Pace-Amtex Jv, Llc
Dba Pace-Amtex Jv Llc
CAGE Code: 6DXK4
NCAGE Code: 6DXK4
Status: Active
Type: Commercial Supplier
Dun & Bradstreet (DUNS): 967548657
Summary
Pace-Amtex Jv, Llc, Dba Pace-Amtex Jv Llc is an Active Commercial Supplier with the Cage Code 6DXK4 and is tracked by Dun & Bradstreet under DUNS Number 967548657..
Address
136 Old San Antonio Rd
Ste 106
Boerne TX 78006-3338
United States
Points of Contact
No Points of Contact...
Related Information
People who viewed this 'CAGE Code' also viewed...
Organizational Design Inc Greystone Industries Ltd Parks And Associates San Antonio Transcription Inc Megha Services R & R Tractor And Equipment Ltd M5 Utilities, Llc Glassock Robert R Contractor Cyclops Electronics Inc Aire Drone Systems Llc Black Sail Innovations Llc The Playwell Group, Inc. Fm Systems South Texas General Services Llc Powermatic Systems Inc Odessa Pumps And Equipment Inc Finance Lab, Llc Atkins And Fly Inc Casante, Inc Interstate Batteries Hill Country
Frequently Asked Questions (FAQ) for CAGE 6DXK4
- What is CAGE Code 6DXK4?
- 6DXK4 is the unique identifier used by NATO Organizations to reference the physical entity known as Pace-Amtex Jv, Llc Dba Pace-Amtex Jv Llc located at 136 Old San Antonio Rd, Ste 106, Boerne TX 78006-3338, United States.
- Who is CAGE Code 6DXK4?
- 6DXK4 refers to Pace-Amtex Jv, Llc Dba Pace-Amtex Jv Llc located at 136 Old San Antonio Rd, Ste 106, Boerne TX 78006-3338, United States.
- Where is CAGE Code 6DXK4 Located?
- CAGE Code 6DXK4 is located in Boerne, TX, USA.
Contracting History for CAGE 6DXK4 Most Recent 25 Records
- FA466122F0039
- - Add 14-0061 Fuel Cell Work De-Scope Of Water Detail Work And Installation Of 22Ga Steel Sheet Sheathing. 2. Extend The Pop By 120 Days Due To Long Material Lead Time. The Pop Changed From 30 Sep 2022 - 24 Nov 2023 To 30 Sep 2022 - 23 Mar 2024.
- 1 Feb 2023
- - Add 14-0061 Fuel Cell Work De-Scope Of Water Detail Work And Installation Of 22Ga Steel Sheet Sheathing. 2. Extend The Pop By 120 Days Due To Long Material Lead Time. The Pop Changed From 30 Sep 2022 - 24 Nov 2023 To 30 Sep 2022 - 23 Mar 2024.
- Fa4661 7 Cons Cd
- Department Of Defense (Dod)
- $2,943,500.00
- Department Of Defense (Dod)
- FA466122F0038
- The Purpose Of The Mod Is To Update The Start Date To Match Ntp And To Add 120 Days To The Pop Due To Long Lead Times. The Pop Has Changed From 1 Sep 22 - 7 Sep 23 To Now Read 7 Sep 22 - 5 Jan 24.
- 13 Feb 2023
- The Purpose Of The Mod Is To Update The Start Date To Match Ntp And To Add 120 Days To The Pop Due To Long Lead Times. The Pop Has Changed From 1 Sep 22 - 7 Sep 23 To Now Read 7 Sep 22 - 5 Jan 24.
- Fa4661 7 Cons Cd
- Department Of Defense (Dod)
- $2,225,550.00
- Department Of Defense (Dod)
- FA466122F0039
- Construct/Rpr Changing Area Bldg, 5105
- 27 Jul 2022
- Construct/Rpr Changing Area Bldg, 5105
- Fa4661 7 Cons Cd
- Department Of Defense (Dod)
- $2,943,500.00
- Department Of Defense (Dod)
- FA466122F0038
- Construct Changing Area Bldg 4315
- 29 Jul 2022
- Construct Changing Area Bldg 4315
- Fa4661 7 Cons Cd
- Department Of Defense (Dod)
- $2,225,550.00
- Department Of Defense (Dod)
- FA466122F0039
- Construct/Rpr Changing Area Bldg, 5105
- 5 Jul 2023
- Construct/Rpr Changing Area Bldg, 5105
- Fa4661 7 Cons Cd
- Department Of Defense (Dod)
- $2,943,500.00
- Department Of Defense (Dod)
- FA466122F0001
- Extend Pop And To Include 'Option 2', Replacing The Beam Of The Guard Mount 101 Structure Support Fix, And Adding Tiktok Clause.
- 11 Sep 2023
- Extend Pop And To Include 'Option 2', Replacing The Beam Of The Guard Mount 101 Structure Support Fix, And Adding Tiktok Clause.
- Fa4661 7 Cons Cd
- Department Of Defense (Dod)
- $7,453,150.00
- Department Of Defense (Dod)
- FA466122F0001
- Extend Pop And Attached Revised Sow.
- 30 Aug 2022
- Extend Pop And Attached Revised Sow.
- Fa4661 7 Cons Cd
- Department Of Defense (Dod)
- $7,453,150.00
- Department Of Defense (Dod)
- FA466122F0001
- Consolidate Sfs Bldg, 7232
- 12 Nov 2021
- Consolidate Sfs Bldg, 7232
- Fa4661 7 Cons Cd
- Department Of Defense (Dod)
- $7,453,150.00
- Department Of Defense (Dod)
- FA466121P0010
- Repair Storm Damage To Chapel Bldg 6220
- 9 Jun 2021
- Repair Storm Damage To Chapel Bldg 6220
- Fa4661 7 Cons Cd
- Department Of Defense (Dod)
- $531,603.69
- Department Of Defense (Dod)
- FA466121P0010
- Renotave Chapel Bldg 6220
- 25 Jan 2021
- Renotave Chapel Bldg 6220
- Fa4661 7 Cons Cd
- Department Of Defense (Dod)
- $615,767.13
- Department Of Defense (Dod)
- FA466121P0010
- The Purpose Of This Modification Is To Add Funding For The Replacement Of The Carpet And Pews The Surety Has Paid For Since The Previous Contractor Damaged The Materials.
- 1 Apr 2022
- The Purpose Of This Modification Is To Add Funding For The Replacement Of The Carpet And Pews The Surety Has Paid For Since The Previous Contractor Damaged The Materials.
- Fa4661 7 Cons Cd
- Department Of Defense (Dod)
- $615,767.13
- Department Of Defense (Dod)
- FA466121P0010
- The Purpose Of This Modification Is To Add Additional Funds For The New Contractor To Re-Upholster The Damaged Pews.
- 30 Aug 2022
- The Purpose Of This Modification Is To Add Additional Funds For The New Contractor To Re-Upholster The Damaged Pews.
- Fa4661 7 Cons Cd
- Department Of Defense (Dod)
- $615,767.13
- Department Of Defense (Dod)
- FA466121P0010
- Repair Chapel: A-Extend Pop 30D Ays Due To Weather Delays, Carpet Chg& Back Order Delay. Updated Pop Is 30 Jul 21 To 30 Aug 21.
- 17 Aug 2021
- Repair Chapel: A-Extend Pop 30D Ays Due To Weather Delays, Carpet Chg& Back Order Delay. Updated Pop Is 30 Jul 21 To 30 Aug 21.
- Fa4661 7 Cons Cd
- Department Of Defense (Dod)
- $531,603.69
- Department Of Defense (Dod)
- FA466121F0012
- Award Of Seed Project, Reno Bldg 6030
- 2 Dec 2020
- Award Of Seed Project, Reno Bldg 6030
- Fa4661 7 Cons Cd
- Department Of Defense (Dod)
- $5,336,506.00
- Department Of Defense (Dod)
- FA466121F0012
- Reno Bldg 6030.
- 26 Jan 2023
- Reno Bldg 6030.
- Fa4661 7 Cons Cd
- Department Of Defense (Dod)
- $5,865,465.65
- Department Of Defense (Dod)
- FA466121F0012
- Award Of Seed Project, Reno Bldg 6030
- 26 May 2023
- Award Of Seed Project, Reno Bldg 6030
- Fa4661 7 Cons Cd
- Department Of Defense (Dod)
- $6,177,125.22
- Department Of Defense (Dod)
- FA466121F0012
- 5 Additional Months Of Furniture Storage.
- 28 Sep 2023
- 5 Additional Months Of Furniture Storage.
- Fa4661 7 Cons Cd
- Department Of Defense (Dod)
- $6,189,132.13
- Department Of Defense (Dod)
- FA466120F0048
- Repair Control Tower Bldg. 4300 No Cost Cancellation Agreed To By Both Parties.
- 13 May 2020
- Repair Control Tower Bldg. 4300 No Cost Cancellation Agreed To By Both Parties.
- Fa4661 7 Cons Cd
- Department Of Defense (Dod)
- $0.00
- Department Of Defense (Dod)
- FA466120F0048
- Repair Control Tower Bldg. 4300
- 8 May 2020
- Repair Control Tower Bldg. 4300
- Fa4661 7 Cons Cd
- Department Of Defense (Dod)
- $0.00
- Department Of Defense (Dod)
- FA466120F0052
- Repair Control Tower
- 13 May 2020
- Repair Control Tower
- Fa4661 7 Cons Cd
- Department Of Defense (Dod)
- $2,833,800.00
- Department Of Defense (Dod)
- FA466120F0052
- Repair Control Tower - Revised Sow, Specification, Designs, Drawings And Additional Funding Will Increase The Contract Value By $171,938.94. This Increases The Contract Total Award Amount From $2,833,800.00 To $3,005,738.94.
- 30 Aug 2021
- Repair Control Tower - Revised Sow, Specification, Designs, Drawings And Additional Funding Will Increase The Contract Value By $171,938.94. This Increases The Contract Total Award Amount From $2,833,800.00 To $3,005,738.94.
- Fa4661 7 Cons Cd
- Department Of Defense (Dod)
- $3,005,738.94
- Department Of Defense (Dod)
- FA466120F0052
- Additional Work* Modify Break Room To Add Nursing And Lactation Room
- 27 Jun 2022
- Additional Work* Modify Break Room To Add Nursing And Lactation Room
- Fa4661 7 Cons Cd
- Department Of Defense (Dod)
- $3,037,860.25
- Department Of Defense (Dod)
- FA466120F0052
- Repair Control Tower.
- 5 Apr 2023
- Repair Control Tower.
- Fa4661 7 Cons Cd
- Department Of Defense (Dod)
- $3,037,860.25
- Department Of Defense (Dod)
- FA466120F0052
- Repair Control Tower
- 11 Jul 2023
- Repair Control Tower
- Fa4661 7 Cons Cd
- Department Of Defense (Dod)
- $3,037,860.25
- Department Of Defense (Dod)
- FA466120F0052
- Control Tower Renovation-Lift The Suspension Of Work With The Following Extension Dates: 1. Develop Of 65% Design Commenced 21 Jun 21. 2. Add 106 Days To The The Design, New Pop Date 5 Nov 21. 3. Add 45 Days To Construction, New Pop Date 15 Mar 23.
- 12 Jul 2021
- Control Tower Renovation-Lift The Suspension Of Work With The Following Extension Dates: 1. Develop Of 65% Design Commenced 21 Jun 21. 2. Add 106 Days To The The Design, New Pop Date 5 Nov 21. 3. Add 45 Days To Construction, New Pop Date 15 Mar 23.
- Fa4661 7 Cons Cd
- Department Of Defense (Dod)
- $3,005,738.94
- Department Of Defense (Dod)