Jita Contracting, Inc.
Dba Jita Contracting
CAGE Code: 661X0
NCAGE Code: 661X0
Status: Active
Type: Commercial Supplier
Dun & Bradstreet (DUNS): 145232927
Summary
Jita Contracting, Inc., Dba Jita Contracting is an Active Commercial Supplier with the Cage Code 661X0 and is tracked by Dun & Bradstreet under DUNS Number 145232927..
Address
1140 A Main Avenue
Durango CO 81301
United States
Points of Contact
Related Information
People who viewed this 'CAGE Code' also viewed...
Quetzal Computational Associates Inc Summit Supply Corp Of Colorado Mining Equipment Ltd Ceramic Engineering Consulting Inc Prosthetic Development & Res Inc Apache Digital Corporation Animas Computer Services Information Services Loronix Inc. The Mac Ranch Llc Forest Safety Products, Inc. Forrest Tool Co Construction Technologies Llc Div Sme Environmental, Inc Jbs Associates Inc Fantastic Janitorial Service Sequel Software Bonds Construction Eci Graham Drywall Inc
Frequently Asked Questions (FAQ) for CAGE 661X0
- What is CAGE Code 661X0?
- 661X0 is the unique identifier used by NATO Organizations to reference the physical entity known as Jita Contracting, Inc. Dba Jita Contracting located at 1140 A Main Avenue, Durango CO 81301, United States.
- Who is CAGE Code 661X0?
- 661X0 refers to Jita Contracting, Inc. Dba Jita Contracting located at 1140 A Main Avenue, Durango CO 81301, United States.
- Where is CAGE Code 661X0 Located?
- CAGE Code 661X0 is located in Durango, CO, USA.
Contracting History for CAGE 661X0 Most Recent 25 Records
- 1240LT22C0027
- Gaoa East Fork Resurfacing Is Solicited In Accordance With The Attached Terms And Conditions.
- 14 Jun 2022
- Gaoa East Fork Resurfacing Is Solicited In Accordance With The Attached Terms And Conditions.
- Usda-Fs, Csa Intermountain 8
- Department Of Agriculture (Usda)
- $0.00
- Department Of Agriculture (Usda)
- 1240LT22C0027
- Gaoa East Fork Resurfacing Is Solicited In Accordance With The Attached Terms And Conditions.
- 23 Aug 2022
- Gaoa East Fork Resurfacing Is Solicited In Accordance With The Attached Terms And Conditions.
- Usda-Fs, Csa Intermountain 8
- Department Of Agriculture (Usda)
- $0.00
- Department Of Agriculture (Usda)
- 6982AF21C000016
- Termination For Default And Deobligate Remaining Funds.
- 10 Mar 2022
- Termination For Default And Deobligate Remaining Funds.
- 6982Af Central Federal Lands Divisi
- Department Of Transportation (Dot)
- $1,324,649.66
- Department Of Transportation (Dot)
- 1282AK20C0007
- The Purpose Of This Modification Is To Obligate $25,828.94 To Fund Change Order 9 For Submittal Delays Caused By The Government Per The Revised Change Order Dated 10/25/2021 And Rfp-008 To Raise Ceilings Per The Price Quote Dated 1/18/2022. The Tot
- 2 Feb 2022
- The Purpose Of This Modification Is To Obligate $25,828.94 To Fund Change Order 9 For Submittal Delays Caused By The Government Per The Revised Change Order Dated 10/25/2021 And Rfp-008 To Raise Ceilings Per The Price Quote Dated 1/18/2022. The Tot
- Usda-Fs, Csa Intermountain 8
- Department Of Agriculture (Usda)
- $6,199,267.93
- Department Of Agriculture (Usda)
- 1282AK20C0007
- The Purpose Of This Modification Is To Add $65,563.20 In Funding To The Contract For Optional Item 23 Export Rock Spoils. The Schedule Of Items In The Awarded Contract Has An Optional Item #23 Export Rock Spoils At $20.88 Per Cy. There Are 3140 Cy
- 6 Aug 2021
- The Purpose Of This Modification Is To Add $65,563.20 In Funding To The Contract For Optional Item 23 Export Rock Spoils. The Schedule Of Items In The Awarded Contract Has An Optional Item #23 Export Rock Spoils At $20.88 Per Cy. There Are 3140 Cy
- Usda-Fs, Csa Intermountain 8
- Department Of Agriculture (Usda)
- $5,731,362.81
- Department Of Agriculture (Usda)
- 1282AK20C0007
- The Purpose Of This Modification Is To Obligate $17,867.07 To Fund Rfp-002 For Furniture Power/Data Floor Relocation Per The Price Quote Dated 9/7/2021, $67,275.00 To Fund Rfp-003 For Pavement Section Revision Per The Price Quote Dated 9/8/2021 And $
- 13 Sep 2021
- The Purpose Of This Modification Is To Obligate $17,867.07 To Fund Rfp-002 For Furniture Power/Data Floor Relocation Per The Price Quote Dated 9/7/2021, $67,275.00 To Fund Rfp-003 For Pavement Section Revision Per The Price Quote Dated 9/8/2021 And $
- Usda-Fs, Csa Intermountain 8
- Department Of Agriculture (Usda)
- $5,901,560.30
- Department Of Agriculture (Usda)
- 1282AK20C0007
- The Purpose Of This Modification Is To Obligate $26,344.27 To Fund The Following: *Rfp-010 - Additional Light Pole $23,075.45 Per Price Quote Dated 2/18/2022 *Rfp-011 - Reset Trash Enclosure Gate $2,632.50 Per Price Quote Dated 2/22/2022
- 1 Mar 2022
- The Purpose Of This Modification Is To Obligate $26,344.27 To Fund The Following: *Rfp-010 - Additional Light Pole $23,075.45 Per Price Quote Dated 2/18/2022 *Rfp-011 - Reset Trash Enclosure Gate $2,632.50 Per Price Quote Dated 2/22/2022
- Usda-Fs, Csa Intermountain 8
- Department Of Agriculture (Usda)
- $6,225,612.20
- Department Of Agriculture (Usda)
- 1282AK20C0007
- The Purpose Of This Modification Is To Obligate $19,141.20 To Fund The Following: **Rfp 021 - Total $19,141.20 Rfp 021 Incorporates Changes To The Drainage For Planting Area ($16,625.70) And For The Excavation, Installation And Backfill Of Three
- 29 Sep 2022
- The Purpose Of This Modification Is To Obligate $19,141.20 To Fund The Following: **Rfp 021 - Total $19,141.20 Rfp 021 Incorporates Changes To The Drainage For Planting Area ($16,625.70) And For The Excavation, Installation And Backfill Of Three
- Usda-Fs, Csa Intermountain 8
- Department Of Agriculture (Usda)
- $6,349,142.88
- Department Of Agriculture (Usda)
- 1282AK20C0007
- The Purpose Of This Modification Is To Extend The Completion Date Of The Contract From January 6, 2023 To May 17, 2023. The Contract Is Being Extended For Consideration. A Total Of $1,000 Will Be Deducted From The Total Contract Value For The Exten
- 12 Jan 2023
- The Purpose Of This Modification Is To Extend The Completion Date Of The Contract From January 6, 2023 To May 17, 2023. The Contract Is Being Extended For Consideration. A Total Of $1,000 Will Be Deducted From The Total Contract Value For The Exten
- Usda-Fs, Csa Intermountain 8
- Department Of Agriculture (Usda)
- $6,345,142.88
- Department Of Agriculture (Usda)
- 1282AK20C0007
- The Purpose Of This Modification Is To Obligate $1,755.00 To Fund The Following: *Rfp-013 - Additional Fence Post Holes $1,755.00 Per Price Quote Dated 3/14/2022 The Total Obligation For This Modification Is $1,755.00. The Total Contract Valu
- 29 Mar 2022
- The Purpose Of This Modification Is To Obligate $1,755.00 To Fund The Following: *Rfp-013 - Additional Fence Post Holes $1,755.00 Per Price Quote Dated 3/14/2022 The Total Obligation For This Modification Is $1,755.00. The Total Contract Valu
- Usda-Fs, Csa Intermountain 8
- Department Of Agriculture (Usda)
- $6,227,367.20
- Department Of Agriculture (Usda)
- 1282AK20C0007
- The Purpose Of This Modification Is To Extend The Completion Date Of The Contract From November 16, 2022 To December 12, 2022. The Contract Is Being Extended For Consideration. A Total Of $2,000 Will Be Deducted From The Total Contract Value For Th
- 17 Nov 2022
- The Purpose Of This Modification Is To Extend The Completion Date Of The Contract From November 16, 2022 To December 12, 2022. The Contract Is Being Extended For Consideration. A Total Of $2,000 Will Be Deducted From The Total Contract Value For Th
- Usda-Fs, Csa Intermountain 8
- Department Of Agriculture (Usda)
- $6,347,142.88
- Department Of Agriculture (Usda)
- 1282AK20C0007
- The Purpose Of This Modification Is To Obligate $64836.78 For Change Request 10 Per The Revised Price Proposal Dated 9/1/2021. The Change Is To Add Parterre Lvt And Armstrong Vct Flooring In All Hallway Areas And Storage Areas. The Proposal Also In
- 7 Sep 2021
- The Purpose Of This Modification Is To Obligate $64836.78 For Change Request 10 Per The Revised Price Proposal Dated 9/1/2021. The Change Is To Add Parterre Lvt And Armstrong Vct Flooring In All Hallway Areas And Storage Areas. The Proposal Also In
- Usda-Fs, Csa Intermountain 8
- Department Of Agriculture (Usda)
- $5,815,842.13
- Department Of Agriculture (Usda)
- 1282AK20C0007
- The Purpose Of This Modification Is To Add $2,925.00 To The Contract To Move The Return Air For Furnace 4 To A New Location. The Change Of Location Of The Return Air Is A Result Of The Site Observation Report By 360 Engineering. The Report Indicate
- 27 Apr 2022
- The Purpose Of This Modification Is To Add $2,925.00 To The Contract To Move The Return Air For Furnace 4 To A New Location. The Change Of Location Of The Return Air Is A Result Of The Site Observation Report By 360 Engineering. The Report Indicate
- Usda-Fs, Csa Intermountain 8
- Department Of Agriculture (Usda)
- $6,255,049.40
- Department Of Agriculture (Usda)
- 1282AK20C0007
- The Purpose Of This Modification Is To Obligate $67,053.81 To Fund Rfp-005 For The Trash Enclosure Per The Price Quote 9/10/2021 And $4,095.00 To Fund Change Request 11 For The Chase Plates To Accommodate Downspout Locations Per Price Quote Dated 9/2
- 30 Sep 2021
- The Purpose Of This Modification Is To Obligate $67,053.81 To Fund Rfp-005 For The Trash Enclosure Per The Price Quote 9/10/2021 And $4,095.00 To Fund Change Request 11 For The Chase Plates To Accommodate Downspout Locations Per Price Quote Dated 9/2
- Usda-Fs, Csa Intermountain 8
- Department Of Agriculture (Usda)
- $6,172,736.99
- Department Of Agriculture (Usda)
- 1282AK20C0007
- The Purpose Of This Modification Is To Obligate $24,757.20 To Fund The Following: *Rfp-011 - Additional Landscaping $24,757.20 Per Price Quote Dated 3/18/2022 The Total Obligation For This Modification Is $24,757.20. The Total Contract Value
- 12 Apr 2022
- The Purpose Of This Modification Is To Obligate $24,757.20 To Fund The Following: *Rfp-011 - Additional Landscaping $24,757.20 Per Price Quote Dated 3/18/2022 The Total Obligation For This Modification Is $24,757.20. The Total Contract Value
- Usda-Fs, Csa Intermountain 8
- Department Of Agriculture (Usda)
- $6,252,124.40
- Department Of Agriculture (Usda)
- 1282AK20C0007
- The Purpose Of This Modification Is To Obligate $18,790.20 To Fund Rfp-001 For Brick Tuckpointing Per The Price Quote 9/9/2021, $177,383.70 To Fund Rfp-006 For The Base Of The Fencing Revisions Per Price Quote Dated 9/20/2021 And $3,853.98 To Fund Rf
- 27 Sep 2021
- The Purpose Of This Modification Is To Obligate $18,790.20 To Fund Rfp-001 For Brick Tuckpointing Per The Price Quote 9/9/2021, $177,383.70 To Fund Rfp-006 For The Base Of The Fencing Revisions Per Price Quote Dated 9/20/2021 And $3,853.98 To Fund Rf
- Usda-Fs, Csa Intermountain 8
- Department Of Agriculture (Usda)
- $6,101,588.18
- Department Of Agriculture (Usda)
- 1282AK20C0007
- The Purpose Of This Modification Is To Extend The Completion Date Of The Contract From October 26, 2022 To November 16, 2022. Extending The Completion Date Of The Contract To November 16, 2022 Is In The Best Interests Of The Government. No Reductio
- 27 Oct 2022
- The Purpose Of This Modification Is To Extend The Completion Date Of The Contract From October 26, 2022 To November 16, 2022. Extending The Completion Date Of The Contract To November 16, 2022 Is In The Best Interests Of The Government. No Reductio
- Usda-Fs, Csa Intermountain 8
- Department Of Agriculture (Usda)
- $6,349,142.88
- Department Of Agriculture (Usda)
- 1282AK20C0007
- The Purpose Of This Modification Is To Obligate $51,799.15 To Fund The Following: *Change Order #014 - Additional Electrical Circuits $23,220.09 Per Price Quote Dated 4/27/2022 **Rfp-015 - Breakroom Exterior Wall $4,486.95 Per Price Quote Date
- 10 Jun 2022
- The Purpose Of This Modification Is To Obligate $51,799.15 To Fund The Following: *Change Order #014 - Additional Electrical Circuits $23,220.09 Per Price Quote Dated 4/27/2022 **Rfp-015 - Breakroom Exterior Wall $4,486.95 Per Price Quote Date
- Usda-Fs, Csa Intermountain 8
- Department Of Agriculture (Usda)
- $6,306,848.55
- Department Of Agriculture (Usda)
- 1282AK20C0007
- The Purpose Of This Modification Is To Obligate $12,379.18 For Change Order 5 To Sawcut And Remove And Replace New Concrete In All Three Existing Restroom Locations. The Modification Also Obligates $1,179.36 For Change Order 6 For Suitable Backfill
- 26 Aug 2021
- The Purpose Of This Modification Is To Obligate $12,379.18 For Change Order 5 To Sawcut And Remove And Replace New Concrete In All Three Existing Restroom Locations. The Modification Also Obligates $1,179.36 For Change Order 6 For Suitable Backfill
- Usda-Fs, Csa Intermountain 8
- Department Of Agriculture (Usda)
- $5,744,921.35
- Department Of Agriculture (Usda)
- 1282AK20C0007
- The Purpose Of This Modification Is To Obligate $5,945.94 To Fund The Following: **Rfp 018 - Total $2,201.94 Rfp 018 Includes Supply And Install A Storeroom Lock To The It Room 112 That Includes A Modification Of The Existing Hm Door ($1,061.19)
- 14 Sep 2022
- The Purpose Of This Modification Is To Obligate $5,945.94 To Fund The Following: **Rfp 018 - Total $2,201.94 Rfp 018 Includes Supply And Install A Storeroom Lock To The It Room 112 That Includes A Modification Of The Existing Hm Door ($1,061.19)
- Usda-Fs, Csa Intermountain 8
- Department Of Agriculture (Usda)
- $6,330,001.68
- Department Of Agriculture (Usda)
- 1282AK20C0007
- The Purpose Of This Modification Is To Change The Contracting Officer From Kellie Shaw To Tanya Spanfellner. All Further Communications Must Go To And Be Signed By Tanya Spanfellner. All Other Terms And Conditions Of This Contract Remain The Same.
- 30 Jan 2023
- The Purpose Of This Modification Is To Change The Contracting Officer From Kellie Shaw To Tanya Spanfellner. All Further Communications Must Go To And Be Signed By Tanya Spanfellner. All Other Terms And Conditions Of This Contract Remain The Same.
- Usda-Fs, Csa Intermountain 8
- Department Of Agriculture (Usda)
- $6,345,142.88
- Department Of Agriculture (Usda)
- 1282AK20C0007
- The Purpose Of This Modification Is To Obligate $6,084.00 For Change Order 4 Per Price Proposal Dated 6/14/2021. The Change Includes The Supply And Install 2 New Hss4x4x1/4 Posts With Base Plates For Anchorage And 2 New W8x31 Beams With Shear Tabs F
- 27 Aug 2021
- The Purpose Of This Modification Is To Obligate $6,084.00 For Change Order 4 Per Price Proposal Dated 6/14/2021. The Change Includes The Supply And Install 2 New Hss4x4x1/4 Posts With Base Plates For Anchorage And 2 New W8x31 Beams With Shear Tabs F
- Usda-Fs, Csa Intermountain 8
- Department Of Agriculture (Usda)
- $5,751,005.35
- Department Of Agriculture (Usda)
- 1282AK20C0007
- The Purpose Of This Modification Is To Obligate $17,207.19 To Fund The Following: **Rfp 014 - Total $13,016.25 Rfp 014 Includes Raising The Bar Height ($614.25), Tree Protection ($4,563.00), Paint ($4,329.00) And Primer ($3,510) Per Price Quote D
- 18 Jul 2022
- The Purpose Of This Modification Is To Obligate $17,207.19 To Fund The Following: **Rfp 014 - Total $13,016.25 Rfp 014 Includes Raising The Bar Height ($614.25), Tree Protection ($4,563.00), Paint ($4,329.00) And Primer ($3,510) Per Price Quote D
- Usda-Fs, Csa Intermountain 8
- Department Of Agriculture (Usda)
- $6,324,055.74
- Department Of Agriculture (Usda)
- 1282CS20P0040
- San Juan National Forest, Dolores Ranger District, Glade Point Road (Nfsr 509) Resurfacing.
- 5 Aug 2020
- San Juan National Forest, Dolores Ranger District, Glade Point Road (Nfsr 509) Resurfacing.
- San Juan National Forest
- Department Of Agriculture (Usda)
- $203,877.00
- Department Of Agriculture (Usda)
- 1282CS20C0006
- San Juan National Forest, National Forest Service Road (Nfsr) 504, Lone Dome Road Resurfacing Of 10.5 Miles.
- 3 Aug 2020
- San Juan National Forest, National Forest Service Road (Nfsr) 504, Lone Dome Road Resurfacing Of 10.5 Miles.
- San Juan National Forest
- Department Of Agriculture (Usda)
- $1,430,748.15
- Department Of Agriculture (Usda)