Leisnoi Diversified Services, Llc
CAGE Code: 7S4V8
NCAGE Code: 7S4V8
Status: Active
Type: Commercial Supplier
Summary
Leisnoi Diversified Services, Llc is an Active Commercial Supplier with the Cage Code 7S4V8.
Address
62409 Hillside Rd
Saint Ignatius MT 59865-9116
United States
Points of Contact
No Points of Contact...
Related Information
No Related Information...
People who viewed this 'CAGE Code' also viewed...
Montana Keepers Hamels Exxon Service Catherine C Mason Hunt's Timbers Inc Grass, Llc Experimental Warplanes Llc Cahoon, Carol Schock Emily Foothill Post & Lumber Llc Klp Inc Schliep, Larry J.C. Bussing, Inc Montana Natural Beef Llc Snow Eagle Consulting, Llc Urethane Systems Of Montana Kuefler Lightning Protection Inc S & K Technologies, Inc. Mission Lumber And Hardware Inc Sturman, David Able Septic
Frequently Asked Questions (FAQ) for CAGE 7S4V8
- What is CAGE Code 7S4V8?
- 7S4V8 is the unique identifier used by NATO Organizations to reference the physical entity known as Leisnoi Diversified Services, Llc located at 62409 Hillside Rd, Saint Ignatius MT 59865-9116, United States.
- Who is CAGE Code 7S4V8?
- 7S4V8 refers to Leisnoi Diversified Services, Llc located at 62409 Hillside Rd, Saint Ignatius MT 59865-9116, United States.
- Where is CAGE Code 7S4V8 Located?
- CAGE Code 7S4V8 is located in Saint Ignatius, MT, USA.
Contracting History for CAGE 7S4V8 Most Recent 25 Records
- 33330223FF0010551
- This Is Task Order No. 33330223Ff0010551, W.O. No. 06, Against Idiq No. 33330222Df0010060, To Renovate Building 1 Bio-Repository - Replace Lab Epoxy Floor.
- 25 Sep 2023
- This Is Task Order No. 33330223Ff0010551, W.O. No. 06, Against Idiq No. 33330222Df0010060, To Renovate Building 1 Bio-Repository - Replace Lab Epoxy Floor.
- Smithsonian Institution
- Smithsonian Institution (Si)
- $113,055.00
- Smithsonian Institution (Si)
- 15F06722P0000943
- Hq 6A Condensing Re-Pipe Project
- 8 Sep 2022
- Hq 6A Condensing Re-Pipe Project
- Division 1200
- Department Of Justice (Doj)
- $568,205.90
- Department Of Justice (Doj)
- 15F06722P0000943
- 6A Condensing Re-Pipe
- 20 Sep 2023
- 6A Condensing Re-Pipe
- Division 1200
- Department Of Justice (Doj)
- $568,205.87
- Department Of Justice (Doj)
- 33330222FF0010476
- Nasm-Uhc Construct Utilities For Hazmat Storage.
- 17 Aug 2023
- Nasm-Uhc Construct Utilities For Hazmat Storage.
- Smithsonian Institution
- Smithsonian Institution (Si)
- $937,738.00
- Smithsonian Institution (Si)
- 33330222FF0010476
- Nasm-Uhc Construct Utilities For Hazmat Storage.
- 20 Oct 2023
- Nasm-Uhc Construct Utilities For Hazmat Storage.
- Smithsonian Institution
- Smithsonian Institution (Si)
- $948,975.00
- Smithsonian Institution (Si)
- 33330222FF0010476
- Nasm-Uhc Construct Utilities For Hazmat Storage.
- 31 Jul 2023
- Nasm-Uhc Construct Utilities For Hazmat Storage.
- Smithsonian Institution
- Smithsonian Institution (Si)
- $920,891.00
- Smithsonian Institution (Si)
- 33330222FF0010476
- Nasm-Uhc Construct Utilities For Hazmat Storage.
- 22 Sep 2022
- Nasm-Uhc Construct Utilities For Hazmat Storage.
- Smithsonian Institution
- Smithsonian Institution (Si)
- $727,423.00
- Smithsonian Institution (Si)
- 33330222FF0010476
- Nasm-Uhc Construct Utilities For Hazmat Storage.
- 23 Jul 2023
- Nasm-Uhc Construct Utilities For Hazmat Storage.
- Smithsonian Institution
- Smithsonian Institution (Si)
- $909,316.00
- Smithsonian Institution (Si)
- 68HE0421C0002
- Mississippi Phosphate Phase 1C In Pascagoula, Ms. This Phase Will Include The Earthwork Necessary To Complete The Remaining Slope Area, Install Geotextile Turf Product, Water Return Ditch And Pond 5 Areas. Modification 10 Is To Shift Existing Funding
- 21 Aug 2023
- Mississippi Phosphate Phase 1C In Pascagoula, Ms. This Phase Will Include The Earthwork Necessary To Complete The Remaining Slope Area, Install Geotextile Turf Product, Water Return Ditch And Pond 5 Areas. Modification 10 Is To Shift Existing Funding
- Region 4 Contracting Office
- Environmental Protection Agency (Epa)
- $29,613,135.32
- Environmental Protection Agency (Epa)
- 68HE0421C0002
- Mississippi Phosphate Phase 1C In Pascagoula, Ms. This Phase Will Include The Earthwork Necessary To Complete The Remaining Slope Area, Install Geotextile Turf Product, Water Return Ditch And Pond 5 Areas. Modification 8 Is An Administrative Modifica
- 20 Jun 2023
- Mississippi Phosphate Phase 1C In Pascagoula, Ms. This Phase Will Include The Earthwork Necessary To Complete The Remaining Slope Area, Install Geotextile Turf Product, Water Return Ditch And Pond 5 Areas. Modification 8 Is An Administrative Modifica
- Region 4 Contracting Office
- Environmental Protection Agency (Epa)
- $29,109,721.82
- Environmental Protection Agency (Epa)
- 68HE0421C0002
- Eo14042 Mississippi Phosphate Phase 1C In Pascagoula, Ms. This Phase Will Include The Earthwork Necessary To Complete The Remaining Slope Area, Install Geotextile Turf Product,Water Return Ditch And Pond 5 Areas.
- 22 Oct 2021
- Eo14042 Mississippi Phosphate Phase 1C In Pascagoula, Ms. This Phase Will Include The Earthwork Necessary To Complete The Remaining Slope Area, Install Geotextile Turf Product,Water Return Ditch And Pond 5 Areas.
- Region 4 Contracting Office
- Environmental Protection Agency (Epa)
- $10,035,315.93
- Environmental Protection Agency (Epa)
- 68HE0421C0002
- Mississippi Phosphate Phase 1C In Pascagoula, Ms. This Phase Will Include The Earthwork Necessary To Complete The Remaining Slope Area, Install Geotextile Turf Product, Water Return Ditch And Pond 5 Areas. Modification 9 Is A Change Order Modificatio
- 31 Jul 2023
- Mississippi Phosphate Phase 1C In Pascagoula, Ms. This Phase Will Include The Earthwork Necessary To Complete The Remaining Slope Area, Install Geotextile Turf Product, Water Return Ditch And Pond 5 Areas. Modification 9 Is A Change Order Modificatio
- Region 4 Contracting Office
- Environmental Protection Agency (Epa)
- $29,613,135.32
- Environmental Protection Agency (Epa)
- 68HE0421C0002
- Mississippi Phosphate Phase 1C In Pascagoula, Ms. This Phase Will Include The Earthwork Necessary To Complete The Remaining Slope Area, Install Geotextile Turf Product,Water Return Ditch And Pond 5 Areas.
- 29 Sep 2021
- Mississippi Phosphate Phase 1C In Pascagoula, Ms. This Phase Will Include The Earthwork Necessary To Complete The Remaining Slope Area, Install Geotextile Turf Product,Water Return Ditch And Pond 5 Areas.
- Region 4 Contracting Office
- Environmental Protection Agency (Epa)
- $10,035,315.93
- Environmental Protection Agency (Epa)
- 68HE0421C0002
- Mississippi Phosphate Phase 1C In Pascagoula, Ms. This Phase Will Include The Earthwork Necessary To Complete The Remaining Slope Area, Install Geotextile Turf Product, Water Return Ditch And Pond 5 Areas.
- 31 May 2022
- Mississippi Phosphate Phase 1C In Pascagoula, Ms. This Phase Will Include The Earthwork Necessary To Complete The Remaining Slope Area, Install Geotextile Turf Product, Water Return Ditch And Pond 5 Areas.
- Region 4 Contracting Office
- Environmental Protection Agency (Epa)
- $22,361,044.91
- Environmental Protection Agency (Epa)
- 68HE0421C0002
- Mississippi Phosphate Phase 1C In Pascagoula, Ms. This Phase Will Include The Earthwork Necessary To Complete The Remaining Slope Area, Install Geotextile Turf Product, Water Return Ditch And Pond 5 Areas. Modification 2 Is For Various Changes, No Ad
- 14 Dec 2021
- Mississippi Phosphate Phase 1C In Pascagoula, Ms. This Phase Will Include The Earthwork Necessary To Complete The Remaining Slope Area, Install Geotextile Turf Product, Water Return Ditch And Pond 5 Areas. Modification 2 Is For Various Changes, No Ad
- Region 4 Contracting Office
- Environmental Protection Agency (Epa)
- $10,035,315.93
- Environmental Protection Agency (Epa)
- 68HE0421C0002
- Mississippi Phosphate Phase 1C In Pascagoula, Ms. This Phase Will Include The Earthwork Necessary To Complete The Remaining Slope Area, Install Geotextile Turf Product, Water Return Ditch And Pond 5 Areas. Modification 5 Is Administrative Only And Ex
- 10 Jun 2022
- Mississippi Phosphate Phase 1C In Pascagoula, Ms. This Phase Will Include The Earthwork Necessary To Complete The Remaining Slope Area, Install Geotextile Turf Product, Water Return Ditch And Pond 5 Areas. Modification 5 Is Administrative Only And Ex
- Region 4 Contracting Office
- Environmental Protection Agency (Epa)
- $22,361,044.91
- Environmental Protection Agency (Epa)
- 68HE0421C0002
- Mississippi Phosphate Phase 1C In Pascagoula, Ms. This Phase Will Include The Earthwork Necessary To Complete The Remaining Slope Area, Install Geotextile Turf Product, Water Return Ditch And Pond 5 Areas. Modification 11 Is To Add Incremental Fundin
- 27 Sep 2023
- Mississippi Phosphate Phase 1C In Pascagoula, Ms. This Phase Will Include The Earthwork Necessary To Complete The Remaining Slope Area, Install Geotextile Turf Product, Water Return Ditch And Pond 5 Areas. Modification 11 Is To Add Incremental Fundin
- Region 4 Contracting Office
- Environmental Protection Agency (Epa)
- $32,357,865.32
- Environmental Protection Agency (Epa)
- 68HE0421C0002
- Mississippi Phosphate Phase 1C In Pascagoula, Ms. This Phase Will Include The Earthwork Necessary To Complete The Remaining Slope Area, Install Geotextile Turf Product, Water Return Ditch And Pond 5 Areas. Modification 6 Is Increasing The Ceiling And
- 2 Feb 2023
- Mississippi Phosphate Phase 1C In Pascagoula, Ms. This Phase Will Include The Earthwork Necessary To Complete The Remaining Slope Area, Install Geotextile Turf Product, Water Return Ditch And Pond 5 Areas. Modification 6 Is Increasing The Ceiling And
- Region 4 Contracting Office
- Environmental Protection Agency (Epa)
- $26,234,744.91
- Environmental Protection Agency (Epa)
- 68HE0421C0002
- Mississippi Phosphate Phase 1C In Pascagoula, Ms. This Phase Will Include The Earthwork Necessary To Complete The Remaining Slope Area, Install Geotextile Turf Product, Water Return Ditch And Pond 5 Areas. Modification 7 Is To Obligate Incremental Fu
- 8 Mar 2023
- Mississippi Phosphate Phase 1C In Pascagoula, Ms. This Phase Will Include The Earthwork Necessary To Complete The Remaining Slope Area, Install Geotextile Turf Product, Water Return Ditch And Pond 5 Areas. Modification 7 Is To Obligate Incremental Fu
- Region 4 Contracting Office
- Environmental Protection Agency (Epa)
- $29,109,721.82
- Environmental Protection Agency (Epa)
- 68HE0421C0002
- Mississippi Phosphate Phase 1C In Pascagoula, Ms. This Phase Will Include The Earthwork Necessary To Complete The Remaining Slope Area, Install Geotextile Turf Product, Water Return Ditch And Pond 5 Areas.
- 27 Apr 2022
- Mississippi Phosphate Phase 1C In Pascagoula, Ms. This Phase Will Include The Earthwork Necessary To Complete The Remaining Slope Area, Install Geotextile Turf Product, Water Return Ditch And Pond 5 Areas.
- Region 4 Contracting Office
- Environmental Protection Agency (Epa)
- $10,533,574.93
- Environmental Protection Agency (Epa)
- N6247320C0067
- Ltm Ir Site 26 Moffett Field
- 14 Dec 2021
- Ltm Ir Site 26 Moffett Field
- Navfac Southwest
- Department Of Defense (Dod)
- $384,044.72
- Department Of Defense (Dod)
- N6247320C0067
- Ltm Ir Site 26 Moffett Field, Pre-Priced We6 - 12 Additional Months Of Additional Groundwater Monitoring Sampling And Reporting.
- 3 May 2021
- Ltm Ir Site 26 Moffett Field, Pre-Priced We6 - 12 Additional Months Of Additional Groundwater Monitoring Sampling And Reporting.
- Navfac Southwest
- Department Of Defense (Dod)
- $479,003.35
- Department Of Defense (Dod)
- N6247320C0067
- Long Term Monitoring For Installation Restoration Site 26, Former Naval Station Moffett Field, Moffett Field, California - Monitoring Well Repair To Support Property Transfer To Nasa.
- 3 Aug 2021
- Long Term Monitoring For Installation Restoration Site 26, Former Naval Station Moffett Field, Moffett Field, California - Monitoring Well Repair To Support Property Transfer To Nasa.
- Navfac Southwest
- Department Of Defense (Dod)
- $539,049.14
- Department Of Defense (Dod)
- N6247320C0067
- Ltm Ir Site 26 Moffett Field
- 28 Jul 2020
- Ltm Ir Site 26 Moffett Field
- Navfac Southwest
- Department Of Defense (Dod)
- $384,044.72
- Department Of Defense (Dod)
- 33330222FF0010362
- Nmaahc: Repair Hazmat Tank Neck.
- 7 Nov 2023
- Nmaahc: Repair Hazmat Tank Neck.
- Smithsonian Institution
- Smithsonian Institution (Si)
- $275,077.00
- Smithsonian Institution (Si)