Silvergate Construction, Inc.
CAGE Code: 61HH5
NCAGE Code: 61HH5
Status: Active
Type: Commercial Supplier
Dun & Bradstreet (DUNS): 947831850
Summary
Silvergate Construction, Inc. is an Active Commercial Supplier with the Cage Code 61HH5 and is tracked by Dun & Bradstreet under DUNS Number 947831850..
Address
15310 Nw 150
Piedmont OK 73078-9433
United States
Points of Contact
No Points of Contact...
Related Information
People who viewed this 'CAGE Code' also viewed...
Integrity Fire And Safety His Investments, Llc Golden State Awards Grace Blessings Corporation C And M Machine Works Absolute Pest Solutions Llp Johnnys Salvage Window Repair Systems, Inc. Tracey Woodruff Traveler Industry Plastics Unlimited Baray Enterprises Inc American Hi-Lift Galloway Tripp Inc Compressed Air Services Inc Tristan S Electric Llc Delta Mills Marketing Co Estes Plant Drexler Susan Aunt Sandys Maytag Home Appliance Gallant Bob Trucking Inc Advanced Radiologic Imaging Medical
Frequently Asked Questions (FAQ) for CAGE 61HH5
- What is CAGE Code 61HH5?
- 61HH5 is the unique identifier used by NATO Organizations to reference the physical entity known as Silvergate Construction, Inc. located at 15310 Nw 150, Piedmont OK 73078-9433, United States.
- Who is CAGE Code 61HH5?
- 61HH5 refers to Silvergate Construction, Inc. located at 15310 Nw 150, Piedmont OK 73078-9433, United States.
- Where is CAGE Code 61HH5 Located?
- CAGE Code 61HH5 is located in Piedmont, OK, USA.
Contracting History for CAGE 61HH5 Most Recent 25 Records
- 47PH0618P0009
- The Purpose Of This Modification Is To Extend The Period Of Performance At No Cost To The Government For Wood Floor Replace And Repair In Judge's Chambers In Office Suite 3102 Located At Oklahoma City Federal Building Us Courthouse 200 Nw 4Th Street Oklahoma City, Ok 73102 A.)The Total Contract Price Will Remain The Same At $9,546. B.) Contractor Resumed Work On September 24, 2018. C.) Correct/Change The Period Of Performance Completion Date And Have It Match The Ultimate Completion Of 11/30/2018 . D.)All Other Terms And Conditions Remain Unchanged. Contractor's Statement Of Release: In Consideration Of The Modification Agreed To Herein, The Contractor Accepts An Extension Of 154 Calendar Days As Complete Equitable Adjustment And Accepts The No Cost Increase In The Amount Of$0 For The Government's Request For Change. The Equitable Adjustment In This Modification Also Includes All Direct, Indirect And Cumulative Impact And Delay Costs, If Any, Incurred In Performing The Changed And Unchanged Contract Work Affected By This Modification. The Contractor Hereby Releases The Government From Any And All Liability Under This Contract For Any Equitable Adjustments Attributable To Such Facts Or Circumstances Giving Rise To This Supplemental Agreement/Modification For Additional Work And/Or Time To The Project.
- 6 Dec 2018
- The Purpose Of This Modification Is To Extend The Period Of Performance At No Cost To The Government For Wood Floor Replace And Repair In Judge's Chambers In Office Suite 3102 Located At Oklahoma City Federal Building Us Courthouse 200 Nw 4Th Street Oklahoma City, Ok 73102 A.)The Total Contract Price Will Remain The Same At $9,546. B.) Contractor Resumed Work On September 24, 2018. C.) Correct/Change The Period Of Performance Completion Date And Have It Match The Ultimate Completion Of 11/30/2018 . D.)All Other Terms And Conditions Remain Unchanged. Contractor's Statement Of Release: In Consideration Of The Modification Agreed To Herein, The Contractor Accepts An Extension Of 154 Calendar Days As Complete Equitable Adjustment And Accepts The No Cost Increase In The Amount Of$0 For The Government's Request For Change. The Equitable Adjustment In This Modification Also Includes All Direct, Indirect And Cumulative Impact And Delay Costs, If Any, Incurred In Performing The Changed And Unchanged Contract Work Affected By This Modification. The Contractor Hereby Releases The Government From Any And All Liability Under This Contract For Any Equitable Adjustments Attributable To Such Facts Or Circumstances Giving Rise To This Supplemental Agreement/Modification For Additional Work And/Or Time To The Project.
- Pbs R7 Aquisition Management
- General Services Administration (Gsa)
- $9,546.00
- General Services Administration (Gsa)
- 47PH0618P0020
- Modification Ps01 Is A No Cost Modification Issued To Extend The Period Of Performance For Completion Of This Project From 10/22/18 To 11/27/18. This Modification Is Allowed Due To The Access To The Space To Be Painted Being Hindered By Court Schedule. All Other Terms And Conditions Remain The Same, Including Price Of $28,037.00..............In Consideration Of The Modification Agreed To Herein As Complete Equitable Adjustment For The Contractor Silvergate Construction's Proposal For Adjustment, The Contractor Hereby Releases The Government From Any And All Liability Under This Contract For Further Equitable Adjustment Attributable To Such Facts Or Circumstances Giving Rise To The Proposal For Adjustment............
- 18 Oct 2018
- Modification Ps01 Is A No Cost Modification Issued To Extend The Period Of Performance For Completion Of This Project From 10/22/18 To 11/27/18. This Modification Is Allowed Due To The Access To The Space To Be Painted Being Hindered By Court Schedule. All Other Terms And Conditions Remain The Same, Including Price Of $28,037.00..............In Consideration Of The Modification Agreed To Herein As Complete Equitable Adjustment For The Contractor Silvergate Construction's Proposal For Adjustment, The Contractor Hereby Releases The Government From Any And All Liability Under This Contract For Further Equitable Adjustment Attributable To Such Facts Or Circumstances Giving Rise To The Proposal For Adjustment............
- Pbs R7 Aquisition Management
- General Services Administration (Gsa)
- $28,037.00
- General Services Administration (Gsa)
- 47PH0618P0003
- Igf::Ot::Igf Construction Services To Renovate Judge Hall's Restroom Located In The Old Post Office Federal Courthouse, 215 Dean A. Mcgee Avenue, Oklahoma City, Oklahoma.
- 29 Jan 2018
- Igf::Ot::Igf Construction Services To Renovate Judge Hall's Restroom Located In The Old Post Office Federal Courthouse, 215 Dean A. Mcgee Avenue, Oklahoma City, Oklahoma.
- Pbs R7 Aquisition Management
- General Services Administration (Gsa)
- $12,115.00
- General Services Administration (Gsa)
- 47PH0618P0017
- Modification Ps0001 Extends The Period Of Performance Only From 11/20/18 To 12/10/18 Due To Weather Conditions And Unforseen Insect Damage That Was Not Visibly Noticeable During The Site Visit. All Other Terms And Conditions Remain The Same, Including Price Of $217,082.00.................In Consideration Of The Modification Agreed To Herein As Complete Equitable Adjustment For The Contractor Big C's Proposal For Adjustment, The Contractor Hereby Releases The Government From Any And All Liability Under This Contract For Further Equitable Adjustment Attributable To Such Facts Or Circumstances Giving Rise To The Proposal For Adjustment.
- 28 Nov 2018
- Modification Ps0001 Extends The Period Of Performance Only From 11/20/18 To 12/10/18 Due To Weather Conditions And Unforseen Insect Damage That Was Not Visibly Noticeable During The Site Visit. All Other Terms And Conditions Remain The Same, Including Price Of $217,082.00.................In Consideration Of The Modification Agreed To Herein As Complete Equitable Adjustment For The Contractor Big C's Proposal For Adjustment, The Contractor Hereby Releases The Government From Any And All Liability Under This Contract For Further Equitable Adjustment Attributable To Such Facts Or Circumstances Giving Rise To The Proposal For Adjustment.
- Pbs R7 Aquisition Management
- General Services Administration (Gsa)
- $217,082.00
- General Services Administration (Gsa)
- 47PH0618P0019
- Renovations To District Courts Restroom In Suite 3102, Federal Building, 200 Nw 4Th St., Oklahoma City, Ok
- 2 Aug 2018
- Renovations To District Courts Restroom In Suite 3102, Federal Building, 200 Nw 4Th St., Oklahoma City, Ok
- Pbs R7 Aquisition Management
- General Services Administration (Gsa)
- $45,566.00
- General Services Administration (Gsa)
- 47PH0618P0017
- Ps0003 Adds Additional Work And Extends The Completion Date Due To Unforeseen Site Conditions To This Project. The Additional Work Is Described As Follows: Removal And Rereplacement Of Window Sash, Frame And Sill Components That Are Too Badly Damaged To Be Effectively Repaired By Convential Methods As Detailed By The Sow. This Also Includes The Removal And Replacement Of Defective Glazing Putty At Various Locations And Provides For Restoration Of Historic Entry Doors. See Attached Drawings A-02 Thru A-05. The Total For This Project Is Increased By $86,082.00, From $217,082.00 To $303,164.00. The Period Of Performance Is Also Extended From 12/10/2018 To 03/05/2019 To Allow For The Additional Work. All Other Terms And Conditions Remain The Same. Net 14...............Items Incorporated Into This Modification By Reference Are 1. Silvergate Construction's Final Proposal Dated 12/05/18 Which Is Hereby Accepted In The Amount Of $86,082.00.........................In Consideration Of The Modification Agreed To Herein As Complete Equitable Adjustment For The Contractor's Silvergate Construction, Inc Proposal For Adjustment, The Contractor Hereby Releases The Government From Any And All Liability Under This Contract For Further Equitable Adjustment Attributable To Such Facts Or Circumstances Giving Rise To This Proposal For Adjustment ....................................
- 13 Dec 2018
- Ps0003 Adds Additional Work And Extends The Completion Date Due To Unforeseen Site Conditions To This Project. The Additional Work Is Described As Follows: Removal And Rereplacement Of Window Sash, Frame And Sill Components That Are Too Badly Damaged To Be Effectively Repaired By Convential Methods As Detailed By The Sow. This Also Includes The Removal And Replacement Of Defective Glazing Putty At Various Locations And Provides For Restoration Of Historic Entry Doors. See Attached Drawings A-02 Thru A-05. The Total For This Project Is Increased By $86,082.00, From $217,082.00 To $303,164.00. The Period Of Performance Is Also Extended From 12/10/2018 To 03/05/2019 To Allow For The Additional Work. All Other Terms And Conditions Remain The Same. Net 14...............Items Incorporated Into This Modification By Reference Are 1. Silvergate Construction's Final Proposal Dated 12/05/18 Which Is Hereby Accepted In The Amount Of $86,082.00.........................In Consideration Of The Modification Agreed To Herein As Complete Equitable Adjustment For The Contractor's Silvergate Construction, Inc Proposal For Adjustment, The Contractor Hereby Releases The Government From Any And All Liability Under This Contract For Further Equitable Adjustment Attributable To Such Facts Or Circumstances Giving Rise To This Proposal For Adjustment ....................................
- Pbs R7 Aquisition Management
- General Services Administration (Gsa)
- $303,164.00
- General Services Administration (Gsa)
- 47PH0618C0007
- Construction Services To Replace Window Blinds To Be Performed At William J. Holloway Jr. Federal Courthouse, 200 Nw 4Th Street, Oklahoma City, Ok 73102
- 21 May 2018
- Construction Services To Replace Window Blinds To Be Performed At William J. Holloway Jr. Federal Courthouse, 200 Nw 4Th Street, Oklahoma City, Ok 73102
- Pbs R7 Aquisition Management
- General Services Administration (Gsa)
- $23,702.00
- General Services Administration (Gsa)
- 47PH0618P0013
- Procurement Of Construction To Remove Wall Section To Reroute Access To Mezzanine Mechanical Room And Repainting Existing Restrooms Located At Okc Post Office/Courthouse 215 Dean A. Mcgee Ave, Oklahoma City, Ok 73102
- 22 Jun 2018
- Procurement Of Construction To Remove Wall Section To Reroute Access To Mezzanine Mechanical Room And Repainting Existing Restrooms Located At Okc Post Office/Courthouse 215 Dean A. Mcgee Ave, Oklahoma City, Ok 73102
- Pbs R7 Aquisition Management
- General Services Administration (Gsa)
- $15,334.00
- General Services Administration (Gsa)
- 47PH0618P0017
- Window Repair At The Federal Building In Lawton, Ok
- 18 Jul 2018
- Window Repair At The Federal Building In Lawton, Ok
- Pbs R7 Aquisition Management
- General Services Administration (Gsa)
- $303,164.00
- General Services Administration (Gsa)
- 47PH0618P0013
- Modification Ps01 Extends The Period Of Perfromance Only From 8/22/2018 To 10/1/218, Due To The Ordering Of A Special Door Frame To Accomdiate The Thicker Wall That Was Existing In Place Delaying The Finishing Of The Project. This Increases The Award Amount From $14,984.00 To $15,344.00. All Other Terms And Conditions Remain The Same. Net 14 .............................In Consideration Of The Modifcation Agreed To Herein As Complete Equitable Adustment, The Contractor Silvergate Construction, Co, Hereby Releases The Government From Any And All Liability Under This Contract From Further Equitable Adustment Attribuatble To Such Facts And Circumstance Giving Rise To The Proposal For Adjustment......................
- 18 Sep 2018
- Modification Ps01 Extends The Period Of Perfromance Only From 8/22/2018 To 10/1/218, Due To The Ordering Of A Special Door Frame To Accomdiate The Thicker Wall That Was Existing In Place Delaying The Finishing Of The Project. This Increases The Award Amount From $14,984.00 To $15,344.00. All Other Terms And Conditions Remain The Same. Net 14 .............................In Consideration Of The Modifcation Agreed To Herein As Complete Equitable Adustment, The Contractor Silvergate Construction, Co, Hereby Releases The Government From Any And All Liability Under This Contract From Further Equitable Adustment Attribuatble To Such Facts And Circumstance Giving Rise To The Proposal For Adjustment......................
- Pbs R7 Aquisition Management
- General Services Administration (Gsa)
- $15,334.00
- General Services Administration (Gsa)
- 47PH0618P0012
- Restroom Exhaust Ductwork At Federal Building In Oklahoma City Ok
- 22 Jun 2018
- Restroom Exhaust Ductwork At Federal Building In Oklahoma City Ok
- Pbs R7 Aquisition Management
- General Services Administration (Gsa)
- $14,109.00
- General Services Administration (Gsa)
- 47PH0618P0017
- Modification Ps0004 Is A No Cost Modification Issued To Extend The Period Of Performance Only From March 5, 2019 To March 30, 2019. This Extension Is Allowed Due To Delays Caused By Bad Weather And Subcontractors Availability To Schedule Work. All Other Terms And Conditions Remain The Same, Including Price Of $303,164.00......Net 14........In Consideration Of The Modification Agreed To Herein As Complete Equitable Adjustment For The Contractor Silvergate Construction's Proposal For Adjustment, The Contractor Hereby Releases The Government From Any And All Liability Under This Contract For Further Equitable Adjustment Attributable To Such Facts Or Circumstances Giving Rise To The Proposal For Adjustment.......
- 7 Mar 2019
- Modification Ps0004 Is A No Cost Modification Issued To Extend The Period Of Performance Only From March 5, 2019 To March 30, 2019. This Extension Is Allowed Due To Delays Caused By Bad Weather And Subcontractors Availability To Schedule Work. All Other Terms And Conditions Remain The Same, Including Price Of $303,164.00......Net 14........In Consideration Of The Modification Agreed To Herein As Complete Equitable Adjustment For The Contractor Silvergate Construction's Proposal For Adjustment, The Contractor Hereby Releases The Government From Any And All Liability Under This Contract For Further Equitable Adjustment Attributable To Such Facts Or Circumstances Giving Rise To The Proposal For Adjustment.......
- Pbs R7 Aquisition Management
- General Services Administration (Gsa)
- $303,164.00
- General Services Administration (Gsa)
- 47PH0618P0019
- Modification Ps0002 Extends The Period Of Performance Only From 12/17/2018 To 1/14/2019. This Is A No Cost Modification Issued Due To Delay In Receipt Of Materials Needed To Complete Project. All Other Terms And Conditions Remain The Same, Including Price Of $45,566.00.....................In Consideration Of The Modification Agreed To Herein As Complete Equitable Adjustment For The Contractor Silvergate Construction's Proposal For Adjustment, The Contractor Hereby Releases The Government From Any And All Liability Under This Contract For Further Equitable Adjustment Attributable To Such Facts Or Circumstances Giving Rise To The Proposal For Adjustment........
- 20 Dec 2018
- Modification Ps0002 Extends The Period Of Performance Only From 12/17/2018 To 1/14/2019. This Is A No Cost Modification Issued Due To Delay In Receipt Of Materials Needed To Complete Project. All Other Terms And Conditions Remain The Same, Including Price Of $45,566.00.....................In Consideration Of The Modification Agreed To Herein As Complete Equitable Adjustment For The Contractor Silvergate Construction's Proposal For Adjustment, The Contractor Hereby Releases The Government From Any And All Liability Under This Contract For Further Equitable Adjustment Attributable To Such Facts Or Circumstances Giving Rise To The Proposal For Adjustment........
- Pbs R7 Aquisition Management
- General Services Administration (Gsa)
- $45,566.00
- General Services Administration (Gsa)
- 47PH0618P0020
- Paint Courtroom 302 And Adjoining Suites At The Federal Building 200 N.W. 4Th St., Oklahoma City Ok
- 9 Aug 2018
- Paint Courtroom 302 And Adjoining Suites At The Federal Building 200 N.W. 4Th St., Oklahoma City Ok
- Pbs R7 Aquisition Management
- General Services Administration (Gsa)
- $28,037.00
- General Services Administration (Gsa)
- 47PH0618P0009
- The Purpose Of This Modification Is To Extend The Period Of Performance At No Cost To The Government For Wood Floor Replace And Repair In Judge's Chambers In Office Suite 3102 Located At Oklahoma City Federal Building Us Courthouse 200 Nw 4Th Street Oklahoma City, Ok 73102
- 24 Jul 2018
- The Purpose Of This Modification Is To Extend The Period Of Performance At No Cost To The Government For Wood Floor Replace And Repair In Judge's Chambers In Office Suite 3102 Located At Oklahoma City Federal Building Us Courthouse 200 Nw 4Th Street Oklahoma City, Ok 73102
- Pbs R7 Aquisition Management
- General Services Administration (Gsa)
- $9,546.00
- General Services Administration (Gsa)
- 47PH0618P0019
- Modification Ps0001adds Additional Work On This Project Per Scope Of Work Dated 10/16/18 Attached To And Made A Part Hereof. The Total Price Is Increased From $38,745.00 To $45,566.00. The Period Of Performance Is Also Extended From 11/30/18 To 12/17/18. All Other Terms And Conditions Remain The Same.................Items Incorporated Into This Modification By Reference Are: 1. Contractor Silvergate Construction's Proposal Which Is Hereby Accepted In The Amount Of $6,821.00.................. In Consideration Of The Modification Agreed To Herein As Complete Equitable Adjustment For The Contractor Silvergate Construction's Proposal For Adjustment, The Contractor Hereby Releases The Government From Any And All Liability Under This Contract For Further Equitable Adjustment Attributable To Such Facts Or Circumstances Giving Rise To The Proposal For Adjustment......
- 28 Nov 2018
- Modification Ps0001adds Additional Work On This Project Per Scope Of Work Dated 10/16/18 Attached To And Made A Part Hereof. The Total Price Is Increased From $38,745.00 To $45,566.00. The Period Of Performance Is Also Extended From 11/30/18 To 12/17/18. All Other Terms And Conditions Remain The Same.................Items Incorporated Into This Modification By Reference Are: 1. Contractor Silvergate Construction's Proposal Which Is Hereby Accepted In The Amount Of $6,821.00.................. In Consideration Of The Modification Agreed To Herein As Complete Equitable Adjustment For The Contractor Silvergate Construction's Proposal For Adjustment, The Contractor Hereby Releases The Government From Any And All Liability Under This Contract For Further Equitable Adjustment Attributable To Such Facts Or Circumstances Giving Rise To The Proposal For Adjustment......
- Pbs R7 Aquisition Management
- General Services Administration (Gsa)
- $45,566.00
- General Services Administration (Gsa)
- 47PH0618P0009
- Contractor Shall Provide All Labor, Supervision, Materials, Supplies, Tools, And Equipment To Successfully Accomplish The Project Known As 46385 Refinish&Repair Wood Floors Inside Suite 3102, Us Courthouse Oklahoma City Federal Building 200 Nw 4Th St Oklahoma City, Ok 73102
- 7 May 2018
- Contractor Shall Provide All Labor, Supervision, Materials, Supplies, Tools, And Equipment To Successfully Accomplish The Project Known As 46385 Refinish&Repair Wood Floors Inside Suite 3102, Us Courthouse Oklahoma City Federal Building 200 Nw 4Th St Oklahoma City, Ok 73102
- Pbs R7 Aquisition Management
- General Services Administration (Gsa)
- $9,546.00
- General Services Administration (Gsa)
- 47PH0618P0012
- Modification Ps0001 Deobligates $140.00 From This Purchase Order For Work Not Completed. The Total Of This Project Is Decreased From $14,249.00 To $14,109.00. All Other Terms And Conditions Remain The Same.............In Consideration Of The Modification Agreed To Herein As Complete Equitable Adjustment For The Contractor Silvergate Construction's Proposal For Adjustment, The Contractor Hereby Releases The Government From Any And All Liability Under This Contract For Further Equitable Adjustment Attributable To Such Facts Or Circumstances Giving Rise To The Proposal For Adjustment......
- 4 Oct 2018
- Modification Ps0001 Deobligates $140.00 From This Purchase Order For Work Not Completed. The Total Of This Project Is Decreased From $14,249.00 To $14,109.00. All Other Terms And Conditions Remain The Same.............In Consideration Of The Modification Agreed To Herein As Complete Equitable Adjustment For The Contractor Silvergate Construction's Proposal For Adjustment, The Contractor Hereby Releases The Government From Any And All Liability Under This Contract For Further Equitable Adjustment Attributable To Such Facts Or Circumstances Giving Rise To The Proposal For Adjustment......
- Pbs R7 Aquisition Management
- General Services Administration (Gsa)
- $14,109.00
- General Services Administration (Gsa)