I & L Fms
CAGE Code: 68EN3
NCAGE Code: 68EN3
Status: Active
Type: Commercial Supplier
Dun & Bradstreet (DUNS): 966213188
Summary
I & L Fms is an Active Commercial Supplier with the Cage Code 68EN3 and is tracked by Dun & Bradstreet under DUNS Number 966213188..
Address
4435 Waterfront Dr Ste 202
Glen Allen VA 23060-3393
United States
Points of Contact
No Points of Contact...
Related Information
People who viewed this 'CAGE Code' also viewed...
Copper Key Group Llc Better Packages Sales And Service Alliant Global Strategies, Inc Great Oaks Corp Dba North American General Import & Export Service Llc Coeurage Enterprises Ltd Xpander Pak Inc Delta Medical Transport Inc Stop-N-Go Enterprises Inc Hydraulics Conteh & Brown Group Llc Deshazo & Son Roofing, Inc Logiss Llc Schnabel Engineering Associates Inc Global Maintenance Group Llc Computers And Business Systems Inc Inframap Corp Prince Edward Hotel Partners Llc Infopro Incorporated Bemiss Equipment Corp S And S Acoustics
Frequently Asked Questions (FAQ) for CAGE 68EN3
- What is CAGE Code 68EN3?
- 68EN3 is the unique identifier used by NATO Organizations to reference the physical entity known as I & L Fms located at 4435 Waterfront Dr Ste 202, Glen Allen VA 23060-3393, United States.
- Who is CAGE Code 68EN3?
- 68EN3 refers to I & L Fms located at 4435 Waterfront Dr Ste 202, Glen Allen VA 23060-3393, United States.
- Where is CAGE Code 68EN3 Located?
- CAGE Code 68EN3 is located in Glen Allen, VA, USA.
Contracting History for CAGE 68EN3 Most Recent 25 Records
- 47PG0323F0073
- The Contractor Shall Furnish All Necessary Labor, Material, Equipment, And Supervision To Replace Two 2 Duct Detectors And One Fire Alarm System Relay At The Thomas F. Eagleton U.S. Courthouse ,111 S. 10Th Street, St. Louis, Mo 63102-1125.
- 21 Sep 2023
- The Contractor Shall Furnish All Necessary Labor, Material, Equipment, And Supervision To Replace Two 2 Duct Detectors And One Fire Alarm System Relay At The Thomas F. Eagleton U.S. Courthouse ,111 S. 10Th Street, St. Louis, Mo 63102-1125.
- Pbs R6 Small Projects Acquisition St. Louis East
- General Services Administration (Gsa)
- $3,802.03
- General Services Administration (Gsa)
- 47PG0323F0074
- The Contractor Shall Furnish All Necessary Labor, Material, Equipment, And Supervision To Furnish And Replace The Controller For The Emergency Generators At The Thomas F. Eagleton U.S. Courthouse 111 South 10Th St, St Louis Mo 63102.
- 22 Sep 2023
- The Contractor Shall Furnish All Necessary Labor, Material, Equipment, And Supervision To Furnish And Replace The Controller For The Emergency Generators At The Thomas F. Eagleton U.S. Courthouse 111 South 10Th St, St Louis Mo 63102.
- Pbs R6
- General Services Administration (Gsa)
- $100,115.71
- General Services Administration (Gsa)
- 47PG0323F0070
- The Contractor Shall Furnish All Necessary Labor, Material, Equipment, And Supervision To Remove Wall Covering And Paint Walls In Employee Health Unit At The Thomas F. Eagleton U.S. Courthouse , 111 S. 10Th Street St. Louis, Mo 63102-1125.
- 12 Sep 2023
- The Contractor Shall Furnish All Necessary Labor, Material, Equipment, And Supervision To Remove Wall Covering And Paint Walls In Employee Health Unit At The Thomas F. Eagleton U.S. Courthouse , 111 S. 10Th Street St. Louis, Mo 63102-1125.
- Pbs R6 Small Projects Acquisition St. Louis East
- General Services Administration (Gsa)
- $5,944.97
- General Services Administration (Gsa)
- 47PG0323F0067
- The Contractor Shall Furnish All Necessary Labor, Material, Equipment, And Supervision To Rebuild Condenser Water Pump 3 At The Thomas F. Eagleton U.S. Courthouse 111 S. 10Th Street, St. Louis, Mo 63102-1125.
- 25 Oct 2023
- The Contractor Shall Furnish All Necessary Labor, Material, Equipment, And Supervision To Rebuild Condenser Water Pump 3 At The Thomas F. Eagleton U.S. Courthouse 111 S. 10Th Street, St. Louis, Mo 63102-1125.
- Pbs R6 Small Projects Acquisition St. Louis East
- General Services Administration (Gsa)
- $20,679.54
- General Services Administration (Gsa)
- 47PG0323F0067
- E Contractor Shall Furnish All Necessary Labor, Material, Equipment, And Supervision To Rebuild Condenser Water Pump 3 At The Thomas F. Eagleton U.S. Courthouse, 111 S. 10Th Street, St. Louis, Mo 63102-1125.
- 4 Jan 2024
- E Contractor Shall Furnish All Necessary Labor, Material, Equipment, And Supervision To Rebuild Condenser Water Pump 3 At The Thomas F. Eagleton U.S. Courthouse, 111 S. 10Th Street, St. Louis, Mo 63102-1125.
- Pbs R6 Small Projects Acquisition St. Louis East
- General Services Administration (Gsa)
- $20,679.54
- General Services Administration (Gsa)
- 47PG0323F0067
- The Contractor Shall Furnish All Necessary Labor, Material, Equipment, And Supervision To Rebuild Condenser Water Pump 3 At The Thomas F. Eagleton U.S. Courthouse.
- 29 Aug 2023
- The Contractor Shall Furnish All Necessary Labor, Material, Equipment, And Supervision To Rebuild Condenser Water Pump 3 At The Thomas F. Eagleton U.S. Courthouse.
- Pbs R6
- General Services Administration (Gsa)
- $7,698.44
- General Services Administration (Gsa)
- 47PG0323F0057
- The Contractor Shall Furnish All Necessary Labor, Material, Equipment, And Supervision To Perform Repairs To The East Main Lobby Entrance Rotating Door At The Thomas F. Eagleton U.S. Courthouse, 111 S. 10Th Street, St. Louis, Mo 63102-1125.
- 9 Aug 2023
- The Contractor Shall Furnish All Necessary Labor, Material, Equipment, And Supervision To Perform Repairs To The East Main Lobby Entrance Rotating Door At The Thomas F. Eagleton U.S. Courthouse, 111 S. 10Th Street, St. Louis, Mo 63102-1125.
- Pbs R6 Small Projects Acquisition St. Louis East
- General Services Administration (Gsa)
- $40,564.60
- General Services Administration (Gsa)
- 47PG0323F0053
- The Contractor Shall Furnish All Necessary Labor, Material, Equipment, And Supervision To Remove And Replace Shrubbery On The East Side And Adjust Mulch, At The Thomas F. Eagleton U.S. Courthouse 111 South 10Th St, St Louis Mo 63102.
- 30 Jul 2023
- The Contractor Shall Furnish All Necessary Labor, Material, Equipment, And Supervision To Remove And Replace Shrubbery On The East Side And Adjust Mulch, At The Thomas F. Eagleton U.S. Courthouse 111 South 10Th St, St Louis Mo 63102.
- Pbs R6
- General Services Administration (Gsa)
- $23,321.36
- General Services Administration (Gsa)
- 47PG0323F0054
- Repack Seals On Fire Pump 3, Replace The Backflow Preventer, Repair Damaged Fencing, And Repair Leaking Heat Exchanger At The Thomas F. Eagleton U.S. Courthouse, 111 S. 10Th Street, St. Louis, Mo 63102-1125.
- 31 Jul 2023
- Repack Seals On Fire Pump 3, Replace The Backflow Preventer, Repair Damaged Fencing, And Repair Leaking Heat Exchanger At The Thomas F. Eagleton U.S. Courthouse, 111 S. 10Th Street, St. Louis, Mo 63102-1125.
- Pbs R6 Small Projects Acquisition St. Louis East
- General Services Administration (Gsa)
- $38,538.26
- General Services Administration (Gsa)
- 47PG0323F0052
- The Contractor Shall Furnish All Necessary Labor, Material, Equipment, And Supervision To Repair And Replace Multiple Garage Lights At The Thomas F. Eagleton U.S. Courthouse.
- 24 Jul 2023
- The Contractor Shall Furnish All Necessary Labor, Material, Equipment, And Supervision To Repair And Replace Multiple Garage Lights At The Thomas F. Eagleton U.S. Courthouse.
- Pbs R6
- General Services Administration (Gsa)
- $34,354.45
- General Services Administration (Gsa)
- 47PG0323F0047
- The Contractor Shall Furnish All Necessary Labor, Material, Equipment, And Supervision To Repair The Fire Alarm System At The Thomas F. Eagleton U.S. Courthouse, 111 S. 10Th Street, St. Louis, Mo 63102-1125.
- 11 Jul 2023
- The Contractor Shall Furnish All Necessary Labor, Material, Equipment, And Supervision To Repair The Fire Alarm System At The Thomas F. Eagleton U.S. Courthouse, 111 S. 10Th Street, St. Louis, Mo 63102-1125.
- Pbs R6 Small Projects Acquisition St. Louis East
- General Services Administration (Gsa)
- $4,082.97
- General Services Administration (Gsa)
- 47PG0323F0049
- Replace, The Public Drinking Fountains With Combination Drinking Fountain/Bottle Filler On The 15Th Floor Lobby Area And Option For 5Th Floor Lobby At The Thomas F. Eagleton U.S. Courthouse 111 South 10Th St, St Louis Mo 63102.
- 14 Jul 2023
- Replace, The Public Drinking Fountains With Combination Drinking Fountain/Bottle Filler On The 15Th Floor Lobby Area And Option For 5Th Floor Lobby At The Thomas F. Eagleton U.S. Courthouse 111 South 10Th St, St Louis Mo 63102.
- Pbs R6
- General Services Administration (Gsa)
- $7,770.35
- General Services Administration (Gsa)
- 47PG0323F0048
- The Contractor Shall Furnish All Necessary Labor, Material, Equipment, And Supervision To Replace, Replace Chilled Water Pump 3, At The Thomas F. Eagleton U.S. Courthouse 111 South 10Th St, St Louis Mo 63102.
- 12 Jul 2023
- The Contractor Shall Furnish All Necessary Labor, Material, Equipment, And Supervision To Replace, Replace Chilled Water Pump 3, At The Thomas F. Eagleton U.S. Courthouse 111 South 10Th St, St Louis Mo 63102.
- Pbs R6
- General Services Administration (Gsa)
- $74,182.00
- General Services Administration (Gsa)
- 47PG0323F0041
- Install Audio/Visual System In The 24Th Floor General Services Administration Conference Room At The Thomas F. Eagleton U.S. Courthouse111 S. 10Th Street, St. Louis, Mo 63102-1125.
- 5 Jun 2023
- Install Audio/Visual System In The 24Th Floor General Services Administration Conference Room At The Thomas F. Eagleton U.S. Courthouse111 S. 10Th Street, St. Louis, Mo 63102-1125.
- Pbs R6
- General Services Administration (Gsa)
- $15,528.70
- General Services Administration (Gsa)
- 47PG0323F0042
- The Contractor Shall Furnish All Necessary Labor, Material, Equipment, And Supervision To Provide An Led Lighting Upgrade In Public Corridors At The Thomas F. Eagleton U.S. Courthouse.
- 7 Jun 2023
- The Contractor Shall Furnish All Necessary Labor, Material, Equipment, And Supervision To Provide An Led Lighting Upgrade In Public Corridors At The Thomas F. Eagleton U.S. Courthouse.
- Pbs R6
- General Services Administration (Gsa)
- $44,056.85
- General Services Administration (Gsa)
- 47PG0323F0038
- Provide Off Hour Heating And Air-Conditioning Monitoring And Repairs At The Thomas F. Eagleton U.S. Courthouse, 111 S. 10Th Street, St. Louis, Mo 63102-1125.
- 11 Oct 2023
- Provide Off Hour Heating And Air-Conditioning Monitoring And Repairs At The Thomas F. Eagleton U.S. Courthouse, 111 S. 10Th Street, St. Louis, Mo 63102-1125.
- Pbs R6 Small Projects Acquisition St. Louis East
- General Services Administration (Gsa)
- $9,035.92
- General Services Administration (Gsa)
- 47PG0323F0038
- Provide Overtime Mechanic For Chiller Operation And Maintenance At The Thomas F. Eagleton U.S. Courthouse, 111 S. 10Th Street, St. Louis, Mo 63102-1125.
- 16 May 2023
- Provide Overtime Mechanic For Chiller Operation And Maintenance At The Thomas F. Eagleton U.S. Courthouse, 111 S. 10Th Street, St. Louis, Mo 63102-1125.
- Pbs R6 Small Projects Acquisition St. Louis East
- General Services Administration (Gsa)
- $9,035.92
- General Services Administration (Gsa)
- 47PG0323F0032
- The Contractor Shall Furnish All Necessary Labor, Material, Equipment, And Supervision To Replace, Replace Chilled Water Pump, At The Thomas F. Eagleton U.S. Courthouse 111 South 10Th St, St Louis Mo 63102.
- 2 May 2023
- The Contractor Shall Furnish All Necessary Labor, Material, Equipment, And Supervision To Replace, Replace Chilled Water Pump, At The Thomas F. Eagleton U.S. Courthouse 111 South 10Th St, St Louis Mo 63102.
- Pbs R6
- General Services Administration (Gsa)
- $20,361.64
- General Services Administration (Gsa)
- 47PG0323F0037
- Replace Sinks In The First Floor Restrooms At The Thomas F. Eagleton U.S. Courthouse, 111 S. 10Th Street, St. Louis, Mo 63102-1125.
- 12 May 2023
- Replace Sinks In The First Floor Restrooms At The Thomas F. Eagleton U.S. Courthouse, 111 S. 10Th Street, St. Louis, Mo 63102-1125.
- Pbs R6
- General Services Administration (Gsa)
- $8,469.02
- General Services Administration (Gsa)
- 47PG0323F0027
- The Contractor Shall Furnish All Necessary Labor, Material, Equipment, And Supervision To Program New Phone Lines At The Thomas F. Eagleton U.S. Courthouse, 111 S. 10Th Street, St. Louis, Mo 63102-1125.
- 8 Aug 2023
- The Contractor Shall Furnish All Necessary Labor, Material, Equipment, And Supervision To Program New Phone Lines At The Thomas F. Eagleton U.S. Courthouse, 111 S. 10Th Street, St. Louis, Mo 63102-1125.
- Pbs R6
- General Services Administration (Gsa)
- $1,118.33
- General Services Administration (Gsa)
- 47PG0323F0027
- The Contractor Shall Furnish All Necessary Labor, Material, Equipment, And Supervision To Program New Phone Lines At The Thomas F. Eagleton U.S. Courthouse 111 S. 10Th Street, St. Louis, Mo 63102-1125.
- 11 Apr 2023
- The Contractor Shall Furnish All Necessary Labor, Material, Equipment, And Supervision To Program New Phone Lines At The Thomas F. Eagleton U.S. Courthouse 111 S. 10Th Street, St. Louis, Mo 63102-1125.
- Pbs R6
- General Services Administration (Gsa)
- $1,118.33
- General Services Administration (Gsa)
- 47PG0323F0018
- The Contractor Shall Furnish All Necessary Labor, Material, Equipment, And Supervision To Remove And Replace 1 Windowpane On The 24Th Floor, At The Thomas F. Eagleton U.S. Courthouse 111 South 10Th St, St Louis Mo 63102.
- 9 Mar 2023
- The Contractor Shall Furnish All Necessary Labor, Material, Equipment, And Supervision To Remove And Replace 1 Windowpane On The 24Th Floor, At The Thomas F. Eagleton U.S. Courthouse 111 South 10Th St, St Louis Mo 63102.
- Pbs R6
- General Services Administration (Gsa)
- $2,879.10
- General Services Administration (Gsa)
- 47PG0323F0022
- The Contractor Shall Furnish All Necessary Labor, Material, Equipment, And Supervision To Replace, All The Lights In The Conference Room On The 24Th Floor And 2 Dimming Switches At The Thomas F. Eagleton U.S. Courthouse.
- 24 Mar 2023
- The Contractor Shall Furnish All Necessary Labor, Material, Equipment, And Supervision To Replace, All The Lights In The Conference Room On The 24Th Floor And 2 Dimming Switches At The Thomas F. Eagleton U.S. Courthouse.
- Pbs R6
- General Services Administration (Gsa)
- $5,262.50
- General Services Administration (Gsa)
- 47PG0323F0016
- The Contractor Shall Furnish All Necessary Labor, Material, Equipment, And Supervision To Make Repairs To Install Cane Sensors, Variable Frequency Drivers, Dome Lights And Repair Floor Drains At The Thomas F. Eagleton U.S. Courthouse, 111 S. 10Th St.
- 24 Feb 2023
- The Contractor Shall Furnish All Necessary Labor, Material, Equipment, And Supervision To Make Repairs To Install Cane Sensors, Variable Frequency Drivers, Dome Lights And Repair Floor Drains At The Thomas F. Eagleton U.S. Courthouse, 111 S. 10Th St.
- Pbs R6
- General Services Administration (Gsa)
- $59,523.78
- General Services Administration (Gsa)
- 47PG0323F0010
- The Contractor Shall Furnish All Necessary Labor, Material, Equipment, And Supervision To Provide And Replace Six (6) Tree Rings At The Thomas F. Eagleton U.S. Courthouse.
- 6 Jun 2023
- The Contractor Shall Furnish All Necessary Labor, Material, Equipment, And Supervision To Provide And Replace Six (6) Tree Rings At The Thomas F. Eagleton U.S. Courthouse.
- Pbs R6
- General Services Administration (Gsa)
- $17,171.62
- General Services Administration (Gsa)