Precision Fabricating & Cleaning
Company, Inc.
CAGE Code: 66589
NCAGE Code: 66589
Status: Active
Type: Manufacturer
Dun & Bradstreet (DUNS): 010822153
Summary
Precision Fabricating & Cleaning, Company, Inc. is an Active Manufacturer with the Cage Code 66589 and is tracked by Dun & Bradstreet under DUNS Number 010822153..
Address
3975 E Railroad Ave
Cocoa FL 32926-5975
United States
Points of Contact
Related Information
People who viewed this 'CAGE Code' also viewed...
Barker & Williamson Johnston Atoll Services A Joint Southern Tape And Label A.B.C. Landclearing And Development, S & J Produceof Brevard Inc Space Coast Container Inc Far East Cycle Inc Sri Jalaram, Llc Beyel Brothers, Inc. Blue Quest Inc Dynamic Wheels And Tires Securitech Applied Global Technologies, Inc. Total Septic Inc Industrial Waste Service Inc Cullers And Nutter Inc Ellington Construction Co S P T Enterprises Framed Sensations Cocoa Heating And Air
Frequently Asked Questions (FAQ) for CAGE 66589
- What is CAGE Code 66589?
- 66589 is the unique identifier used by NATO Organizations to reference the physical entity known as Precision Fabricating & Cleaning Company, Inc. located at 3975 E Railroad Ave, Cocoa FL 32926-5975, United States.
- Who is CAGE Code 66589?
- 66589 refers to Precision Fabricating & Cleaning Company, Inc. located at 3975 E Railroad Ave, Cocoa FL 32926-5975, United States.
- Where is CAGE Code 66589 Located?
- CAGE Code 66589 is located in Cocoa, FL, USA.
- How Many NSNs Does CAGE Code 66589 Supply?
- CAGE Code 66589 has been assigned as an approved source for 2 NSNs (National Stock Numbers and NATO Stock Numbers).
Contracting History for CAGE 66589 Most Recent 25 Records
- 80KSC024DA009
- Fabrication And Incidental Installation Of Ground Support Equipment, Test Equipment, Ground Systems, And Other Hardware Necessary To Process Flight And Associated Hardware.
- 6 Dec 2023
- Fabrication And Incidental Installation Of Ground Support Equipment, Test Equipment, Ground Systems, And Other Hardware Necessary To Process Flight And Associated Hardware.
- Nasa Kennedy Space Center
- National Aeronautics And Space Administration (Nasa)
- $0.00
- National Aeronautics And Space Administration (Nasa)
- 80KSC023CA017
- Compressed Gas Trailer Parts At Kennedy Space Center, Fl.
- 27 Sep 2023
- Compressed Gas Trailer Parts At Kennedy Space Center, Fl.
- Nasa Kennedy Space Center
- National Aeronautics And Space Administration (Nasa)
- $455,130.00
- National Aeronautics And Space Administration (Nasa)
- 80KSC023F0067
- Fabrication Of Artemis Ii Landing And Recovery Tow Pins
- 24 Aug 2023
- Fabrication Of Artemis Ii Landing And Recovery Tow Pins
- Nasa Kennedy Space Center
- National Aeronautics And Space Administration (Nasa)
- $440,672.00
- National Aeronautics And Space Administration (Nasa)
- 80KSC023F0010
- Mobile Launcher 2 Orion Service Module Umbilical (Osmu)Fabrication. Revises Delivery Schedule, Final Completion Date Is Hereby Revised To May 30, 2024.
- 4 Dec 2023
- Mobile Launcher 2 Orion Service Module Umbilical (Osmu)Fabrication. Revises Delivery Schedule, Final Completion Date Is Hereby Revised To May 30, 2024.
- Nasa Kennedy Space Center
- National Aeronautics And Space Administration (Nasa)
- $4,741,381.71
- National Aeronautics And Space Administration (Nasa)
- 80KSC023F0010
- Mobile Launcher 2 Orion Service Module Umbilical (Osmu) Fabrication.
- 31 Oct 2022
- Mobile Launcher 2 Orion Service Module Umbilical (Osmu) Fabrication.
- Nasa Kennedy Space Center
- National Aeronautics And Space Administration (Nasa)
- $4,999,332.71
- National Aeronautics And Space Administration (Nasa)
- 80KSC023F0010
- Mobile Launcher 2 Orion Service Module Umbilical (Osmu) Fabrication. Mod 1: Incorporate Changes Associated With Proposals Z-001 - Z-004, And Z-006. Funding And Values Are Decreased Completion Date Remains Unchanged.
- 11 Aug 2023
- Mobile Launcher 2 Orion Service Module Umbilical (Osmu) Fabrication. Mod 1: Incorporate Changes Associated With Proposals Z-001 - Z-004, And Z-006. Funding And Values Are Decreased Completion Date Remains Unchanged.
- Nasa Kennedy Space Center
- National Aeronautics And Space Administration (Nasa)
- $4,741,381.71
- National Aeronautics And Space Administration (Nasa)
- 80KSC022F0033
- Cabin Air Supply Panel. Extending Completion Date From 5/15/23 To 7/24/23. All Other Terms And Conditions Remain Unchanged.
- 15 May 2023
- Cabin Air Supply Panel. Extending Completion Date From 5/15/23 To 7/24/23. All Other Terms And Conditions Remain Unchanged.
- Nasa Kennedy Space Center
- National Aeronautics And Space Administration (Nasa)
- $886,550.16
- National Aeronautics And Space Administration (Nasa)
- 80KSC022F0033
- Cabin Air Supply Panel (Casp) Fabrication. Incorporates Changes Associated With Casp Panel Cable Modifications.
- 25 Sep 2023
- Cabin Air Supply Panel (Casp) Fabrication. Incorporates Changes Associated With Casp Panel Cable Modifications.
- Nasa Kennedy Space Center
- National Aeronautics And Space Administration (Nasa)
- $912,427.98
- National Aeronautics And Space Administration (Nasa)
- 80KSC022F0033
- Cabin Air Supply Panel Fabrication
- 17 May 2022
- Cabin Air Supply Panel Fabrication
- Nasa Kennedy Space Center
- National Aeronautics And Space Administration (Nasa)
- $886,550.16
- National Aeronautics And Space Administration (Nasa)
- 80KSC022F0033
- Cabin Air Supply Panel (Casp) Fabrication. Incorporate Changes For Material Updates To The Casp. Increase Is In The Amount Of $13,025.88 For A Total Price Increase From $869,888 To $882,913.88.
- 17 Aug 2022
- Cabin Air Supply Panel (Casp) Fabrication. Incorporate Changes For Material Updates To The Casp. Increase Is In The Amount Of $13,025.88 For A Total Price Increase From $869,888 To $882,913.88.
- Nasa Kennedy Space Center
- National Aeronautics And Space Administration (Nasa)
- $886,550.16
- National Aeronautics And Space Administration (Nasa)
- 80KSC022F0033
- Cabin Air Supply Panel Mod 2. Incorporate Changes For Updates In The Amount Of $3,636.28 For A Total Price Increase From $882,913.88 To $886,550.16. The Completion Date Remains 5/15/23.
- 12 Dec 2022
- Cabin Air Supply Panel Mod 2. Incorporate Changes For Updates In The Amount Of $3,636.28 For A Total Price Increase From $882,913.88 To $886,550.16. The Completion Date Remains 5/15/23.
- Nasa Kennedy Space Center
- National Aeronautics And Space Administration (Nasa)
- $886,550.16
- National Aeronautics And Space Administration (Nasa)
- 80KSC022F0033
- Extend Period Of Performance To 1/19/2024
- 5 Dec 2023
- Extend Period Of Performance To 1/19/2024
- Nasa Kennedy Space Center
- National Aeronautics And Space Administration (Nasa)
- $912,427.98
- National Aeronautics And Space Administration (Nasa)
- 80KSC022F0033
- Cabin Air Supply Panel Fabrication, Test And Delivery. Modification 4 Is To Incorporate Changes As A Result Of Rfi-027, For Associated Corrections To Nasa Design.
- 19 Jul 2023
- Cabin Air Supply Panel Fabrication, Test And Delivery. Modification 4 Is To Incorporate Changes As A Result Of Rfi-027, For Associated Corrections To Nasa Design.
- Nasa Kennedy Space Center
- National Aeronautics And Space Administration (Nasa)
- $898,810.92
- National Aeronautics And Space Administration (Nasa)
- 80KSC022F0002
- Launch Pad Element (Lpe) Liquid Nitrogen (Ln2) Skid Fabrication. Incorporates Changes For An Additional $18,330.31 And Extends Completion Date To August 21, 2023.
- 23 Aug 2022
- Launch Pad Element (Lpe) Liquid Nitrogen (Ln2) Skid Fabrication. Incorporates Changes For An Additional $18,330.31 And Extends Completion Date To August 21, 2023.
- Nasa Kennedy Space Center
- National Aeronautics And Space Administration (Nasa)
- $4,538,225.03
- National Aeronautics And Space Administration (Nasa)
- 80KSC022F0002
- Launch Pad Element (Lpe) Liquid Nitrogen (Ln2) Skid Fabrication. Incorporates Changes For An Additional $33,459.37 And Extends Final Delivery Date To July 26, 2023.
- 11 May 2022
- Launch Pad Element (Lpe) Liquid Nitrogen (Ln2) Skid Fabrication. Incorporates Changes For An Additional $33,459.37 And Extends Final Delivery Date To July 26, 2023.
- Nasa Kennedy Space Center
- National Aeronautics And Space Administration (Nasa)
- $4,519,894.72
- National Aeronautics And Space Administration (Nasa)
- 80KSC022F0002
- Launch Pad Element (Lpe) Liquid Nitrogen (Ln2) Skid Fabrication. Modification To Incorporate Changes Identified In Proposals Z-006, Z007a And Z-008. Completion Date Is Extended To November 21, 2023.
- 23 Mar 2023
- Launch Pad Element (Lpe) Liquid Nitrogen (Ln2) Skid Fabrication. Modification To Incorporate Changes Identified In Proposals Z-006, Z007a And Z-008. Completion Date Is Extended To November 21, 2023.
- Nasa Kennedy Space Center
- National Aeronautics And Space Administration (Nasa)
- $4,572,989.67
- National Aeronautics And Space Administration (Nasa)
- 80KSC022F0002
- Launch Pad Element (Lpe) Liquid Nitrogen (Ln2) Skid Fabrication. Modification Extends Completion Date To May 31, 2023.
- 21 Dec 2023
- Launch Pad Element (Lpe) Liquid Nitrogen (Ln2) Skid Fabrication. Modification Extends Completion Date To May 31, 2023.
- Nasa Kennedy Space Center
- National Aeronautics And Space Administration (Nasa)
- $4,572,989.67
- National Aeronautics And Space Administration (Nasa)
- 80KSC022F0002
- Launch Pad Element (Lpe) Liquid Nitrogen (Ln2) Skid Fabrication
- 2 Nov 2021
- Launch Pad Element (Lpe) Liquid Nitrogen (Ln2) Skid Fabrication
- Nasa Kennedy Space Center
- National Aeronautics And Space Administration (Nasa)
- $4,486,435.35
- National Aeronautics And Space Administration (Nasa)
- 80KSC021F0178
- Gaseous Nitrogen(Gn2)/Breathing Air (Bair) Panel Fabrication, Build, And Verification Testing. Mod 1: Incorporate Changes For Drawing Revisions To The Crew Crew Access Arm (Caa) Gaseous Nitrogen (Gn2) And Breathing Air (Bair) Panels.
- 2 Nov 2021
- Gaseous Nitrogen(Gn2)/Breathing Air (Bair) Panel Fabrication, Build, And Verification Testing. Mod 1: Incorporate Changes For Drawing Revisions To The Crew Crew Access Arm (Caa) Gaseous Nitrogen (Gn2) And Breathing Air (Bair) Panels.
- Nasa Kennedy Space Center
- National Aeronautics And Space Administration (Nasa)
- $308,511.78
- National Aeronautics And Space Administration (Nasa)
- 80KSC021F0178
- Gaseous Nitrogen(Gn2)/Breathing Air (Bair) Panel Fabrication, Build, And Verification Testing. Incorporates Rev B Updates To Statement Of Work.
- 16 Nov 2022
- Gaseous Nitrogen(Gn2)/Breathing Air (Bair) Panel Fabrication, Build, And Verification Testing. Incorporates Rev B Updates To Statement Of Work.
- Nasa Kennedy Space Center
- National Aeronautics And Space Administration (Nasa)
- $320,194.78
- National Aeronautics And Space Administration (Nasa)
- 80KSC021F0178
- Gaseous Nitrogen(Gn2)/Breathing Air (Bair) Panel Fabrication, Build, And Verification Testing. Mod 2: Incorporate Updates To The Crew, Crew Access Arm (Caa), Gaseous Nitrogen (Gn2), And Breathing Air (Bair) Panels Statement Of Work (Sow).
- 5 Nov 2021
- Gaseous Nitrogen(Gn2)/Breathing Air (Bair) Panel Fabrication, Build, And Verification Testing. Mod 2: Incorporate Updates To The Crew, Crew Access Arm (Caa), Gaseous Nitrogen (Gn2), And Breathing Air (Bair) Panels Statement Of Work (Sow).
- Nasa Kennedy Space Center
- National Aeronautics And Space Administration (Nasa)
- $320,194.78
- National Aeronautics And Space Administration (Nasa)
- 80KSC021F0178
- Gaseous Nitrogen(Gn2)/Breathing Air (Bair) Panel Fabrication, Build And Verification Testing. The Period Of Performance Is Extended From 5/31/22 To 7/15/22. All Other Terms And Conditions Remain Unchanged.
- 10 Jun 2022
- Gaseous Nitrogen(Gn2)/Breathing Air (Bair) Panel Fabrication, Build And Verification Testing. The Period Of Performance Is Extended From 5/31/22 To 7/15/22. All Other Terms And Conditions Remain Unchanged.
- Nasa Kennedy Space Center
- National Aeronautics And Space Administration (Nasa)
- $320,194.78
- National Aeronautics And Space Administration (Nasa)
- 80KSC021F0178
- Gaseous Nitrogen(Gn2)/Breathing Air (Bair) Panel Fabrication, Build, And Verification Testing.
- 9 Sep 2021
- Gaseous Nitrogen(Gn2)/Breathing Air (Bair) Panel Fabrication, Build, And Verification Testing.
- Nasa Kennedy Space Center
- National Aeronautics And Space Administration (Nasa)
- $299,419.00
- National Aeronautics And Space Administration (Nasa)
- 80KSC021F0178
- Gaseous Nitrogen(Gn2)/Breathing Air (Bair) Panel Fabrication, Build And Verification Testing. Mod 6: Extends Period Of Performance. All Other Terms And Conditions Remain Unchanged.
- 3 Oct 2022
- Gaseous Nitrogen(Gn2)/Breathing Air (Bair) Panel Fabrication, Build And Verification Testing. Mod 6: Extends Period Of Performance. All Other Terms And Conditions Remain Unchanged.
- Nasa Kennedy Space Center
- National Aeronautics And Space Administration (Nasa)
- $320,194.78
- National Aeronautics And Space Administration (Nasa)
- 80KSC021F0178
- Gaseous Nitrogen(Gn2)/Breathing Air (Bair) Panel Fabrication, Build And Verification Testing. Mod 3: Incorporate Price Increase On Various Items Procured And Extends Completion Date To 5/31/22. Increases Obligation And Contract Value To $320,194.68.
- 5 Apr 2022
- Gaseous Nitrogen(Gn2)/Breathing Air (Bair) Panel Fabrication, Build And Verification Testing. Mod 3: Incorporate Price Increase On Various Items Procured And Extends Completion Date To 5/31/22. Increases Obligation And Contract Value To $320,194.68.
- Nasa Kennedy Space Center
- National Aeronautics And Space Administration (Nasa)
- $320,194.78
- National Aeronautics And Space Administration (Nasa)
Supply Items Approved for CAGE 66589 Page 1 of 1
- GT-64-AB
- RNCC: 3 | RNVC: 2 | DAC: 4
- GT29-5
- RNCC: 3 | RNVC: 2 | DAC: 2