Nehemiah Construction Llc

CAGE Code: 7T3X5

NCAGE Code: 7T3X5

Status: Active

Type: Commercial Supplier

Summary

Nehemiah Construction Llc is an Active Commercial Supplier with the Cage Code 7T3X5.

Address

3186 Booten Creek Rd
Barboursville WV 25504-9441
United States

Points of Contact

Telephone:
3049624688
Fax:
3047330433

Related Information

No Related Information...

Associated CAGE Codes People who viewed this 'CAGE Code' also viewed...

CAGE Code FAQ Frequently Asked Questions (FAQ) for CAGE 7T3X5

What is CAGE Code 7T3X5?
7T3X5 is the unique identifier used by NATO Organizations to reference the physical entity known as Nehemiah Construction Llc located at 3186 Booten Creek Rd, Barboursville WV 25504-9441, United States.
Who is CAGE Code 7T3X5?
7T3X5 refers to Nehemiah Construction Llc located at 3186 Booten Creek Rd, Barboursville WV 25504-9441, United States.
Where is CAGE Code 7T3X5 Located?
CAGE Code 7T3X5 is located in Barboursville, WV, USA.

Contracting History for CAGE 7T3X5 Contracting History for CAGE 7T3X5 Most Recent 25 Records

140P5322C0019
Blue Ridge Parkway Picnic Table Installation North Carolina
7 Sep 2022
Ser North Mabo (53000)
Department Of The Interior (Doi)
$349,800.00
1240LS22C0005
Gaoa-Uwc-Silver Lake Boardwalk Replacement Mod 2: The Purpose Of This Bilateral Modification Is To: 1-Correct The Size Of Deck Screws From 2 1/2" To 3" 2-Add Curb And Flatwork Where The Wood Deck Was Removed By The Parking Lot (Was No
18 Oct 2022
Usda-Fs, Csa Intermountain 7
Department Of Agriculture (Usda)
$2,863,582.60
1240LS22C0005
Gaoa-Uwc-Silver Lake Boardwalk Replacement Mod 7: The Purpose Of This Bilateral Modification Is To: 1- Add Additional Costs Associated With Helical Pier Extensions For Unanticipated Depths In Order To Arrive At The Required Torque Specifications
7 Dec 2023
Usda-Fs, Csa Intermountain 7
Department Of Agriculture (Usda)
$2,951,449.43
1240LS22C0005
Gaoa-Uwc-Silver Lake Boardwalk Replacement Mod 3: The Purpose Of This Bilateral Modification Is To Extend The Period Of Performance To 9/30/2023, Due To Winter Shutdown. No Other Changes Are Being Made At This Time. Mod 2: The Purpose Of T
22 Nov 2022
Usda-Fs, Csa Intermountain 7
Department Of Agriculture (Usda)
$2,863,582.60
1240LS22C0005
Gaoa-Uwc-Silver Lake Boardwalk Replacement Replacement Of Existing Boardwalk And Fishing Piers (Base And All Options).
21 Jun 2022
Usda-Fs, Csa Intermountain 7
Department Of Agriculture (Usda)
$2,863,582.60
1240LS22C0005
Gaoa-Uwc-Silver Lake Boardwalk Replacement Mod 4: The Purpose Of This Bilateral Modification Is For Coffer Dam, Dewatering, Excavation, And Installation Of Concrete Piers On North Side Of Bridge Where Helical Piers Cannot Be Used Due To Subsurfac
9 Jun 2023
Usda-Fs, Csa Intermountain 7
Department Of Agriculture (Usda)
$2,863,582.60
1240LS22C0005
Gaoa-Uwc-Silver Lake Boardwalk Replacement Mod 5: The Purpose Of This Bilateral Modification Is To Change Bench Supports To Weathering Steel Supports In Lieu Of Wood Supports On Plans, 40 Supports Total For 20 Benches. No Other Changes Are Bei
6 Aug 2023
Usda-Fs, Csa Intermountain 7
Department Of Agriculture (Usda)
$2,863,582.60
1240LS22C0005
Gaoa-Uwc-Silver Lake Boardwalk Replacement Mod 6: The Purpose Of This Bilateral Modification Is To: 1-Add Additional Costs Associated With Boulders Encountered Just Below The Surface Which Necessitated The Use Of Hand-Mixed Concrete Footings On
14 Sep 2023
Usda-Fs, Csa Intermountain 7
Department Of Agriculture (Usda)
$2,863,582.60
140P5422C0004
Construction, Install Ramps At Two Historic Structures At Cumberland Island National Seashore
18 Feb 2022
Ser South Mabo (54000)
Department Of The Interior (Doi)
$64,890.00
140P5322C0005
Blri Replace And Repair Wood Fencing
7 Jan 2022
Ser North Mabo (53000)
Department Of The Interior (Doi)
$194,850.00
140P6421C0014
Epref Construction, Foundation Repair
20 Jul 2021
Mwr Ohio(64000)
Department Of The Interior (Doi)
$72,800.40
140P6421C0007
Epref Construction, Boardwalk Replacement
16 Jun 2021
Mwr Ohio(64000)
Department Of The Interior (Doi)
$465,860.00
140P6420C0021
Epref Construction, Perimeter Fencing At The James A Garfield National Historic Site
4 Sep 2020
Mwr Ohio(64000)
Department Of The Interior (Doi)
$171,651.65
140P6420C0021
Epref Construction, Perimeter Fencing At The James A Garfield National Historic Site. The Purpose Of This Modification Is To De-Obligate Excess Funding.
14 Jun 2021
Mwr Ohio(64000)
Department Of The Interior (Doi)
$171,651.65
12343419D0009
Option.Big Hat-Road Decommissioning Idiq
15 Sep 2021
Usda-Fs, Csa East 5
Department Of Agriculture (Usda)
$0.00
12343419D0009
Option.Big Hat-Road Decommissioning Idiq
28 Aug 2023
Usda-Fs, Csa East 5
Department Of Agriculture (Usda)
$0.00
12343419D0009
Option.Big Hat-Road Decommissioning Idiq
6 Sep 2022
Usda-Fs, Csa East 5
Department Of Agriculture (Usda)
$0.00
12343420F0056
Road Decommissioning Idiq Contract, Cor L.Hayes
2 Sep 2020
Monongahela National Forest
Department Of Agriculture (Usda)
$2,500.00