Znth, Inc.
Dba Zenith Construction
CAGE Code: 75CT5
NCAGE Code: 75CT5
Status: Active
Type: Commercial Supplier
Summary
Znth, Inc., Dba Zenith Construction is an Active Commercial Supplier with the Cage Code 75CT5.
Address
9440 Wheatlands Ct Ste 13
Santee CA 92071-2839
United States
Points of Contact
No Points of Contact...
Related Information
No Related Information...
People who viewed this 'CAGE Code' also viewed...
Sparks Auto Care Landmark Landscaping Infomarketing Aztec Business Machines Inc Brozo And Elliott Signs And More American Brake Supply Frederick Pump Co Washington George Rdc Construction Inc Brown And Associates L And M Underground Construction U S Advertec Engineering Inc South Bay Foundry Inc Rogers Supply Co Stat Pharmaceuticals, Inc Rayo Wholesale, Inc. Signature Sheet Metal, Inc Chula Vista Electric Co. United Glass Co Farina Teresa D
Frequently Asked Questions (FAQ) for CAGE 75CT5
- What is CAGE Code 75CT5?
- 75CT5 is the unique identifier used by NATO Organizations to reference the physical entity known as Znth, Inc. Dba Zenith Construction located at 9440 Wheatlands Ct Ste 13, Santee CA 92071-2839, United States.
- Who is CAGE Code 75CT5?
- 75CT5 refers to Znth, Inc. Dba Zenith Construction located at 9440 Wheatlands Ct Ste 13, Santee CA 92071-2839, United States.
- Where is CAGE Code 75CT5 Located?
- CAGE Code 75CT5 is located in Santee, CA, USA.
Contracting History for CAGE 75CT5 Most Recent 25 Records
- 12905B23P0268
- Construction For One Metal Building And One Metal Carport Type Structure.
- 20 Sep 2023
- Construction For One Metal Building And One Metal Carport Type Structure.
- Usda Ars Pwa Aao Acq/Per Prop
- Department Of Agriculture (Usda)
- $53,500.85
- Department Of Agriculture (Usda)
- 12905B23P0262
- Additional Leveling And Blue Rock Removal.
- 20 Dec 2023
- Additional Leveling And Blue Rock Removal.
- Usda Ars Pwa Aao Acq/Per Prop
- Department Of Agriculture (Usda)
- $35,083.22
- Department Of Agriculture (Usda)
- 12905B23P0262
- Construction Of Concrete Slab
- 14 Sep 2023
- Construction Of Concrete Slab
- Usda Ars Pwa Aao Acq/Per Prop
- Department Of Agriculture (Usda)
- $27,283.22
- Department Of Agriculture (Usda)
- 127EAW23C0030
- 127Eaw23c0030 - Henshaw Fire Station Residence Reroof
- 25 Jul 2023
- 127Eaw23c0030 - Henshaw Fire Station Residence Reroof
- Usda-Fs, Csa Southwest 6
- Department Of Agriculture (Usda)
- $57,652.04
- Department Of Agriculture (Usda)
- N6600123P6330
- Inspect, Repair, Report 4 Hvac Units San Clemente Island
- 13 Jul 2023
- Inspect, Repair, Report 4 Hvac Units San Clemente Island
- Niwc Pacific
- Department Of Defense (Dod)
- $4,750.00
- Department Of Defense (Dod)
- 697DCK23C00324
- Replace Drain & Vent Lines In Administration & Automation Wing Of Zoa Clean And Reline 6-Inch Sewer Pipe Serving Zoa Automation Wing. Replace 4-Inch Drainpipe Serving First Floor Hvac Condensation In Automation Wing. Replace 4-Inch Vent Pi
- 16 Aug 2023
- Replace Drain & Vent Lines In Administration & Automation Wing Of Zoa Clean And Reline 6-Inch Sewer Pipe Serving Zoa Automation Wing. Replace 4-Inch Drainpipe Serving First Floor Hvac Condensation In Automation Wing. Replace 4-Inch Vent Pi
- 697Dck Regional Acquisitions Svcs
- Department Of Transportation (Dot)
- $159,576.35
- Department Of Transportation (Dot)
- 697DCK22C00283
- Modification 0002 Is To Replace Eight (8) Portable Potties With Two (2) 4-Station Restroom Trailers And Remove Four (4) Handwashing Stations From The Original Contingency Plan For Domestic Water Shutdown (Thirteen (13) Portable Potties And Eight (8)
- 19 Oct 2022
- Modification 0002 Is To Replace Eight (8) Portable Potties With Two (2) 4-Station Restroom Trailers And Remove Four (4) Handwashing Stations From The Original Contingency Plan For Domestic Water Shutdown (Thirteen (13) Portable Potties And Eight (8)
- 697Dck Regional Acquisitions Svcs
- Department Of Transportation (Dot)
- $164,321.16
- Department Of Transportation (Dot)
- 697DCK22C00283
- Modification 0001 Issued To Establish The Period Of Performance As 10/3/2022 To 11/3/2022. No Other Changes Are Associated With This Modification. Cope Of Work: The Work To Be Performed Is For All Of The Vitrified Clay Pipe (Vcp) From The Main B
- 15 Sep 2022
- Modification 0001 Issued To Establish The Period Of Performance As 10/3/2022 To 11/3/2022. No Other Changes Are Associated With This Modification. Cope Of Work: The Work To Be Performed Is For All Of The Vitrified Clay Pipe (Vcp) From The Main B
- 697Dck Regional Acquisitions Svcs
- Department Of Transportation (Dot)
- $152,044.08
- Department Of Transportation (Dot)