Vucon, Llc
Dba Vucon Llc
CAGE Code: 6DZ53
NCAGE Code: 6DZ53
Status: Active
Type: Commercial Supplier
Dun & Bradstreet (DUNS): 968305123
Summary
Vucon, Llc, Dba Vucon Llc is an Active Commercial Supplier with the Cage Code 6DZ53 and is tracked by Dun & Bradstreet under DUNS Number 968305123..
Address
527 N Hollywood St
Memphis TN 38112-2598
United States
Points of Contact
No Points of Contact...
Related Information
People who viewed this 'CAGE Code' also viewed...
The Safest Way, Llc B&W Engineering Labratories Inc. Big River Instruments Inc Automotive Electric Corporation Omega General Contractors Inc. Memphis Metropolitan Land Bank Desser Tire & Rubber Co., Llc Browning-Ferris Industries Health Alpha Reporting Corp Alarmcraft 2.0 Llc Jey Enterprises Cummins Inc Fisher Research Inc Perma-Fix Environmental Services Relationship Unleashed Walter Palazola Produce Co Inc. Personal Safety First Williams E F And Associates Inc Medtronic Sofamor Danek Usa, Inc Conexus Corp
Frequently Asked Questions (FAQ) for CAGE 6DZ53
- What is CAGE Code 6DZ53?
- 6DZ53 is the unique identifier used by NATO Organizations to reference the physical entity known as Vucon, Llc Dba Vucon Llc located at 527 N Hollywood St, Memphis TN 38112-2598, United States.
- Who is CAGE Code 6DZ53?
- 6DZ53 refers to Vucon, Llc Dba Vucon Llc located at 527 N Hollywood St, Memphis TN 38112-2598, United States.
- Where is CAGE Code 6DZ53 Located?
- CAGE Code 6DZ53 is located in Memphis, TN, USA.
Contracting History for CAGE 6DZ53 Most Recent 25 Records
- W912EQ23C0005
- Farrenburg Phase 7
- 15 Feb 2023
- Farrenburg Phase 7
- W07v Endist Memphis
- Department Of Defense (Dod)
- $1,343,523.17
- Department Of Defense (Dod)
- W912EQ23C0005
- This Modification Is Necessary To Correct The Inadvertent Mistake To Require The Removal Of Haul Road In The Contract Specifications Section 01 22 00.00 11, Part 1 General, Paragraph 1.1.4 To Match The Agreement With The Landowner.
- 23 May 2023
- This Modification Is Necessary To Correct The Inadvertent Mistake To Require The Removal Of Haul Road In The Contract Specifications Section 01 22 00.00 11, Part 1 General, Paragraph 1.1.4 To Match The Agreement With The Landowner.
- W07v Endist Memphis
- Department Of Defense (Dod)
- $1,343,523.17
- Department Of Defense (Dod)
- W912EQ23C0005
- This Modification Provides For Extension To The Existing Culvert At Cr 707 To Add Necessary Length To Provide Proper Slopes To Construct The Radius Needed For Truck And Trailer Traffic.
- 14 Sep 2023
- This Modification Provides For Extension To The Existing Culvert At Cr 707 To Add Necessary Length To Provide Proper Slopes To Construct The Radius Needed For Truck And Trailer Traffic.
- W07v Endist Memphis
- Department Of Defense (Dod)
- $1,350,408.56
- Department Of Defense (Dod)
- W912EK21C0012
- Illinois River Basin, Wagonseller Road Bridge Tazewell County, Il Emergency Streambank Stabilization. The Contract Is Awarded At This Time.
- 10 Nov 2020
- Illinois River Basin, Wagonseller Road Bridge Tazewell County, Il Emergency Streambank Stabilization. The Contract Is Awarded At This Time.
- W07v Endist Rock Island
- Department Of Defense (Dod)
- $1,826,498.75
- Department Of Defense (Dod)
- W912EK21C0012
- Illiniois River Basin, Wagonseller Road Bridge Emergency Streambank Stabilization. The Reason For This Mod Is To Set The Contract Completion Date Of 06 June 2021 Based On The Contractor's Acknowledged Ntp Dated 08 December 2020.
- 16 Dec 2020
- Illiniois River Basin, Wagonseller Road Bridge Emergency Streambank Stabilization. The Reason For This Mod Is To Set The Contract Completion Date Of 06 June 2021 Based On The Contractor's Acknowledged Ntp Dated 08 December 2020.
- W07v Endist Rock Island
- Department Of Defense (Dod)
- $1,778,815.00
- Department Of Defense (Dod)
- W912EK21C0012
- Contract For Wagonseller Road Bridge Emergency Streambank Stabilization At Tazewell County, Illinois. Reference No. R00006. The Reason For This Modification Is To Extend The Lpstp Upstream 100Ft On The East Side And Reinforce Stream Barbs 1,2, And 3.
- 1 Dec 2021
- Contract For Wagonseller Road Bridge Emergency Streambank Stabilization At Tazewell County, Illinois. Reference No. R00006. The Reason For This Modification Is To Extend The Lpstp Upstream 100Ft On The East Side And Reinforce Stream Barbs 1,2, And 3.
- W07v Endist Rock Island
- Department Of Defense (Dod)
- $1,783,447.21
- Department Of Defense (Dod)
- W912EK21C0012
- Illinois River Basin, Wagonseller Road Bridge Emergency Streambank Stabilization. The Reason For This Modification Is To Make Changes To Section 01 35 26 And Section 01 45 04. All Other Terms And Conditions Remain Unchanged.
- 25 Jan 2021
- Illinois River Basin, Wagonseller Road Bridge Emergency Streambank Stabilization. The Reason For This Modification Is To Make Changes To Section 01 35 26 And Section 01 45 04. All Other Terms And Conditions Remain Unchanged.
- W07v Endist Rock Island
- Department Of Defense (Dod)
- $1,778,815.00
- Department Of Defense (Dod)
- W912EK21C0012
- Wagonseller Road Bridge Emergency Stabilization At Tazewell County, Il. The Reason For This Modification Is For Riprap Alignment Shift Due To Erosion And Time Extension.
- 28 Jul 2021
- Wagonseller Road Bridge Emergency Stabilization At Tazewell County, Il. The Reason For This Modification Is For Riprap Alignment Shift Due To Erosion And Time Extension.
- W07v Endist Rock Island
- Department Of Defense (Dod)
- $1,768,022.22
- Department Of Defense (Dod)
- W912EK21C0012
- Contract For Wagonseller Road Bridge Emergency Streambank Stabilization Tazewell County, Illinois R00002 Reason For Modification Is For A Time Extension For Due To Weather And High Water.
- 4 Jun 2021
- Contract For Wagonseller Road Bridge Emergency Streambank Stabilization Tazewell County, Illinois R00002 Reason For Modification Is For A Time Extension For Due To Weather And High Water.
- W07v Endist Rock Island
- Department Of Defense (Dod)
- $1,768,022.22
- Department Of Defense (Dod)
- W912BV21C0009
- Fall River Lake- Repair Badger Creek Rd
- 25 May 2021
- Fall River Lake- Repair Badger Creek Rd
- Us Army Engineer District Tulsa
- Department Of Defense (Dod)
- $1,824,966.10
- Department Of Defense (Dod)
- W912BV21C0009
- Fall River Lake- Repair Badger Creek Rd
- 8 Jul 2021
- Fall River Lake- Repair Badger Creek Rd
- Us Army Engineer District Tulsa
- Department Of Defense (Dod)
- $1,824,966.10
- Department Of Defense (Dod)
- W912EQ20C0015
- This Modification Is To Revise The Estimated Quantities To Reflect The Actual Quantities Used For The Project. This Modification Is For Funding And Payment Purposes And Does Not Change The Substantive Rights Of The Contracting Parties.
- 9 Feb 2021
- This Modification Is To Revise The Estimated Quantities To Reflect The Actual Quantities Used For The Project. This Modification Is For Funding And Payment Purposes And Does Not Change The Substantive Rights Of The Contracting Parties.
- W07v Endist Memphis
- Department Of Defense (Dod)
- $1,279,383.50
- Department Of Defense (Dod)
- W912EQ20C0015
- This Engineering Change Is Necessary To Control Ground Water Infiltration Under The Culvert 17 Outlet Structure.
- 24 Aug 2021
- This Engineering Change Is Necessary To Control Ground Water Infiltration Under The Culvert 17 Outlet Structure.
- W07v Endist Memphis
- Department Of Defense (Dod)
- $1,292,383.50
- Department Of Defense (Dod)
- W912EQ20C0015
- Farrenburg Phase 5
- 30 Aug 2020
- Farrenburg Phase 5
- W07v Endist Memphis
- Department Of Defense (Dod)
- $1,277,986.80
- Department Of Defense (Dod)
- W912EQ20C0015
- This Modification Is Removing The Existing Drainage Pipes In The Field Adjacent To Culvert 17. This Modification To The Contract Is Necessary To Revise The Estimated Quantities To Reflect The Actual Quantities Utilized To Complete The Specified Work.
- 4 Feb 2022
- This Modification Is Removing The Existing Drainage Pipes In The Field Adjacent To Culvert 17. This Modification To The Contract Is Necessary To Revise The Estimated Quantities To Reflect The Actual Quantities Utilized To Complete The Specified Work.
- W07v Endist Memphis
- Department Of Defense (Dod)
- $1,277,986.80
- Department Of Defense (Dod)
- N6945020C8012
- Base Bid
- 20 Feb 2020
- Base Bid
- Navfacengsyscom Southeast
- Department Of Defense (Dod)
- $482,388.00
- Department Of Defense (Dod)
- W912EQ19C0005
- Excavation
- 31 May 2019
- Excavation
- W07v Endist Memphis
- Department Of Defense (Dod)
- $3,832,671.59
- Department Of Defense (Dod)
- W912EQ19C0005
- Veq Mod
- 4 Nov 2020
- Veq Mod
- W07v Endist Memphis
- Department Of Defense (Dod)
- $3,832,671.59
- Department Of Defense (Dod)
- W912EQ19C0005
- Excavation
- 1 Sep 2020
- Excavation
- W07v Endist Memphis
- Department Of Defense (Dod)
- $3,833,514.77
- Department Of Defense (Dod)
- W912EQ19C0005
- Clay Gravel Mod
- 27 Nov 2019
- Clay Gravel Mod
- W07v Endist Memphis
- Department Of Defense (Dod)
- $3,781,794.65
- Department Of Defense (Dod)
- W912EQ19C0005
- Final Veq Mod
- 7 Jan 2021
- Final Veq Mod
- W07v Endist Memphis
- Department Of Defense (Dod)
- $3,832,671.59
- Department Of Defense (Dod)
- W912EQ19C0005
- Pizometer Mod
- 30 Oct 2019
- Pizometer Mod
- W07v Endist Memphis
- Department Of Defense (Dod)
- $3,781,794.65
- Department Of Defense (Dod)
- W912EQ19C0005
- Equitable Adjustment
- 4 Aug 2020
- Equitable Adjustment
- W07v Endist Memphis
- Department Of Defense (Dod)
- $3,781,794.65
- Department Of Defense (Dod)
- W912EQ19C0005
- Excusable Delays Time Extension
- 27 May 2020
- Excusable Delays Time Extension
- W07v Endist Memphis
- Department Of Defense (Dod)
- $3,781,794.65
- Department Of Defense (Dod)
- N6945019P8011
- Replace Usar Primeter Fence And Gates
- 17 Apr 2019
- Replace Usar Primeter Fence And Gates
- Navfac Southeast
- Department Of Defense (Dod)
- $245,429.97
- Department Of Defense (Dod)