Pontchartrain Partners Llc
Dba Pontchartrain Partners Llc
CAGE Code: 75DW2
NCAGE Code: 75DW2
Status: Active
Type: Commercial Supplier
Summary
Pontchartrain Partners Llc, Dba Pontchartrain Partners Llc is an Active Commercial Supplier with the Cage Code 75DW2.
Address
465 Forrest Ave
Ste 125
Cocoa FL 32922-7729
United States
Points of Contact
No Points of Contact...
Related Information
No Related Information...
People who viewed this 'CAGE Code' also viewed...
Barker & Williamson Johnston Atoll Services A Joint Southern Tape And Label A.B.C. Landclearing And Development, S & J Produceof Brevard Inc Space Coast Container Inc Far East Cycle Inc Sri Jalaram, Llc Beyel Brothers, Inc. Blue Quest Inc Dynamic Wheels And Tires Securitech Applied Global Technologies, Inc. Total Septic Inc Industrial Waste Service Inc Cullers And Nutter Inc Ellington Construction Co S P T Enterprises Framed Sensations Cocoa Heating And Air
Frequently Asked Questions (FAQ) for CAGE 75DW2
- What is CAGE Code 75DW2?
- 75DW2 is the unique identifier used by NATO Organizations to reference the physical entity known as Pontchartrain Partners Llc Dba Pontchartrain Partners Llc located at 465 Forrest Ave, Ste 125, Cocoa FL 32922-7729, United States.
- Who is CAGE Code 75DW2?
- 75DW2 refers to Pontchartrain Partners Llc Dba Pontchartrain Partners Llc located at 465 Forrest Ave, Ste 125, Cocoa FL 32922-7729, United States.
- Where is CAGE Code 75DW2 Located?
- CAGE Code 75DW2 is located in Cocoa, FL, USA.
Contracting History for CAGE 75DW2 Most Recent 25 Records
- 80KSC019F0258
- Upgrade/Repair K7-0165 Hazardous Waste Storage Building/Liquids. Incorporates Tracking Number 05 In The Amount Of $29,341.62. All Other Terms And Conditions Remain Unchanged.
- 28 Jun 2023
- Upgrade/Repair K7-0165 Hazardous Waste Storage Building/Liquids. Incorporates Tracking Number 05 In The Amount Of $29,341.62. All Other Terms And Conditions Remain Unchanged.
- Nasa Kennedy Space Center
- National Aeronautics And Space Administration (Nasa)
- $566,788.98
- National Aeronautics And Space Administration (Nasa)
- 80KSC019F0258
- Upgrade/Repair K7-0165 Hazardous Waste Storage Building/Liquids, Pcn 99290. The Purpose Of This Unilateral Modification Is To Issue The Notice To Proceed (Ntp) And Establish The Period Of Performance Of March 3, 2020 Through August 30, 2020.
- 19 May 2020
- Upgrade/Repair K7-0165 Hazardous Waste Storage Building/Liquids, Pcn 99290. The Purpose Of This Unilateral Modification Is To Issue The Notice To Proceed (Ntp) And Establish The Period Of Performance Of March 3, 2020 Through August 30, 2020.
- Nasa Kennedy Space Center
- National Aeronautics And Space Administration (Nasa)
- $379,447.36
- National Aeronautics And Space Administration (Nasa)
- 80KSC019F0258
- Upgrade/Repair K7-0165 Hazardous Waste Storage Building/Liquids. Mod 6: Incorporates Deviation Waiver 01, Purlins. Funding Is De-Obligated. All Other Terms And Conditions Remain Unchanged.
- 16 Apr 2021
- Upgrade/Repair K7-0165 Hazardous Waste Storage Building/Liquids. Mod 6: Incorporates Deviation Waiver 01, Purlins. Funding Is De-Obligated. All Other Terms And Conditions Remain Unchanged.
- Nasa Kennedy Space Center
- National Aeronautics And Space Administration (Nasa)
- $379,447.36
- National Aeronautics And Space Administration (Nasa)
- 80KSC019F0258
- Upgrade/Repair K7-0165 Hazardous Waste Storage Building/Liquids. Mod 8: Changes The Contracting Officer From Richard Baker To Jose Torres. All Other Terms And Conditions Remain Unchanged.
- 12 May 2021
- Upgrade/Repair K7-0165 Hazardous Waste Storage Building/Liquids. Mod 8: Changes The Contracting Officer From Richard Baker To Jose Torres. All Other Terms And Conditions Remain Unchanged.
- Nasa Kennedy Space Center
- National Aeronautics And Space Administration (Nasa)
- $379,447.36
- National Aeronautics And Space Administration (Nasa)
- 80KSC019F0258
- Upgrade/Repair K7-0165 Hazardous Waste Storage Building/Liquids, Pcn 99290. Mod 3: Extends Period Of Performance To Accommodate For Delays In The Review And Approval Of The Site Specific Safety Plan.
- 21 Aug 2020
- Upgrade/Repair K7-0165 Hazardous Waste Storage Building/Liquids, Pcn 99290. Mod 3: Extends Period Of Performance To Accommodate For Delays In The Review And Approval Of The Site Specific Safety Plan.
- Nasa Kennedy Space Center
- National Aeronautics And Space Administration (Nasa)
- $379,447.36
- National Aeronautics And Space Administration (Nasa)
- 80KSC019F0258
- Upgrade/Repair K7-0165 Hazardous Waste Storage Building/Liquids. Incorporates Tracking Number 01 For Roof Removal By Abatement, Revised Statement Of Work, Extends Completion Date To 4/6/2021 And Increases Contract Value $27,000.
- 28 Jan 2021
- Upgrade/Repair K7-0165 Hazardous Waste Storage Building/Liquids. Incorporates Tracking Number 01 For Roof Removal By Abatement, Revised Statement Of Work, Extends Completion Date To 4/6/2021 And Increases Contract Value $27,000.
- Nasa Kennedy Space Center
- National Aeronautics And Space Administration (Nasa)
- $379,447.36
- National Aeronautics And Space Administration (Nasa)
- 80KSC019F0258
- Upgrade/Repair K7-0165 Hazardous Waste Storage Building/Liquids, Pcn 99290. Mod 9: Incorporates Tracking Number (Tn)-04. Funding And Values Are Increased. All Other Terms And Conditions Remain Unchanged.
- 20 Sep 2022
- Upgrade/Repair K7-0165 Hazardous Waste Storage Building/Liquids, Pcn 99290. Mod 9: Incorporates Tracking Number (Tn)-04. Funding And Values Are Increased. All Other Terms And Conditions Remain Unchanged.
- Nasa Kennedy Space Center
- National Aeronautics And Space Administration (Nasa)
- $537,447.36
- National Aeronautics And Space Administration (Nasa)
- 80KSC019F0258
- Upgrade/Repair K7-0165 Hazardous Waste Storage Building/Liquids, Pcn 99290. Mod 9: Incorporates Tracking Number (Tn)-03. Funding And Values Are Increased And Period Of Performance Per Far Clause 52.211.10 Is Extended.
- 28 Sep 2021
- Upgrade/Repair K7-0165 Hazardous Waste Storage Building/Liquids, Pcn 99290. Mod 9: Incorporates Tracking Number (Tn)-03. Funding And Values Are Increased And Period Of Performance Per Far Clause 52.211.10 Is Extended.
- Nasa Kennedy Space Center
- National Aeronautics And Space Administration (Nasa)
- $379,447.36
- National Aeronautics And Space Administration (Nasa)
- 80KSC019F0258
- Upgrade/Repair K7-0165 Hazardous Waste Storage Building/Liquids, Pcn 99290. Mod 2: Incorporates, By Reference, Far Clause 52.204-25 In Section I
- 18 Aug 2020
- Upgrade/Repair K7-0165 Hazardous Waste Storage Building/Liquids, Pcn 99290. Mod 2: Incorporates, By Reference, Far Clause 52.204-25 In Section I
- Nasa Kennedy Space Center
- National Aeronautics And Space Administration (Nasa)
- $379,447.36
- National Aeronautics And Space Administration (Nasa)
- 80KSC019F0258
- Upgrade/Repair K7-0165 Hazardous Waste Storage Building/Liquids. Incorporates Tracking Number 02 Descope Of Electric Door, De-Ob Of $13,202.64, And Revised Statement Of Work And Statement Of Objectives.
- 26 Apr 2021
- Upgrade/Repair K7-0165 Hazardous Waste Storage Building/Liquids. Incorporates Tracking Number 02 Descope Of Electric Door, De-Ob Of $13,202.64, And Revised Statement Of Work And Statement Of Objectives.
- Nasa Kennedy Space Center
- National Aeronautics And Space Administration (Nasa)
- $379,447.36
- National Aeronautics And Space Administration (Nasa)
- 80KSC019F0258
- The Contractor Shall Furnish All Labor, Equipment, Materials And Related Activities For The Upgrade/Repair K7-0165 Hazardous Waste Storage Building/Liquids, Pcn 99290.
- 27 Sep 2019
- The Contractor Shall Furnish All Labor, Equipment, Materials And Related Activities For The Upgrade/Repair K7-0165 Hazardous Waste Storage Building/Liquids, Pcn 99290.
- Nasa Kennedy Space Center
- National Aeronautics And Space Administration (Nasa)
- $379,447.36
- National Aeronautics And Space Administration (Nasa)
- FA252119FA197
- Sxht18-1122 Repair Bldg 533
- 17 Jul 2019
- Sxht18-1122 Repair Bldg 533
- Fa2521 45 Cons Lgc
- Department Of Defense (Dod)
- $428,136.83
- Department Of Defense (Dod)
- FA252119FA197
- To Is To Repair The Roof On B533. P00005 Is A De-Ob Mod To Remove The Credit Owed To The Government As Stated In Mod #02.
- 17 Mar 2020
- To Is To Repair The Roof On B533. P00005 Is A De-Ob Mod To Remove The Credit Owed To The Government As Stated In Mod #02.
- Fa2521 45 Cons Lgc
- Department Of Defense (Dod)
- $428,136.83
- Department Of Defense (Dod)
- FA252119FA197
- To: Repair The Roof On B533p00003: Pop Extension Of 43 Days
- 18 Dec 2019
- To: Repair The Roof On B533p00003: Pop Extension Of 43 Days
- Fa2521 45 Cons Lgc
- Department Of Defense (Dod)
- $428,136.83
- Department Of Defense (Dod)
- FA252119FA197
- To Is To Provide All Labor/Material To Repair The Roof Of B533 As Stated Within The Sow.P00002 Is To De-Scope The Surge Suppression Work And Provide A Credit Back To The Govt For The Material And Labor Costs Associated With The De-Scoped Work.
- 17 Dec 2019
- To Is To Provide All Labor/Material To Repair The Roof Of B533 As Stated Within The Sow.P00002 Is To De-Scope The Surge Suppression Work And Provide A Credit Back To The Govt For The Material And Labor Costs Associated With The De-Scoped Work.
- Fa2521 45 Cons Lgc
- Department Of Defense (Dod)
- $428,136.83
- Department Of Defense (Dod)
- FA252119FA197
- To Is To Repair The Roof On B533.P00004 Is A No-Cost Time Extension To Add 45 Days To All The Ktr To Complete The Remaining Work On The Project.
- 31 Jan 2020
- To Is To Repair The Roof On B533.P00004 Is A No-Cost Time Extension To Add 45 Days To All The Ktr To Complete The Remaining Work On The Project.
- Fa2521 45 Cons Lgc
- Department Of Defense (Dod)
- $428,136.83
- Department Of Defense (Dod)
- FA252119FA197
- Notice To Proceed Modification To Establish A Completion Date.
- 4 Oct 2019
- Notice To Proceed Modification To Establish A Completion Date.
- Fa2521 45 Cons Lgc
- Department Of Defense (Dod)
- $428,136.83
- Department Of Defense (Dod)
- 80KSC017F0109
- Facility Area Improvements, Phase Ii, Lcc Bathroom Renovations Mod 9: The Period Of Performance Is Extended From September 06, 2019 To September 20, 2019.
- 13 Sep 2019
- Facility Area Improvements, Phase Ii, Lcc Bathroom Renovations Mod 9: The Period Of Performance Is Extended From September 06, 2019 To September 20, 2019.
- Nasa Kennedy Space Center
- National Aeronautics And Space Administration (Nasa)
- $828,485.27
- National Aeronautics And Space Administration (Nasa)
- 80KSC020F0208
- Modifications To Second Floor In Propellants Maintenance Facility Mod 3: Incorporate Tracking Number (Tn)-02. The Total Amount Of This Order Is Increased To $204,930.60. All Other Terms And Conditions Remain Unchanged.
- 10 Feb 2022
- Modifications To Second Floor In Propellants Maintenance Facility Mod 3: Incorporate Tracking Number (Tn)-02. The Total Amount Of This Order Is Increased To $204,930.60. All Other Terms And Conditions Remain Unchanged.
- Nasa Kennedy Space Center
- National Aeronautics And Space Administration (Nasa)
- $206,485.60
- National Aeronautics And Space Administration (Nasa)
- NNK16EA18B
- Simplified Acquisition Of Base Engineering Requirements (Saber) Contract. The Purpose Of This Modification Is To Change The Contractor's Address From: 1200 Nw 78Th Ave Ste 213 Miami Florida 33126-1890 To 465 Forrest Ave, Ste, 125 Cocoa, Fl 32922-7729
- 7 Nov 2019
- Simplified Acquisition Of Base Engineering Requirements (Saber) Contract. The Purpose Of This Modification Is To Change The Contractor's Address From: 1200 Nw 78Th Ave Ste 213 Miami Florida 33126-1890 To 465 Forrest Ave, Ste, 125 Cocoa, Fl 32922-7729
- Nasa Kennedy Space Center
- National Aeronautics And Space Administration (Nasa)
- $0.00
- National Aeronautics And Space Administration (Nasa)
- NNK16CA63T
- Simplified Acquisition Of Base Engineering Requirements (Saber) Contract - Task Order 8 - Replace Roofs At Various Institutional Facilities, Pcn 99128 Mod 8: The Purpose Of This No Cost Modification Is To Revise The Contract As Follows: Incorporate The Following Contract Change: The Period Of Performance Is Revised From April 22, 2019 To July 05, 2019.
- 22 Apr 2019
- Simplified Acquisition Of Base Engineering Requirements (Saber) Contract - Task Order 8 - Replace Roofs At Various Institutional Facilities, Pcn 99128 Mod 8: The Purpose Of This No Cost Modification Is To Revise The Contract As Follows: Incorporate The Following Contract Change: The Period Of Performance Is Revised From April 22, 2019 To July 05, 2019.
- Nasa Kennedy Space Center
- National Aeronautics And Space Administration (Nasa)
- $1,008,520.00
- National Aeronautics And Space Administration (Nasa)
- 80KSC018F0294
- Upgrade/Refurbish Operations&Checkout (O&C) Rest Rooms 1258/1262 (M7-0355), Pcn: 99186.4 This Modification Incorporates The Notice To Proceed (Ntp); Establishes The Period Of Performance 2/19/19 - 8/18/2019; And Provides Statement Of Work Revision A (Attached).
- 25 Sep 2019
- Upgrade/Refurbish Operations&Checkout (O&C) Rest Rooms 1258/1262 (M7-0355), Pcn: 99186.4 This Modification Incorporates The Notice To Proceed (Ntp); Establishes The Period Of Performance 2/19/19 - 8/18/2019; And Provides Statement Of Work Revision A (Attached).
- Nasa Kennedy Space Center
- National Aeronautics And Space Administration (Nasa)
- $117,460.05
- National Aeronautics And Space Administration (Nasa)
- 80KSC019F0257
- Restroom Construction/Renovation At The Reutilization, Recycling, And Marketing Facility Mod 8: Changes The Contracting Officer From Richard Baker To Jose Torres. All Other Terms And Conditions Remain Unchanged.
- 12 May 2021
- Restroom Construction/Renovation At The Reutilization, Recycling, And Marketing Facility Mod 8: Changes The Contracting Officer From Richard Baker To Jose Torres. All Other Terms And Conditions Remain Unchanged.
- Nasa Kennedy Space Center
- National Aeronautics And Space Administration (Nasa)
- $128,146.94
- National Aeronautics And Space Administration (Nasa)
- 80KSC019F0259
- K7-0115 Pcb Waste Storage Building Repairs And Upgrades, Pcn 99291. The Purpose Of This Unilateral Modification Is To Issue The Notice To Proceed (Ntp) And Establish The Period Of Performance Of March 3, 2020 Through August 30, 2020.
- 19 May 2020
- K7-0115 Pcb Waste Storage Building Repairs And Upgrades, Pcn 99291. The Purpose Of This Unilateral Modification Is To Issue The Notice To Proceed (Ntp) And Establish The Period Of Performance Of March 3, 2020 Through August 30, 2020.
- Nasa Kennedy Space Center
- National Aeronautics And Space Administration (Nasa)
- $237,578.13
- National Aeronautics And Space Administration (Nasa)
- 80KSC019F0271
- Hazardous Waste Storage Building Repairs And Upgrades (Staging), Pcn 99293 Mod 3 Extends The Period Of Performance To Accommodate For Delays In The Review And Approval Of Site Specific Safety Plan And Delays.
- 21 Aug 2020
- Hazardous Waste Storage Building Repairs And Upgrades (Staging), Pcn 99293 Mod 3 Extends The Period Of Performance To Accommodate For Delays In The Review And Approval Of Site Specific Safety Plan And Delays.
- Nasa Kennedy Space Center
- National Aeronautics And Space Administration (Nasa)
- $143,200.00
- National Aeronautics And Space Administration (Nasa)