Wsp Usa Inc
Dba Parsons Brinckerhoff
Constructors
CAGE Code: 63GY9
NCAGE Code: 63GY9
Status: Active
Type: Commercial Supplier
Dun & Bradstreet (DUNS): 021411210
Summary
Wsp Usa Inc, Dba Parsons Brinckerhoff, Constructors is an Active Commercial Supplier with the Cage Code 63GY9 and is tracked by Dun & Bradstreet under DUNS Number 021411210..
Address
851 Sw 6Th Ave
Ste 1600
Portland OR 97204-1307
United States
Points of Contact
No Points of Contact...
Related Information
People who viewed this 'CAGE Code' also viewed...
Ian F. Robertson Jr Urban Flood Safety And Water Quality J B M Services Inc. Gulf Coast Labels Ace Communications Inc Newton David J Associates Inc Carvel Co The Environmental Systems Perry And Banks Inc Martin Products Inc Tci America P C Imaging Rodda Paint Co. Coastal Computer Center Northwest Industrial Sewing Machine Nobeltec Corporation Bamford Chase Mach Co Portland Marine Inc Thompson L G And Associates Kaufman Dental Mfg Inc Bragg N H And Sons
Frequently Asked Questions (FAQ) for CAGE 63GY9
- What is CAGE Code 63GY9?
- 63GY9 is the unique identifier used by NATO Organizations to reference the physical entity known as Wsp Usa Inc Dba Parsons Brinckerhoff Constructors located at 851 Sw 6Th Ave, Ste 1600, Portland OR 97204-1307, United States.
- Who is CAGE Code 63GY9?
- 63GY9 refers to Wsp Usa Inc Dba Parsons Brinckerhoff Constructors located at 851 Sw 6Th Ave, Ste 1600, Portland OR 97204-1307, United States.
- Where is CAGE Code 63GY9 Located?
- CAGE Code 63GY9 is located in Portland, OR, USA.
Contracting History for CAGE 63GY9 Most Recent 25 Records
- 693C7321F000038
- The Purpose Of This Modification Is To Update/Correct Cost Associated With The Awarded Task Order Due To A Miscalculation In The Original Cost. These Changes Are As Follows: 1. Increase Total Obligated Amount For Contract Line Item Number-Clin-0000
- 13 Apr 2021
- The Purpose Of This Modification Is To Update/Correct Cost Associated With The Awarded Task Order Due To A Miscalculation In The Original Cost. These Changes Are As Follows: 1. Increase Total Obligated Amount For Contract Line Item Number-Clin-0000
- 693C73 Eastern Fed Lands Division
- Department Of Transportation (Dot)
- $750,954.82
- Department Of Transportation (Dot)
- 693C7321F000038
- The Purpose Of This Modification Is To Update/Correct Cost Associated With The Awarded Task Order Due To A Miscalculation In The Original Cost. These Changes Are As Follows: 1. Increase Total Obligated Amount For Contract Line Item Number-Clin-0000
- 1 Aug 2022
- The Purpose Of This Modification Is To Update/Correct Cost Associated With The Awarded Task Order Due To A Miscalculation In The Original Cost. These Changes Are As Follows: 1. Increase Total Obligated Amount For Contract Line Item Number-Clin-0000
- 693C73 Eastern Fed Lands Division
- Department Of Transportation (Dot)
- $750,954.82
- Department Of Transportation (Dot)
- 693C7321F000038
- The Purpose Of This No Cost Modification Is To Extend The Period Of Performance End Date To June 30, 2024, Due To Utility Project Conflicts With The Schedule For This Project's Construction. All Other Terms And Conditions Remain The Same.
- 2 May 2023
- The Purpose Of This No Cost Modification Is To Extend The Period Of Performance End Date To June 30, 2024, Due To Utility Project Conflicts With The Schedule For This Project's Construction. All Other Terms And Conditions Remain The Same.
- 693C73 Eastern Fed Lands Division
- Department Of Transportation (Dot)
- $750,954.82
- Department Of Transportation (Dot)
- 693C7321F000035
- The Purpose Of This Administrative Modification Is To: 1. Cancel Contract Line Item Number(Clin)-00007 In The Total Amount Of $55,739.58. 2. Cancel Clin-00008 In The Total Amount Of $24,203.58. 3. Increase Total Obligated Amount For Clin 00009 Fro
- 22 Jun 2021
- The Purpose Of This Administrative Modification Is To: 1. Cancel Contract Line Item Number(Clin)-00007 In The Total Amount Of $55,739.58. 2. Cancel Clin-00008 In The Total Amount Of $24,203.58. 3. Increase Total Obligated Amount For Clin 00009 Fro
- 693C73 Eastern Fed Lands Division
- Department Of Transportation (Dot)
- $715,583.34
- Department Of Transportation (Dot)
- 693C7321F000035
- The Purpose For This Modification Is To: 1. Extend The Period Of Performance End Date From May 31, 2023, To August 31, 2023, To Allow The Ae Enough Time To Revise Plan Sheets Previously Submitted That Are Not Meeting Minimum Utility Requirements. 2
- 6 Apr 2023
- The Purpose For This Modification Is To: 1. Extend The Period Of Performance End Date From May 31, 2023, To August 31, 2023, To Allow The Ae Enough Time To Revise Plan Sheets Previously Submitted That Are Not Meeting Minimum Utility Requirements. 2
- 693C73 Eastern Fed Lands Division
- Department Of Transportation (Dot)
- $715,583.34
- Department Of Transportation (Dot)
- 69056720F000105
- Wfl Research 2020(13), Integrating Public Health In Public Land Transportation Planning Updates Deliverables In Schedule And Extend The Completion Date
- 18 Oct 2022
- Wfl Research 2020(13), Integrating Public Health In Public Land Transportation Planning Updates Deliverables In Schedule And Extend The Completion Date
- 690567 Western Federal Lands Div
- Department Of Transportation (Dot)
- $497,758.79
- Department Of Transportation (Dot)
- 69056720F000105
- Wfl Research 2020(13), Integrating Public Health In Public Land Transportation Planning Research Study On Integrating Public Health In Public Land Transportation Planning Two Separate Studies
- 27 Aug 2020
- Wfl Research 2020(13), Integrating Public Health In Public Land Transportation Planning Research Study On Integrating Public Health In Public Land Transportation Planning Two Separate Studies
- 690567 Western Federal Lands Div
- Department Of Transportation (Dot)
- $497,758.79
- Department Of Transportation (Dot)
- 69056720F000105
- Wfl Research 2020(13), Integrating Public Health In Public Land Transportation Planning Closeout
- 16 May 2023
- Wfl Research 2020(13), Integrating Public Health In Public Land Transportation Planning Closeout
- 690567 Western Federal Lands Div
- Department Of Transportation (Dot)
- $497,758.79
- Department Of Transportation (Dot)
- 69056720F000099
- Wfl Research 2020(11), Targeted Maintenance On Low Volume Roads Adjusts The Deliverable Schedule And Extends The Period Of Performance
- 10 Oct 2023
- Wfl Research 2020(11), Targeted Maintenance On Low Volume Roads Adjusts The Deliverable Schedule And Extends The Period Of Performance
- 690567 Western Federal Lands Div
- Department Of Transportation (Dot)
- $614,898.93
- Department Of Transportation (Dot)
- 69056720F000099
- Wfl Research 2020(11), Targeted Maintenance On Low Volume Roads Survey Tasks
- 13 Sep 2021
- Wfl Research 2020(11), Targeted Maintenance On Low Volume Roads Survey Tasks
- 690567 Western Federal Lands Div
- Department Of Transportation (Dot)
- $614,898.93
- Department Of Transportation (Dot)
- 69056720F000060
- Id Fs Erfo 2017(1)-29(1), Stoddard Bridge Extends The Fixed Completion Date
- 15 Sep 2021
- Id Fs Erfo 2017(1)-29(1), Stoddard Bridge Extends The Fixed Completion Date
- 690567 Western Federal Lands Div
- Department Of Transportation (Dot)
- $986,640.26
- Department Of Transportation (Dot)
- 69056720F000060
- Id Fs Erfo 2017(1)-29(1), Stoddard Bridge Intermediate Through Final Design Phases
- 23 Jun 2020
- Id Fs Erfo 2017(1)-29(1), Stoddard Bridge Intermediate Through Final Design Phases
- 690567 Western Federal Lands Div
- Department Of Transportation (Dot)
- $986,640.26
- Department Of Transportation (Dot)
- 69056720F000060
- Id Fs Erfo 2017(1)-29(1), Stoddard Bridge Closeout
- 13 Jun 2022
- Id Fs Erfo 2017(1)-29(1), Stoddard Bridge Closeout
- 690567 Western Federal Lands Div
- Department Of Transportation (Dot)
- $986,640.26
- Department Of Transportation (Dot)
- 693C7320F000072
- The Purpose Of This Modification Is To Add Sidewalk From 17Th Street Nw To Piney Branch Parkway For Project: Np Rocr 503(1) 24(2) As Follows And In Accordance With The Attached Statement Of Work: 1. Add And Fully Fund Contract Line Item Number(Clin)
- 1 Sep 2022
- The Purpose Of This Modification Is To Add Sidewalk From 17Th Street Nw To Piney Branch Parkway For Project: Np Rocr 503(1) 24(2) As Follows And In Accordance With The Attached Statement Of Work: 1. Add And Fully Fund Contract Line Item Number(Clin)
- 693C73 Eastern Fed Lands Division
- Department Of Transportation (Dot)
- $1,083,964.01
- Department Of Transportation (Dot)
- 693C7320F000072
- The Reason For This No Cost Administrative Modification Is To Extend The Period Of Performance End Date Until June 19, 2025, Due To The Design Work Being On Hold For 9-10 Months For Sidewalk Work Contract Modification And Also, Require Additional Tim
- 28 Dec 2022
- The Reason For This No Cost Administrative Modification Is To Extend The Period Of Performance End Date Until June 19, 2025, Due To The Design Work Being On Hold For 9-10 Months For Sidewalk Work Contract Modification And Also, Require Additional Tim
- 693C73 Eastern Fed Lands Division
- Department Of Transportation (Dot)
- $1,083,964.01
- Department Of Transportation (Dot)
- 693C7320F000028
- The Purpose For This No Cost Administrative Modification Is To Update The Contract Line Item Numbers For This Task Order To Reflect Changes To The Lines Of Accounting As Follows: 1. Cancel Contract Line Item Numbers (Clin) 00101-00701 In Their Entir
- 1 Jun 2023
- The Purpose For This No Cost Administrative Modification Is To Update The Contract Line Item Numbers For This Task Order To Reflect Changes To The Lines Of Accounting As Follows: 1. Cancel Contract Line Item Numbers (Clin) 00101-00701 In Their Entir
- 693C73 Eastern Fed Lands Division
- Department Of Transportation (Dot)
- $508,747.22
- Department Of Transportation (Dot)
- 693C7320F000028
- The Purpose For This Modification Is To: 1. Add And Fully Fund Contract Line Item Number - Clin-00801 In The Amount Of $15,685.42 For Additional Level Of Work To Develop Schedule C In Accordance With The Attached Statement Of Work. 2. Total Obligat
- 18 Aug 2021
- The Purpose For This Modification Is To: 1. Add And Fully Fund Contract Line Item Number - Clin-00801 In The Amount Of $15,685.42 For Additional Level Of Work To Develop Schedule C In Accordance With The Attached Statement Of Work. 2. Total Obligat
- 693C73 Eastern Fed Lands Division
- Department Of Transportation (Dot)
- $508,747.22
- Department Of Transportation (Dot)
- 693C7320F000028
- The Purpose For This Modification Is To: 1. Exercise The Option For Contract Line Item Number(Clin)00004 And Fully Fund In The Amount Of $120,375.35. 2. Exercise The Option For Clin 00005 And Fully Fund In The Amount Of $29,691.06. 3. Total Obliga
- 9 Jun 2020
- The Purpose For This Modification Is To: 1. Exercise The Option For Contract Line Item Number(Clin)00004 And Fully Fund In The Amount Of $120,375.35. 2. Exercise The Option For Clin 00005 And Fully Fund In The Amount Of $29,691.06. 3. Total Obliga
- 693C73 Eastern Fed Lands Division
- Department Of Transportation (Dot)
- $508,747.22
- Department Of Transportation (Dot)
- 693C7320F000028
- The Purpose Of This No Cost Administrative Modification Is To Extend The Period Of Performance End Date From December 31, 2023, Until December 8, 2024, To Allow For The Completion Of The Plans And For Design Assistance During The Construction. All Ot
- 4 Dec 2023
- The Purpose Of This No Cost Administrative Modification Is To Extend The Period Of Performance End Date From December 31, 2023, Until December 8, 2024, To Allow For The Completion Of The Plans And For Design Assistance During The Construction. All Ot
- 693C73 Eastern Fed Lands Division
- Department Of Transportation (Dot)
- $508,747.22
- Department Of Transportation (Dot)
- 693C7320F000028
- The Purpose Of This Modification Is To: 1. In Accordance With Far Clause 52.217-8, Entitled "Option To Extend Services, (Nov 1999)," Cited Contract Is Hereby Modified To Extend The Period Of Performance End Date To December 31, 2023, Due T
- 12 Apr 2023
- The Purpose Of This Modification Is To: 1. In Accordance With Far Clause 52.217-8, Entitled "Option To Extend Services, (Nov 1999)," Cited Contract Is Hereby Modified To Extend The Period Of Performance End Date To December 31, 2023, Due T
- 693C73 Eastern Fed Lands Division
- Department Of Transportation (Dot)
- $508,747.22
- Department Of Transportation (Dot)
- 69056720F000001
- Or Dot 18(2), Or-58: Fix-It Corridor Culverts Closeout
- 27 Oct 2022
- Or Dot 18(2), Or-58: Fix-It Corridor Culverts Closeout
- 690567 Western Federal Lands Div
- Department Of Transportation (Dot)
- $1,749,707.64
- Department Of Transportation (Dot)
- 69056720F000001
- Or Dot 18(2), Or-58: Fix-It Corridor Culverts Intermediate Design Phases.
- 21 Oct 2019
- Or Dot 18(2), Or-58: Fix-It Corridor Culverts Intermediate Design Phases.
- 690567 Western Federal Lands Div
- Department Of Transportation (Dot)
- $1,749,707.64
- Department Of Transportation (Dot)
- 693C7320F000034
- The Purpose Of This No Cost Modification Is To Extend The Period Of Performance End To June 25, 2025, Considering The Project's Involvement In The Relocation Of Utilities And Acquiring The Right Of Way. All Other Terms And Conditions Remain The
- 5 Dec 2023
- The Purpose Of This No Cost Modification Is To Extend The Period Of Performance End To June 25, 2025, Considering The Project's Involvement In The Relocation Of Utilities And Acquiring The Right Of Way. All Other Terms And Conditions Remain The
- 693C73 Eastern Fed Lands Division
- Department Of Transportation (Dot)
- $2,377,850.54
- Department Of Transportation (Dot)
- 693C7320F000034
- The Purpose Of This Modification To Contract Dtfh7015d00005l/693C7320f000034 Is To Move Udo Amounts From The Existing 6320 Accounts To New 15G Accounts As Follows 1. Reduce Contract Line Item Number(Clin)00001 By The Unbilled Amount Of $539,121.87.
- 20 Jul 2022
- The Purpose Of This Modification To Contract Dtfh7015d00005l/693C7320f000034 Is To Move Udo Amounts From The Existing 6320 Accounts To New 15G Accounts As Follows 1. Reduce Contract Line Item Number(Clin)00001 By The Unbilled Amount Of $539,121.87.
- 693C73 Eastern Fed Lands Division
- Department Of Transportation (Dot)
- $2,350,919.02
- Department Of Transportation (Dot)
- 693C7320F000034
- The Purpose Of This Modification To Contract Task Order D Cotfh7015d00005l/693C7320f000034 Is 1. Update The Total Obligated Value For Modification P00006 From $2,308,379.02 To $2,350,919.02. 2. Total Obligated Value For The Contract Task Order D C
- 25 Jul 2022
- The Purpose Of This Modification To Contract Task Order D Cotfh7015d00005l/693C7320f000034 Is 1. Update The Total Obligated Value For Modification P00006 From $2,308,379.02 To $2,350,919.02. 2. Total Obligated Value For The Contract Task Order D C
- 693C73 Eastern Fed Lands Division
- Department Of Transportation (Dot)
- $2,350,919.02
- Department Of Transportation (Dot)