build, And New Construction Of Buildings, Facilities, And Real Property At John C. Stennis Space Center (Ssc), Johnson Space Center (Jsc) Including White Sands Test Facility (Wstf), Kennedy Space Center (Ksc), And Marshall Space Flight Center (Msfc) Including Michoud Assembly Facility (Maf). Macc-Ii Will Also Support Emergency Response To Natural Disasters And Emergencies. Other Nasa Centers And Federal Tenants At Nasa Facilities May Utilize Macc-Ii With Ssc Procurement Officer Approval. The Macc-Ii Is Not A Requirements Contract And Therefore Not Mandatory. The Macc-Ii Is Intended To Provide A Highly Flexible Construction Contracting Vehicle For Participating Centers. This Solicitation Includes 4 Seed Projects, One For Each Of The 4 Centers. Details Are Found In The Initial (Model) Task Orders Listed In Section J Of This Solicitation And Referenced In Section B Schedule: The Contractor Shall Provide All Labor, Tools, Equipment And Materials To Perform Each Task As Defined In The Specifications And Drawings Identified For The Specific Initial (Model) Task Order. See Section J. And Reference Bid Item 0002-0005.
30 Aug 2023
Nasa Stennis Space Center
National Aeronautics And Space Administration (Nasa)
$0.00
80KSC018F0021
Revitalize Kennedy Space Center's Water&Waster Water Systems, Phase 5 Mod 1: The Purpose Of This Modification Is To Establish The Contract Completion Date And Incorporate The Site Specific Safety&Health Plan. As A Result Of This Modification: A. The Site Specific Safety&Health Plan Approved December 14, 2017 Is Incorporated As Attachment 1 Of This Modification. B. The Contract Completion Date Is Established At May 17, 2019 Iaw The Notice To Proceed Issued On May 16, 2018. C. Change In Contract Price: $0
17 May 2018
Nasa Kennedy Space Center
National Aeronautics And Space Administration (Nasa)
$3,735,105.06
80KSC018F0021
Revitalize Kennedy Space Center's Water And Waste Water Systems, Phase 6 Mod 4: A. The Purpose Of This Modification Is To Incorporate Tn-03 Provide 15Kv Cable (Attachment 1), In The Amount Of $102,646. B. As A Result Of This Modification, The Total Contract Value Will Increase From $3,473,919.06 To $3,576,565.06; An Increase Of $102,646. C. The Contract Completion Date Remains June 16, 2019. D. Change Block 22 Of The Sf 1442 To Read $3,576,565.06 In Lieu Of $3,473,919.06; An Increase Of $102,646. E. Statement Of Release: In Consideration Of The Modification Agreed To Herein As Complete Equitable Adjustment For The Negotiated Tn-03 Change, The Contractor Hereby Releases The Government From Any And All Liability For Further Equitable Adjustments Attributable To Such Facts Or Circumstances Giving Rise To This Change.
5 Mar 2019
Nasa Kennedy Space Center
National Aeronautics And Space Administration (Nasa)
$3,735,105.06
80KSC018F0021
Revitalize Kennedy Space Center's Water And Waste Water Systems, Phase 6. Modification Corrects Administrative Error To Modification P00006. Tn-02A Dated 3/13/2019 Within Modification P00006 Is Hereby Replaced With Tn-02A Rev 2 Dated 4/19/2019.
2 Sep 2020
Nasa Kennedy Space Center
National Aeronautics And Space Administration (Nasa)
$3,735,105.06
80KSC018F0021
Revitalize Kennedy Space Center's Water And Waste Water Systems, Phase 6 Mod 17: Extends Period Of Performance By 80 Calendar Days.
15 Dec 2020
Nasa Kennedy Space Center
National Aeronautics And Space Administration (Nasa)
$3,735,105.06
80KSC018F0021
Revitalize Kennedy Space Center's Water And Waste Water Systems, Phase 6 Mod 27: Incorporates Tracking Number (Tn)-13, Communications Pull Box Replacement. As A Result, Total Contract Value Will Increase And Completion Date Is Extended.
31 Mar 2022
Nasa Kennedy Space Center
National Aeronautics And Space Administration (Nasa)
$3,735,105.06
80JSC018F0018
Repair Sanitary Sewer System At Jsc
11 Dec 2019
Nasa Johnson Space Center
National Aeronautics And Space Administration (Nasa)
$6,735,334.54
80JSC018F0018
Repair Sanitary Sewer System At Jsc
9 Apr 2020
Nasa Johnson Space Center
National Aeronautics And Space Administration (Nasa)
$6,735,334.54
80KSC018F0021
Revitalize Kennedy Space Center's Water And Waste Water Systems, Phase 5. No Cost Modification To Extend The Contract Completion Date 7 Days To February 27, 2020.
20 Feb 2020
Nasa Kennedy Space Center
National Aeronautics And Space Administration (Nasa)
$3,735,105.06
80KSC018F0021
Revitalize Kennedy Space Center's Water And Waste Water Systems, Phase 6 Mod 24: Extends The Contract Completion Date By 7 Days In Order To Allow For The Evaluation And Negotiation Of Tracking Number (Tn)-13.
4 Mar 2022
Nasa Kennedy Space Center
National Aeronautics And Space Administration (Nasa)
$3,735,105.06
80JSC018F0018
Repair Sanitary Sewer System At Jsc
8 May 2020
Nasa Johnson Space Center
National Aeronautics And Space Administration (Nasa)
$6,735,334.54
80KSC018F0021
Revitalize Kennedy Space Center's Water And Waste Water Systems, Phase 6 Mod 2: A. The Purpose Of This Modification Is To Add Tn-001/Raise W1 Pump Station Finished Floor Elevation And Site Elevation (Attachment 1), In The Amount Of $230,314. B. As A Result Of This Modification, The Total Contract Value Will Increase From $3,220,145.06 To $3,450,459.06; An Increase Of $230,314. C. The Contract Completion Date Is Hereby Extended 30 Calendar Days From May 17, 2019 To June 16, 2019. D. Change Block 22 Of The Sf 1442 To Read $3,450,459.06 In Lieu Of $3,220,145.06; An Increase Of $230,314. E. Statement Of Release: In Consideration Of The Modification Agreed To Herein As Complete Equitable Adjustment For This Negotiated Tn-001 Changes, The Contractor Hereby Releases The Government From Any And All Liability For Further Equitable Adjustments Attributable To Such Facts Or Circumstances Giving Rise To This Change.
31 Aug 2018
Nasa Kennedy Space Center
National Aeronautics And Space Administration (Nasa)
$3,735,105.06
80KSC018F0021
Revitalize Kennedy Space Center's Water And Waste Water Systems, Phase 6 - The Purpose Of The Modification Is To Extend The Contract Completion Date By 140 Days At No Additional Cost To The Government. As A Result Of This Modification The Contract Completion Date Of October 4, 2019 Is Hereby Extended To February 20, 2020. In Consideration Of The Modification Agreed To Herein The Contractor Hereby Releases The Government From Any And All Liability For Further Equitable Adjustments Attributable To Such Facts Or Circumstances Giving Rise To This Time Extension.
3 Oct 2019
Nasa Kennedy Space Center
National Aeronautics And Space Administration (Nasa)
$3,735,105.06
80KSC018F0021
Revitalize Kennedy Space Center's Water And Waste Water Systems, Phase 6 Mod 12: This Modification Extends The Contract Completion Date To 8/5/2020.
5 Mar 2020
Nasa Kennedy Space Center
National Aeronautics And Space Administration (Nasa)
$3,735,105.06
80KSC018F0021
Revitalize Kennedy Space Center's Water And Waste Water Systems, Phase 6 Mod 19: Incorporates Tracking Number (Tn)-09, Bollards For Fuel Tank And Fuel Lines. All Other Terns And Conditions Remain Unchanged.
16 Apr 2021
Nasa Kennedy Space Center
National Aeronautics And Space Administration (Nasa)
$3,735,105.06
80KSC018F0021
Revitalize Kennedy Space Center's Water And Waste Water Systems, Phase 6 Mod 20: Incorporates Tracking Number(Tn)-11, Extension Of Pressure Transducer Conduit/Wiring. Funding And Contract Value Will Be Increased. Completion Date Remains June 22, 2021
19 May 2021
Nasa Kennedy Space Center
National Aeronautics And Space Administration (Nasa)
$3,735,105.06
80JSC018F0018
Repair Sanitary Sewer System At Jsc
4 Feb 2020
Nasa Johnson Space Center
National Aeronautics And Space Administration (Nasa)
$6,735,334.54
80JSC018F0018
Repair Sanitary Sewer System At Jsc
2 Dec 2020
Nasa Johnson Space Center
National Aeronautics And Space Administration (Nasa)
$6,735,334.54