Mccarthy Hitt Jv Ii

CAGE Code: 7DAQ9

NCAGE Code: 7DAQ9

Status: Active

Type: Commercial Supplier

Summary

Mccarthy Hitt Jv Ii is an Active Commercial Supplier with the Cage Code 7DAQ9.

Address

2900 Fairview Park Dr
Falls Church VA 22042-4513
United States

Points of Contact

No Points of Contact...

Related Information

No Related Information...

Associated CAGE Codes People who viewed this 'CAGE Code' also viewed...

CAGE Code FAQ Frequently Asked Questions (FAQ) for CAGE 7DAQ9

What is CAGE Code 7DAQ9?
7DAQ9 is the unique identifier used by NATO Organizations to reference the physical entity known as Mccarthy Hitt Jv Ii located at 2900 Fairview Park Dr, Falls Church VA 22042-4513, United States.
Who is CAGE Code 7DAQ9?
7DAQ9 refers to Mccarthy Hitt Jv Ii located at 2900 Fairview Park Dr, Falls Church VA 22042-4513, United States.
Where is CAGE Code 7DAQ9 Located?
CAGE Code 7DAQ9 is located in Falls Church, VA, USA.

Contracting History for CAGE 7DAQ9 Contracting History for CAGE 7DAQ9 Most Recent 25 Records

W912DR18F0744
Time Extension To Submit 95% Design This Change Provides A Non-Compensable Time Extension Of 130 Calendar Days To The Contract Performance Period To Allow Time For The Contractor To Reassemble Their Design And Construction Teams And Resubmit The Rev
7 Jun 2022
W2sd Endist Baltimore
Department Of Defense (Dod)
$6,647,755.59
W912DR18F0744
Structural Repairs Per Seismic Report The Contractor Shall Provide All Labor, Equipment, Materials, And Supervision Necessary To Repair The Existing Seismic Lateral Force Resisting System And Lateral Bracing System In Accordance With The Original De
23 Aug 2023
W2sd Endist Baltimore
Department Of Defense (Dod)
$9,126,051.18
W912DR18F0744
Rea - Replace Domestic Water Piping The Contractor Shall Provide All Labor, Materials, Testing, Supervision, And Equipment Necessary To Replace The Existing Hot Water Piping Loop, Including Piping, Branch Valves, And Water Hammer Arrestors.
5 May 2023
W2sd Endist Baltimore
Department Of Defense (Dod)
$7,098,705.59
W912DR18F0744
Abatement Of Additional Hazmat The Contractor Shall Furnish All Labor, Equipment, Materials And Supervision Necessary To Abate The Asbestos - Contained In The Mirror Glue (Dot Mastic, Black) Located On The Interior Walls Where Mirrors Were Hanging I
9 Aug 2022
W2sd Endist Baltimore
Department Of Defense (Dod)
$6,972,786.59
W912DR18F0744
More Facility Changes The Contractor Shall Provide All Labor, Materials, Testing, Supervision And Equipment Necessary To Modify The Design And Construction For Building 4725 (Cdc I) In Accordance With The Following: 1- Replace Bathroom Stall Dividers
14 Feb 2023
W2sd Endist Baltimore
Department Of Defense (Dod)
$7,098,705.59
W912DR18F0744
Change Ak - Remove, Salvage, And Install Kitchen Equipment
20 Jul 2022
W2sd Endist Baltimore
Department Of Defense (Dod)
$6,972,786.59
W912DR18F0744
The Contractor Shall Provide All Labor, Equipment, Testing, Materials And Supervision Necessary To: 1- Replace And Paint All Exterior Doors & Frames (See Attached Sketches #1 & #2). 2- Provide New Hardware. 3- Provide Closers To Be Des
9 Aug 2022
W2sd Endist Baltimore
Department Of Defense (Dod)
$6,972,786.59
W912DR18F0744
Replace Lighting Item 1. The Contractor Shall Provide All Labor, Materials, Testing, Supervision, And Equipment Necessary To Remove The Existing Cabinet Light Fixtures (Above The Counter And Under The Cabinets) And Replace Them With New Led (Energy
3 Aug 2022
W2sd Endist Baltimore
Department Of Defense (Dod)
$6,972,786.59
W912DR18F0744
Cdc I Renovation - Change Bb, Mold Removal
18 Aug 2023
W2sd Endist Baltimore
Department Of Defense (Dod)
$9,126,051.18
W912DR18F0744
Rtu Additional Circuit Breakers The Contractor Shall Provide All Labor, Materials, Testing, Design, Supervision, And Equipment Necessary To Modify The Design And Construction For Building 4725 (Cdc I) In Accordance With The Following: 1- Rtu-1 And
22 Jul 2022
W2sd Endist Baltimore
Department Of Defense (Dod)
$6,972,786.59
W912DR18F0744
Change Ba - Replace Plumbing, Millwork, Casework And Windowsills
18 Sep 2023
W2sd Endist Baltimore
Department Of Defense (Dod)
$9,126,051.18
W912DR18F0744
Replace Finishes The Contractor Shall Provide All Labor, Materials, Testing, Supervision, And Equipment Necessary To Remove And Replace The Existing Drywall With Impact-Resistant Drywall, Vinyl Wall Covering, Wall Base, And Corner Guards In
21 Jul 2022
W2sd Endist Baltimore
Department Of Defense (Dod)
$6,972,786.59
W912DR18F0744
Item 1. The Contractor Shall Provide All Labor, Equipment, Materials And Supervision To Remove All Cabling Related To The Existing Security Camera System And Patch Associated Holes In The Ceiling. Item 2. The Contractor Shall Provide A Credit For Al
27 Jul 2022
W2sd Endist Baltimore
Department Of Defense (Dod)
$6,972,786.59
W912DR18F0744
Changes Aa, Ab, Ac & Ae - Design And Construction Changes.
30 Mar 2021
W2sd Endist Baltimore
Department Of Defense (Dod)
$6,162,531.00