Ahtna-Cdm Smith Jv
CAGE Code: 75T10
NCAGE Code: 75T10
Status: Active
Type: Commercial Supplier
Summary
Ahtna-Cdm Smith Jv is an Active Commercial Supplier with the Cage Code 75T10.
Address
3200 El Camino Real Ste 240
Irvine CA 92602-1378
United States
Points of Contact
No Points of Contact...
Related Information
No Related Information...
People who viewed this 'CAGE Code' also viewed...
Silicon Graphics Federal, Inc. Applied Microsystems Corp Synopsys Inc Global Data Center Ultrasystems Environmental Ultrasystems Environmental Automated Marine International Adaptiv Software Corp Inc World Library Inc Jonathan Engineered Solutions Corp. Bearing Engineers Inc Continus Software Corp Digicad Corp Elpac Electronics Inc Component Div Wbi Energy Services Inc Memory Intl Inc Love Charity Foundation Proteon Inc Developers General Contracting, Inc Oakley Inc
Frequently Asked Questions (FAQ) for CAGE 75T10
- What is CAGE Code 75T10?
- 75T10 is the unique identifier used by NATO Organizations to reference the physical entity known as Ahtna-Cdm Smith Jv located at 3200 El Camino Real Ste 240, Irvine CA 92602-1378, United States.
- Who is CAGE Code 75T10?
- 75T10 refers to Ahtna-Cdm Smith Jv located at 3200 El Camino Real Ste 240, Irvine CA 92602-1378, United States.
- Where is CAGE Code 75T10 Located?
- CAGE Code 75T10 is located in Irvine, CA, USA.
Contracting History for CAGE 75T10 Most Recent 25 Records
- FA890323F0146
- Design-Build Construction Services To Repair/Refurbish Main Ramp, Aircraft Sunshades, And Taxiway At Ebbing Angb, Fort Smith, Ar.
- 28 Sep 2023
- Design-Build Construction Services To Repair/Refurbish Main Ramp, Aircraft Sunshades, And Taxiway At Ebbing Angb, Fort Smith, Ar.
- Fa8903 772 Ess Pk
- Department Of Defense (Dod)
- $11,625,804.00
- Department Of Defense (Dod)
- FA890323F0145
- Design And Construction Services For Cdp Ramp Repair At Ebbing Angb, Ft. Smith, Ar.
- 28 Sep 2023
- Design And Construction Services For Cdp Ramp Repair At Ebbing Angb, Ft. Smith, Ar.
- Fa8903 772 Ess Pk
- Department Of Defense (Dod)
- $7,274,974.00
- Department Of Defense (Dod)
- FA890323F0145
- Design And Construction Services For Cargo Deployment Ramp Repair, Ebbing Angb, Ft. Smith, Ar.
- 22 Sep 2023
- Design And Construction Services For Cargo Deployment Ramp Repair, Ebbing Angb, Ft. Smith, Ar.
- Fa8903 772 Ess Pk
- Department Of Defense (Dod)
- $7,274,974.00
- Department Of Defense (Dod)
- FA890323F0145
- Design And Construction Services For Cargo Deployment Ramp Repair, Ebbing Angb, Ft. Smith, Ar.
- 27 Sep 2023
- Design And Construction Services For Cargo Deployment Ramp Repair, Ebbing Angb, Ft. Smith, Ar.
- Fa8903 772 Ess Pk
- Department Of Defense (Dod)
- $7,274,974.00
- Department Of Defense (Dod)
- FA468622F0047
- Runway Rubber Removal And Stripping.
- 18 May 2023
- Runway Rubber Removal And Stripping.
- Fa4686 9 Cons Pkp
- Department Of Defense (Dod)
- $293,404.00
- Department Of Defense (Dod)
- FA468622F0047
- Airfield Painting And Rubber Removal
- 13 Sep 2022
- Airfield Painting And Rubber Removal
- Fa4686 9 Cons Lgc
- Department Of Defense (Dod)
- $293,404.00
- Department Of Defense (Dod)
- FA890323F0130
- Repair Fuel Tanks At Maxwell Afb, Alabama
- 28 Sep 2023
- Repair Fuel Tanks At Maxwell Afb, Alabama
- Fa8903 772 Ess Pk
- Department Of Defense (Dod)
- $5,525,884.00
- Department Of Defense (Dod)
- FA468622F0041
- Building 2159 Hvac, Beale Afb, Ca
- 5 Jul 2023
- Building 2159 Hvac, Beale Afb, Ca
- Fa4686 9 Cons Pkp
- Department Of Defense (Dod)
- $1,981,304.00
- Department Of Defense (Dod)
- FA468622F0041
- Design And Construction Of A Crah (Computer Room Air Handler) Based Hvac System. A Minimum Net Cooling Capacity Of 9.175 Tons Shall Be Provided Per Crah Unit Supplied. 4 New Crah Units And A Paired Chiller Shall Be Provided. Pop: 469 Calendar Days
- 12 Sep 2022
- Design And Construction Of A Crah (Computer Room Air Handler) Based Hvac System. A Minimum Net Cooling Capacity Of 9.175 Tons Shall Be Provided Per Crah Unit Supplied. 4 New Crah Units And A Paired Chiller Shall Be Provided. Pop: 469 Calendar Days
- Fa4686 9 Cons Lgc
- Department Of Defense (Dod)
- $1,981,304.00
- Department Of Defense (Dod)
- FA468622F0036
- The Change In Performance Period Due To Excusable Delays Concerning The Limited Operations Period And Environmental Concerns.
- 31 May 2023
- The Change In Performance Period Due To Excusable Delays Concerning The Limited Operations Period And Environmental Concerns.
- Fa4686 9 Cons Pkp
- Department Of Defense (Dod)
- $1,253,476.00
- Department Of Defense (Dod)
- FA468622F0036
- The Removal Of A Chain Linked Fence Around The Main Electrical Switch Yard, And The Replacement Through The Construction Of A Concrete Masonry Unit Cmu Wall. Additionally There Is A Roof Like Structure On Top To Deter Critters (Aka Racoon Roof).
- 31 Aug 2022
- The Removal Of A Chain Linked Fence Around The Main Electrical Switch Yard, And The Replacement Through The Construction Of A Concrete Masonry Unit Cmu Wall. Additionally There Is A Roof Like Structure On Top To Deter Critters (Aka Racoon Roof).
- Fa4686 9 Cons Lgc
- Department Of Defense (Dod)
- $1,253,476.00
- Department Of Defense (Dod)
- FA468622F0036
- B26240 - Cmu Wall For Central Switchyard
- 23 Feb 2023
- B26240 - Cmu Wall For Central Switchyard
- Fa4686 9 Cons Pkp
- Department Of Defense (Dod)
- $1,253,476.00
- Department Of Defense (Dod)
- FA468622F0005
- Design And Replace Boilers For Dorms.
- 8 Feb 2022
- Design And Replace Boilers For Dorms.
- Fa4686 9 Cons Lgc
- Department Of Defense (Dod)
- $474,480.00
- Department Of Defense (Dod)
- FA468622F0005
- To Add In Siemens Controls.
- 11 Aug 2023
- To Add In Siemens Controls.
- Fa4686 9 Cons Pkp
- Department Of Defense (Dod)
- $637,606.45
- Department Of Defense (Dod)
- FA468622F0005
- Change In Design To Allow Redundancy Of The System.
- 5 Jul 2022
- Change In Design To Allow Redundancy Of The System.
- Fa4686 9 Cons Lgc
- Department Of Defense (Dod)
- $524,441.04
- Department Of Defense (Dod)
- FA468621F0076
- The Purpose Of The Modification Is To Extend The Period Of Performance Out An Additional 71 Days From The Completion Of Modification P00001 End Date. This Will Make The New Total Pop 262 Days From Original Ntp.
- 22 Apr 2022
- The Purpose Of The Modification Is To Extend The Period Of Performance Out An Additional 71 Days From The Completion Of Modification P00001 End Date. This Will Make The New Total Pop 262 Days From Original Ntp.
- Fa4686 9 Cons Lgc
- Department Of Defense (Dod)
- $1,188,445.00
- Department Of Defense (Dod)
- FA468621F0076
- This Modification Is To Extend The Contract Due To Rainy Seasons Delays And Environmental Impacts On Base.
- 5 Nov 2021
- This Modification Is To Extend The Contract Due To Rainy Seasons Delays And Environmental Impacts On Base.
- Fa4686 9 Cons Lgc
- Department Of Defense (Dod)
- $1,188,445.00
- Department Of Defense (Dod)
- FA468621F0076
- South Apron Concrete Expansion Project
- 23 Sep 2021
- South Apron Concrete Expansion Project
- Fa4686 9 Cons Lgc
- Department Of Defense (Dod)
- $1,188,445.00
- Department Of Defense (Dod)
- FA468621F0098
- Rec Task Order To Replace The Fire Suppression System At B1073 At Beale Afb
- 30 Sep 2021
- Rec Task Order To Replace The Fire Suppression System At B1073 At Beale Afb
- Fa4686 9 Cons Lgc
- Department Of Defense (Dod)
- $771,364.00
- Department Of Defense (Dod)
- FA468621F0098
- Rec Task Order To Replace The Fire Suppression System At B1073 At Beale Afb
- 20 May 2022
- Rec Task Order To Replace The Fire Suppression System At B1073 At Beale Afb
- Fa4686 9 Cons Lgc
- Department Of Defense (Dod)
- $771,364.00
- Department Of Defense (Dod)
- FA468621F0098
- Rec Task Order To Replace The Fire Suppression System At B1073 At Beale Afb
- 2 Aug 2022
- Rec Task Order To Replace The Fire Suppression System At B1073 At Beale Afb
- Fa4686 9 Cons Lgc
- Department Of Defense (Dod)
- $771,364.00
- Department Of Defense (Dod)
- FA468621F0067
- This Modification Is To Extend The Period Of Performance For This Contract Due To The Rainy Season And The Environmental Impact.
- 5 Nov 2021
- This Modification Is To Extend The Period Of Performance For This Contract Due To The Rainy Season And The Environmental Impact.
- Fa4686 9 Cons Lgc
- Department Of Defense (Dod)
- $648,723.00
- Department Of Defense (Dod)
- FA468621F0067
- Rubber Removal And Paint
- 16 Sep 2021
- Rubber Removal And Paint
- Fa4686 9 Cons Lgc
- Department Of Defense (Dod)
- $648,723.00
- Department Of Defense (Dod)
- FA468621F0067
- This Modification Is To Extend The Period Of Performance For This Contract Due To The Limited Operations Rainy Season And The Environmental Impact.
- 17 Mar 2022
- This Modification Is To Extend The Period Of Performance For This Contract Due To The Limited Operations Rainy Season And The Environmental Impact.
- Fa4686 9 Cons Lgc
- Department Of Defense (Dod)
- $648,723.00
- Department Of Defense (Dod)
- FA468620F0112
- Exercise Option 2 Design And Construction Of Vehicle Gate Located At Base Operations On Beale Afb.
- 29 Sep 2020
- Exercise Option 2 Design And Construction Of Vehicle Gate Located At Base Operations On Beale Afb.
- Fa4686 9 Cons Lgc
- Department Of Defense (Dod)
- $645,240.00
- Department Of Defense (Dod)