Eclipse Companies, Llc
CAGE Code: 7UMN9
NCAGE Code: 7UMN9
Status: Active
Type: Commercial Supplier
Summary
Eclipse Companies, Llc is an Active Commercial Supplier with the Cage Code 7UMN9.
Address
11554 E Washington St
Chagrin Falls OH 44023-9213
United States
Points of Contact
No Points of Contact...
Related Information
No Related Information...
People who viewed this 'CAGE Code' also viewed...
Riseon Llc Axiom Systems Inc K2 Technologies Logisco. On Demand Care Corp Xact Spec Industries Llc Paglio And Associates Stock Equipment Company Inc Integrated Development And Mfg Co North Coast Thermal Equipment Co Inc Lewis Unlimited Inc Material Handling Crane Systems Inc Conteplast Of America Inc Integrated Development & Talsys Technologies Inc Abanaki Corporation Esvv Llc R C First Enterprises Inc Ag Group Inc High Temperature Systems, Inc.
Frequently Asked Questions (FAQ) for CAGE 7UMN9
- What is CAGE Code 7UMN9?
- 7UMN9 is the unique identifier used by NATO Organizations to reference the physical entity known as Eclipse Companies, Llc located at 11554 E Washington St, Chagrin Falls OH 44023-9213, United States.
- Who is CAGE Code 7UMN9?
- 7UMN9 refers to Eclipse Companies, Llc located at 11554 E Washington St, Chagrin Falls OH 44023-9213, United States.
- Where is CAGE Code 7UMN9 Located?
- CAGE Code 7UMN9 is located in Chagrin Falls, OH, USA.
Contracting History for CAGE 7UMN9 Most Recent 25 Records
- 693C7324F00021N
- Project Me Np Acad Brg(1): The Project Consists Of Bridge Rehabilitation And Repair Of Wildwood Entrance And Jordan Pond-Seal Harbor Bridges. The Work Includes Cutting Weep Hole Openings Into Abutments; Cleaning And Sealing Bridge Joints; Erosion Re
- 19 Dec 2023
- Project Me Np Acad Brg(1): The Project Consists Of Bridge Rehabilitation And Repair Of Wildwood Entrance And Jordan Pond-Seal Harbor Bridges. The Work Includes Cutting Weep Hole Openings Into Abutments; Cleaning And Sealing Bridge Joints; Erosion Re
- 693C73 Eastern Fed Lands Division
- Department Of Transportation (Dot)
- $1,133,642.05
- Department Of Transportation (Dot)
- 693C7324F00004N
- Project Nc Np Blri 2F12: The Project Consists Of Roadway Reconstruction And Drainage Repairs At Mp 276.35. The Work Includes Bridge Work; Guard Wall Construction; Lower Retaining Wall Work; Drainage Structure Replacements; And Other Miscellaneous Wo
- 15 Nov 2023
- Project Nc Np Blri 2F12: The Project Consists Of Roadway Reconstruction And Drainage Repairs At Mp 276.35. The Work Includes Bridge Work; Guard Wall Construction; Lower Retaining Wall Work; Drainage Structure Replacements; And Other Miscellaneous Wo
- 693C73 Eastern Fed Lands Division
- Department Of Transportation (Dot)
- $1,415,318.00
- Department Of Transportation (Dot)
- 693C7323F00043N
- Project Tx Ftfw Sama 10(1)_2: The Project Consists Of The Rehabilitation And Realignment Of The Entrance Road Within The San Marcos Aquatic Resources Center.
- 20 Mar 2023
- Project Tx Ftfw Sama 10(1)_2: The Project Consists Of The Rehabilitation And Realignment Of The Entrance Road Within The San Marcos Aquatic Resources Center.
- 693C73 Eastern Fed Lands Division
- Department Of Transportation (Dot)
- $2,250,765.84
- Department Of Transportation (Dot)
- 693C7323F00043N
- Tx Ftfw Sama 10(1)_2 693C7220d000023/693C7323f00043n Cm #1 No Change To Contract Amount No Change To Contract Time Extend Period Of Performance To November 30, 2025
- 13 Oct 2023
- Tx Ftfw Sama 10(1)_2 693C7220d000023/693C7323f00043n Cm #1 No Change To Contract Amount No Change To Contract Time Extend Period Of Performance To November 30, 2025
- 693C73 Eastern Fed Lands Division
- Department Of Transportation (Dot)
- $2,250,765.84
- Department Of Transportation (Dot)
- 693C7323F00043N
- Tx Ftfw Sama 10(1)_2 693C7220d000023/693C7323f00043n Cm #2 Increase Contract Amount By $10,863.32 Extend Contract Time By 60 Calendar Days
- 20 Dec 2023
- Tx Ftfw Sama 10(1)_2 693C7220d000023/693C7323f00043n Cm #2 Increase Contract Amount By $10,863.32 Extend Contract Time By 60 Calendar Days
- 693C73 Eastern Fed Lands Division
- Department Of Transportation (Dot)
- $2,261,629.16
- Department Of Transportation (Dot)
- 693C7323F00012N
- Np-Chat 102(1), 906(1), 907(1), 908(1) 693C7320d000016/693C7323f00012n Cm #1 No Change To Contract Amount No Change To Contract Time Extend Period Of Performance To July 31, 2025
- 12 Jun 2023
- Np-Chat 102(1), 906(1), 907(1), 908(1) 693C7320d000016/693C7323f00012n Cm #1 No Change To Contract Amount No Change To Contract Time Extend Period Of Performance To July 31, 2025
- 693C73 Eastern Fed Lands Division
- Department Of Transportation (Dot)
- $2,818,953.95
- Department Of Transportation (Dot)
- 693C7323F00012N
- Project Np-Chat 102(1), 906(1), 907(1), 908(1): The Project Consists Of Rehabilitation/Reconstruction Of The Roadway And Parking Areas, Milling And Asphalt Overlay, Installation Of New Signs, Pavement Marking, Development And Implementation Of A Tra
- 23 Feb 2023
- Project Np-Chat 102(1), 906(1), 907(1), 908(1): The Project Consists Of Rehabilitation/Reconstruction Of The Roadway And Parking Areas, Milling And Asphalt Overlay, Installation Of New Signs, Pavement Marking, Development And Implementation Of A Tra
- 693C73 Eastern Fed Lands Division
- Department Of Transportation (Dot)
- $2,818,953.95
- Department Of Transportation (Dot)
- 693C7323F00031N
- Fw-Grco Trl(1) 693C7320d000007/693C7323f00031n Cm #1 No Change To Contract Amount No Change To Contract Time Extend Period Of Performance To December 31, 2025
- 3 Jan 2024
- Fw-Grco Trl(1) 693C7320d000007/693C7323f00031n Cm #1 No Change To Contract Amount No Change To Contract Time Extend Period Of Performance To December 31, 2025
- 693C73 Eastern Fed Lands Division
- Department Of Transportation (Dot)
- $1,753,170.00
- Department Of Transportation (Dot)
- 693C7323F00031N
- Project Fw-Grco Trl(1): The Project Consists Of Replacing The Damaged Boardwalk On Headquarters Boardwalk Trail. The Work Includes Design Services, Timber Pile And Timber Boardwalk Construction, And Other Miscellaneous Work.
- 3 Mar 2023
- Project Fw-Grco Trl(1): The Project Consists Of Replacing The Damaged Boardwalk On Headquarters Boardwalk Trail. The Work Includes Design Services, Timber Pile And Timber Boardwalk Construction, And Other Miscellaneous Work.
- 693C73 Eastern Fed Lands Division
- Department Of Transportation (Dot)
- $1,753,170.00
- Department Of Transportation (Dot)
- 693C7323F00026N
- This Project Consists Of Repairing Slope Failures At Milepost 106.6 And Milepost 109.7 The Work Includes Design Services, Excavation, Embankment Construction, And Other Miscellaneous Work.
- 3 Feb 2023
- This Project Consists Of Repairing Slope Failures At Milepost 106.6 And Milepost 109.7 The Work Includes Design Services, Excavation, Embankment Construction, And Other Miscellaneous Work.
- 693C73 Eastern Fed Lands Division
- Department Of Transportation (Dot)
- $2,513,125.00
- Department Of Transportation (Dot)
- 693C7323F00026N
- Np-Natr 3O22 693C7320d000007/693C7323f00026n Cm #2 Increase Contract Amount By $985,000.00 Extend Contract Time By 30 Calendar Days
- 8 Sep 2023
- Np-Natr 3O22 693C7320d000007/693C7323f00026n Cm #2 Increase Contract Amount By $985,000.00 Extend Contract Time By 30 Calendar Days
- 693C73 Eastern Fed Lands Division
- Department Of Transportation (Dot)
- $2,513,125.00
- Department Of Transportation (Dot)
- 693C7323F00026N
- Np-Natr 3O22 693C7320d000007/693C7323f00026n Cm #1 No Change To Contract Amount No Change To Contract Time Change Lines Of Accounting
- 29 Aug 2023
- Np-Natr 3O22 693C7320d000007/693C7323f00026n Cm #1 No Change To Contract Amount No Change To Contract Time Change Lines Of Accounting
- 693C73 Eastern Fed Lands Division
- Department Of Transportation (Dot)
- $2,513,125.00
- Department Of Transportation (Dot)
- 693C7323F00026N
- Np-Natr 3O22 693C7320d000007/693C7323f00026n Cm #3 No Change To Contract Amount No Change To Contract Time Extend Period Of Performance To December 31, 2024
- 1 Nov 2023
- Np-Natr 3O22 693C7320d000007/693C7323f00026n Cm #3 No Change To Contract Amount No Change To Contract Time Extend Period Of Performance To December 31, 2024
- 693C73 Eastern Fed Lands Division
- Department Of Transportation (Dot)
- $2,513,125.00
- Department Of Transportation (Dot)
- 693C7322F00067N
- In Np Indu 0945(2) Cm #1 Increase Contract Amount By $62,159.90 Extend Contract Time By 70 Calendar Days
- 23 Aug 2022
- In Np Indu 0945(2) Cm #1 Increase Contract Amount By $62,159.90 Extend Contract Time By 70 Calendar Days
- 693C73 Eastern Fed Lands Division
- Department Of Transportation (Dot)
- $401,039.90
- Department Of Transportation (Dot)
- 693C7322F00067N
- In Np Indu 0945(2) 693C7320d000023/693C7322f00067n Cm #2 Decrease Contract Amount By $2,300.50 No Change To Contract Time Finalize Existing Quantities
- 14 Feb 2023
- In Np Indu 0945(2) 693C7320d000023/693C7322f00067n Cm #2 Decrease Contract Amount By $2,300.50 No Change To Contract Time Finalize Existing Quantities
- 693C73 Eastern Fed Lands Division
- Department Of Transportation (Dot)
- $398,739.40
- Department Of Transportation (Dot)
- 693C7322F00067N
- Project In Np Indu 0945(2): The Project Consists Of Bridge Superstructure Removal, Temporary Traffic Control, And Other Miscellaneous Work.
- 25 May 2022
- Project In Np Indu 0945(2): The Project Consists Of Bridge Superstructure Removal, Temporary Traffic Control, And Other Miscellaneous Work.
- 693C73 Eastern Fed Lands Division
- Department Of Transportation (Dot)
- $338,880.00
- Department Of Transportation (Dot)
- 693C7321F000099
- Project Fw-Bioa 12(1): The Purpose Of This Administrative Modification Is To: 1. Reduce Task Order Line Item Number (Clin) 00103 - Schedule A From $434,176.82 By $52,005.48 To $382,171.34. 2. Increase Task Order Line Item Number (Clin) 00101 -
- 13 Sep 2023
- Project Fw-Bioa 12(1): The Purpose Of This Administrative Modification Is To: 1. Reduce Task Order Line Item Number (Clin) 00103 - Schedule A From $434,176.82 By $52,005.48 To $382,171.34. 2. Increase Task Order Line Item Number (Clin) 00101 -
- 693C73 Eastern Fed Lands Division
- Department Of Transportation (Dot)
- $1,527,506.09
- Department Of Transportation (Dot)
- 693C7321F000099
- Fw-Bioa 12(1) Cm# 2 Increase Contract Amount By $133,329.27 No Increase To Contract Time
- 22 Aug 2022
- Fw-Bioa 12(1) Cm# 2 Increase Contract Amount By $133,329.27 No Increase To Contract Time
- 693C73 Eastern Fed Lands Division
- Department Of Transportation (Dot)
- $1,527,506.09
- Department Of Transportation (Dot)
- 693C7321F000099
- Fw-Bioa 12(1) 693C7320d000023/693C7321f000099 Cm #3 No Change To Contract Amount No Change To Contract Time Extend Period Of Performance To April 30, 2024
- 6 Mar 2023
- Fw-Bioa 12(1) 693C7320d000023/693C7321f000099 Cm #3 No Change To Contract Amount No Change To Contract Time Extend Period Of Performance To April 30, 2024
- 693C73 Eastern Fed Lands Division
- Department Of Transportation (Dot)
- $1,527,506.09
- Department Of Transportation (Dot)
- 693C7321F000099
- Fw Bioa 12(1) Cm #1 No Change To Contract Amount No Change To Contract Time Extended Period Of Performance To April 30, 2023
- 15 Mar 2022
- Fw Bioa 12(1) Cm #1 No Change To Contract Amount No Change To Contract Time Extended Period Of Performance To April 30, 2023
- 693C73 Eastern Fed Lands Division
- Department Of Transportation (Dot)
- $1,394,176.82
- Department Of Transportation (Dot)
- 693C7321F000099
- Project Fw Bioa 12(1) The Project Consists Of Reconstruction Of The Falling Timber Bridge On Shape Charge Road (Fw Route 012). The Work Includes Replacement Of Falling Timber Bridge, Reconstruction Of Approaches, Aggregate Resurfacing, Removal Of S
- 26 Aug 2021
- Project Fw Bioa 12(1) The Project Consists Of Reconstruction Of The Falling Timber Bridge On Shape Charge Road (Fw Route 012). The Work Includes Replacement Of Falling Timber Bridge, Reconstruction Of Approaches, Aggregate Resurfacing, Removal Of S
- 693C73 Eastern Fed Lands Division
- Department Of Transportation (Dot)
- $1,394,176.82
- Department Of Transportation (Dot)
- 693C7320D000023
- Mid-West Regional Construction Idiq Matoc: The Purpose Of This Modification Is To: 1. In Accordance With Far Clause 52.217-9, Entitled "Option To Extend The Term Of The Contract," Cited Contract Is Hereby Modified To Exercise The Opt
- 8 Sep 2022
- Mid-West Regional Construction Idiq Matoc: The Purpose Of This Modification Is To: 1. In Accordance With Far Clause 52.217-9, Entitled "Option To Extend The Term Of The Contract," Cited Contract Is Hereby Modified To Exercise The Opt
- 693C73 Eastern Fed Lands Division
- Department Of Transportation (Dot)
- $0.00
- Department Of Transportation (Dot)
- 693C7320D000023
- Mid-West Regional Construction Idiq Matoc: The Purpose Of This Modification Is To: 1. Incorporate Far Clause 52.204-27 - Prohibition On A Bytedance Covered Application (Jun 2023) Via Full Text Into This Idiq Contract. 2. All Other Terms And Cond
- 21 Jun 2023
- Mid-West Regional Construction Idiq Matoc: The Purpose Of This Modification Is To: 1. Incorporate Far Clause 52.204-27 - Prohibition On A Bytedance Covered Application (Jun 2023) Via Full Text Into This Idiq Contract. 2. All Other Terms And Cond
- 693C73 Eastern Fed Lands Division
- Department Of Transportation (Dot)
- $0.00
- Department Of Transportation (Dot)
- 693C7320F000077
- Mo Erfo Fs 2017-1(1) Cm #7 No Change To Contract Amount No Change To Contract Time Extend Period Of Performance To November 30, 2024
- 11 Oct 2023
- Mo Erfo Fs 2017-1(1) Cm #7 No Change To Contract Amount No Change To Contract Time Extend Period Of Performance To November 30, 2024
- 693C73 Eastern Fed Lands Division
- Department Of Transportation (Dot)
- $1,127,340.74
- Department Of Transportation (Dot)
- 693C7320F000077
- Mo Erfo Fs 2017-1(1) Cm #6 No Change To Contract Amount No Change To Contract Time Extend Period Of Performance To November 30, 2023
- 6 Feb 2023
- Mo Erfo Fs 2017-1(1) Cm #6 No Change To Contract Amount No Change To Contract Time Extend Period Of Performance To November 30, 2023
- 693C73 Eastern Fed Lands Division
- Department Of Transportation (Dot)
- $1,127,340.74
- Department Of Transportation (Dot)