Swinerton Builders
CAGE Code: 60QW8
NCAGE Code: 60QW8
Status: Active
Type: Commercial Supplier
Dun & Bradstreet (DUNS): 962309071
Summary
Swinerton Builders is an Active Commercial Supplier with the Cage Code 60QW8 and is tracked by Dun & Bradstreet under DUNS Number 962309071..
Address
2001 Clayton Rd Fl 7Th
Concord CA 94520-2792
United States
Points of Contact
No Points of Contact...
Related Information
People who viewed this 'CAGE Code' also viewed...
Composite Engineering Inc Warrens A Educational Supplies Pyramid Technology Services Buffalo Apparatus Service Johnstone Supply Cme Lighting Supply Inc. Powersoft Corp Tripp Communication Sales Buoy Technology Inc Professional Video Engineering Maxwell Tool Sales Inc Newhall Pacific Inc Timberlab Laminators, Llc Antlab Inc Sybase Inc Vst Technologies Delphco Electronics Office Things Premenos Corp Giganet Inc
Frequently Asked Questions (FAQ) for CAGE 60QW8
- What is CAGE Code 60QW8?
- 60QW8 is the unique identifier used by NATO Organizations to reference the physical entity known as Swinerton Builders located at 2001 Clayton Rd Fl 7Th, Concord CA 94520-2792, United States.
- Who is CAGE Code 60QW8?
- 60QW8 refers to Swinerton Builders located at 2001 Clayton Rd Fl 7Th, Concord CA 94520-2792, United States.
- Where is CAGE Code 60QW8 Located?
- CAGE Code 60QW8 is located in Concord, CA, USA.
Contracting History for CAGE 60QW8 Most Recent 25 Records
- GS08P17JBC0003
- A. The Purpose Of This Modification Is To Provide All Labor, Materials, Supervision And Management Associated With Cors 89, And 103R B. The Following Items Are Hereby Incorporated Into Contract Gs-08-P-17-Jb-C-0003: -Swinerton Builders Cor #89 For $477,268.44, Dated 8/8/2018, Centrifugal Water Chiller -Swinerton Builders Cor #103R For $78,778.09, Dated 8/8/2018, Cooling Tower By-Pass C. The Contract Award Has Increased By $556,046.53 From 12,677,769.32 To $13,233,815.85 D. The Contract Period Of Performance Is Extended From December 20, 2018 To March 12, 2019 E. Contractor Statement Of Release: The Contractor Hereby Accepts The Adjustment In The Price And Performance Set Forth In This Modification As The Complete, Equitable, And Final Adjustments Authorized Herein, And Agrees That The Government Has No Further Liability Whatsoever, Directly Or Indirectly, In Regard To Any Claims, Known Or Unknown, Including Claims For Delay And/Or Disruption, For Any Additional Adjustment To The Contract.
- 19 Dec 2018
- A. The Purpose Of This Modification Is To Provide All Labor, Materials, Supervision And Management Associated With Cors 89, And 103R B. The Following Items Are Hereby Incorporated Into Contract Gs-08-P-17-Jb-C-0003: -Swinerton Builders Cor #89 For $477,268.44, Dated 8/8/2018, Centrifugal Water Chiller -Swinerton Builders Cor #103R For $78,778.09, Dated 8/8/2018, Cooling Tower By-Pass C. The Contract Award Has Increased By $556,046.53 From 12,677,769.32 To $13,233,815.85 D. The Contract Period Of Performance Is Extended From December 20, 2018 To March 12, 2019 E. Contractor Statement Of Release: The Contractor Hereby Accepts The Adjustment In The Price And Performance Set Forth In This Modification As The Complete, Equitable, And Final Adjustments Authorized Herein, And Agrees That The Government Has No Further Liability Whatsoever, Directly Or Indirectly, In Regard To Any Claims, Known Or Unknown, Including Claims For Delay And/Or Disruption, For Any Additional Adjustment To The Contract.
- Pbs R8
- General Services Administration (Gsa)
- $13,233,815.85
- General Services Administration (Gsa)
- W9128F14C0031
- Mod For Issuance Of Iip Rebate
- 20 Aug 2020
- Mod For Issuance Of Iip Rebate
- W071 Endist Omaha
- Department Of Defense (Dod)
- $60,737,363.35
- Department Of Defense (Dod)
- NNA17BF66C
- Igf::Ot::Igf Solicitation For Construction Of Ames Biosciences Collaborative Facility.
- 25 May 2017
- Igf::Ot::Igf Solicitation For Construction Of Ames Biosciences Collaborative Facility.
- Nasa Ames Research Center
- National Aeronautics And Space Administration (Nasa)
- $0.00
- National Aeronautics And Space Administration (Nasa)
- GS08P17JBC0003
- A. The Purpose Of This Modification Is To Provide All Labor, Materials, Supervision And Management Associated With Cors 82, 91, 96, 97, 115, 119, 120, 121, 122, 123, 124, 125, 126, 127, 128, 129, 131, 134, 136, 137, 138, 140 And 4B. B. The Following Items Are Hereby Incorporated Into Contract Gs-08-P-17-Jb-C-0003: -Swinerton Builders Cor #82 For $100,424.50, Dated 8/7/2018, Swing Space Changes -Swinerton Builders Cor #91 For $13,136.90, Dated 8/22/2018, 1C-425 Gas Cabinet Exhaust -Swinerton Builders Cor #96 For $9,495.90, Dated 6/13/2018, Dual Body Valves -Swinerton Builders Cor #97 For $12,082.90, Dated 6/13/2018, Swagelok -Swinerton Builders Cor #115 For $26,922.00, Dated 8/1/2018, Pdc Duct And Grds -Swinerton Builders Cor #119 For $6,826.00, Dated 8/1/2018, Grds In 1C-520, 1C-120, 1C-060 -Swinerton Builders Cor #120 For $17,550.94, Dated 8/3/2018, Aw And Av For 1C-325 -Swinerton Builders Cor #121 For $4,313.00, Dated 8/22/2018, Fcu-6 Reroute Piping -Swinerton Builders Cor #122 Or $3,275.00, Dated 8/2/2018, Dampers, Curb, Backflow Rodi -Swinerton Builders Cor #123 For $9,673.00, Dated 8/2/2018, Phoenix Valve Changes -Swinerton Builders Cor #124 For $11,808.00, Dated 8/14/2018, Controllers And Ethernet -Swinerton Builders Cor #125 For $10,631.00, Dated 8/14/2018, Exhaust Vfds And Conduit -Swinerton Builders Cor #126 For $15,364.00, Dated 8/14/2018, Ph 2 Elec And 1C-045 Uc Lighting -Swinerton Builders Cor #127 For $2,929.00, Dated 8/17/2018, Electrical Revisions -Swinerton Builders Cor #128 For $14,459.00, Dated 8/20/2018, Mech Trap Primers -Swinerton Builders Cor #129 For $6,710.00, Dated 8/20/2018, 1C-085 Bsc-01 Power, 1C-630 E/W -Swinerton Builders Cor #131 For $3,557.00, Dated 8/26/2018, Ro Equip Line Voltage Power -Swinerton Builders Cor #134 For $4,991.00, Dated 8/28/2018, Power Bcu-1404, Vf-1401, Ngen 04 -Swinerton Builders Cor #136 For $5,165.66, Dated 9/1/2018, Wire Mold/Cabinets 1C-060 -Swinerton Builders Cor #137 For $3,777.00, Dated 9/1/2018, Wire Molds/Lights 1C-425 -Swinerton Builders Cor #138 For $4,411.00, Dated 12/17/2018, Countertop Eyewash -Swinerton Builders Cor #140 For $10,068.46, Dated 9/5/2018, Door Sweeps -Swinerton Builders Cor #4B For -$11,572.41, Dated 8/17/2018, Deletion Ewh-44 And Et-2 C. The Contract Award Has Increased By $285,998.85 From $13,233,815.85 To $13,519,814.70 D. The Contract Period Of Performance Remains Unchanged At March 12, 2019 E. Contractor Statement Of Release: The Contractor Hereby Accepts This Modification Ps-18 As Complete Equitable Adjustments And Full And Final Satisfaction For The Change Order Requests Addressed With This Modification No. Ps-18. The Contractor Hereby Releases The Government From Any And All Future Requests For Equitable Adjustments Or Claims Whatsoever, Known Or Unknown, Related To The Change Order Requests Addressed Herein. The Parties Agree That No Additional Adjustments To The Contract For This Work Will Be Made
- 11 Apr 2019
- A. The Purpose Of This Modification Is To Provide All Labor, Materials, Supervision And Management Associated With Cors 82, 91, 96, 97, 115, 119, 120, 121, 122, 123, 124, 125, 126, 127, 128, 129, 131, 134, 136, 137, 138, 140 And 4B. B. The Following Items Are Hereby Incorporated Into Contract Gs-08-P-17-Jb-C-0003: -Swinerton Builders Cor #82 For $100,424.50, Dated 8/7/2018, Swing Space Changes -Swinerton Builders Cor #91 For $13,136.90, Dated 8/22/2018, 1C-425 Gas Cabinet Exhaust -Swinerton Builders Cor #96 For $9,495.90, Dated 6/13/2018, Dual Body Valves -Swinerton Builders Cor #97 For $12,082.90, Dated 6/13/2018, Swagelok -Swinerton Builders Cor #115 For $26,922.00, Dated 8/1/2018, Pdc Duct And Grds -Swinerton Builders Cor #119 For $6,826.00, Dated 8/1/2018, Grds In 1C-520, 1C-120, 1C-060 -Swinerton Builders Cor #120 For $17,550.94, Dated 8/3/2018, Aw And Av For 1C-325 -Swinerton Builders Cor #121 For $4,313.00, Dated 8/22/2018, Fcu-6 Reroute Piping -Swinerton Builders Cor #122 Or $3,275.00, Dated 8/2/2018, Dampers, Curb, Backflow Rodi -Swinerton Builders Cor #123 For $9,673.00, Dated 8/2/2018, Phoenix Valve Changes -Swinerton Builders Cor #124 For $11,808.00, Dated 8/14/2018, Controllers And Ethernet -Swinerton Builders Cor #125 For $10,631.00, Dated 8/14/2018, Exhaust Vfds And Conduit -Swinerton Builders Cor #126 For $15,364.00, Dated 8/14/2018, Ph 2 Elec And 1C-045 Uc Lighting -Swinerton Builders Cor #127 For $2,929.00, Dated 8/17/2018, Electrical Revisions -Swinerton Builders Cor #128 For $14,459.00, Dated 8/20/2018, Mech Trap Primers -Swinerton Builders Cor #129 For $6,710.00, Dated 8/20/2018, 1C-085 Bsc-01 Power, 1C-630 E/W -Swinerton Builders Cor #131 For $3,557.00, Dated 8/26/2018, Ro Equip Line Voltage Power -Swinerton Builders Cor #134 For $4,991.00, Dated 8/28/2018, Power Bcu-1404, Vf-1401, Ngen 04 -Swinerton Builders Cor #136 For $5,165.66, Dated 9/1/2018, Wire Mold/Cabinets 1C-060 -Swinerton Builders Cor #137 For $3,777.00, Dated 9/1/2018, Wire Molds/Lights 1C-425 -Swinerton Builders Cor #138 For $4,411.00, Dated 12/17/2018, Countertop Eyewash -Swinerton Builders Cor #140 For $10,068.46, Dated 9/5/2018, Door Sweeps -Swinerton Builders Cor #4B For -$11,572.41, Dated 8/17/2018, Deletion Ewh-44 And Et-2 C. The Contract Award Has Increased By $285,998.85 From $13,233,815.85 To $13,519,814.70 D. The Contract Period Of Performance Remains Unchanged At March 12, 2019 E. Contractor Statement Of Release: The Contractor Hereby Accepts This Modification Ps-18 As Complete Equitable Adjustments And Full And Final Satisfaction For The Change Order Requests Addressed With This Modification No. Ps-18. The Contractor Hereby Releases The Government From Any And All Future Requests For Equitable Adjustments Or Claims Whatsoever, Known Or Unknown, Related To The Change Order Requests Addressed Herein. The Parties Agree That No Additional Adjustments To The Contract For This Work Will Be Made
- Pbs R8
- General Services Administration (Gsa)
- $13,519,814.70
- General Services Administration (Gsa)
- W9128A16C0004
- Parking Structure; Igf::Ot::Igf
- 28 Mar 2018
- Parking Structure; Igf::Ot::Igf
- W2sn Endist Honolulu
- Department Of Defense (Dod)
- $26,932,366.40
- Department Of Defense (Dod)
- W9128A16C0004
- Parking Structure; Igf::Ot::Igf
- 18 Jul 2018
- Parking Structure; Igf::Ot::Igf
- W2sn Endist Honolulu
- Department Of Defense (Dod)
- $26,797,926.40
- Department Of Defense (Dod)
- W9128A16C0004
- Parking Structure; Igf::Ot::Igf
- 25 Jul 2018
- Parking Structure; Igf::Ot::Igf
- W2sn Endist Honolulu
- Department Of Defense (Dod)
- $26,797,926.40
- Department Of Defense (Dod)
- W9128A16C0004
- Parking Structure; Igf::Ot::Igf
- 15 Jan 2019
- Parking Structure; Igf::Ot::Igf
- Us Army Engineer District Hawaii
- Department Of Defense (Dod)
- $27,144,613.40
- Department Of Defense (Dod)
- W9128A16C0004
- Parking Structure; Igf::Ot::Igf
- 19 Jul 2018
- Parking Structure; Igf::Ot::Igf
- W2sn Endist Honolulu
- Department Of Defense (Dod)
- $26,797,926.40
- Department Of Defense (Dod)
- W9123814C0046
- R23/A22 Fire Alarm Notification Appliance Additions, Construct Dcgs (Inside 5Ft Line)
- 17 Apr 2018
- R23/A22 Fire Alarm Notification Appliance Additions, Construct Dcgs (Inside 5Ft Line)
- W075 Endist Sacramento
- Department Of Defense (Dod)
- $56,454,830.73
- Department Of Defense (Dod)
- GS08P17JBC0003
- Change Contracting Officer From Len Wilson To Shannon Sweeney
- 28 Jul 2023
- Change Contracting Officer From Len Wilson To Shannon Sweeney
- Pbs R8
- General Services Administration (Gsa)
- $14,130,396.98
- General Services Administration (Gsa)
- GS08P17JBC0003
- Igf::Ot::Igf For Other Functions. No Cost Time Extension For The B25 Epa Colocation Project At The Denver Federal Center, Denver, Co.
- 17 May 2018
- Igf::Ot::Igf For Other Functions. No Cost Time Extension For The B25 Epa Colocation Project At The Denver Federal Center, Denver, Co.
- Pbs R8
- General Services Administration (Gsa)
- $12,207,621.30
- General Services Administration (Gsa)
- GS08P17JBC0003
- A. The Purpose Of This Modification Is To Provide All Labor, Materials, Supervision And Management Associated With Cors 105, 108, 111, 112, 113, 114, 116, And 133R B. The Following Items Are Hereby Incorporated Into Contract Gs-08-P-17-Jb-C-0003: -Swinerton Builders Cor #105 For $2,391.00, Dated 7/11/2018, Drywall Repair And Soffit (Cobs 13, 17R1, 19) -Swinerton Builders Cor #108 For $7,660.00, Dated 7/24/2018, Condensate Hub Drain Locations For Fcus -Swinerton Builders Cor #111 For $29,177.70, Dated 7/26/2018, Deionized Water Piping Sizes In Phase 2 Labs -Swinerton Builders Cor #112 For $11,295.90, Dated 7/31/2018, Re-Routed Plumbing -Swinerton Builders Cor #113 For $5,298.00, Dated 7/31/2018, Misc Additional Piping -Swinerton Builders Cor #114 For $5,763.00, Dated 7/31/2018, Control Of Existing Phx Valves -Swinerton Builders Cor #116 For $9,277.00, Dated 8/9/2018, Fume Hood Revisions -Swinerton Builders Cor #133R For $24,007.00, Dated 8/30/2018, Lightning Protection C. The Contract Award Has Increased By $94,869.60 From $12,582,899.72 To $12,677,769.32 D. The Contract Period Of Performance Remains October 3, 2018. E. Contractor Statement Of Release: The Contractor Hereby Accepts The Adjustment In The Price And Performance Set Forth In This Modification As The Complete, Equitable, And Final Adjustments Authorized Herein, And Agrees That The Government Has No Further Liability Whatsoever, Directly Or Indirectly, In Regard To Any Claims, Known Or Unknown, Including Claims For Delay And/Or Disruption, For Any Additional Adjustment To The Contract.
- 25 Sep 2018
- A. The Purpose Of This Modification Is To Provide All Labor, Materials, Supervision And Management Associated With Cors 105, 108, 111, 112, 113, 114, 116, And 133R B. The Following Items Are Hereby Incorporated Into Contract Gs-08-P-17-Jb-C-0003: -Swinerton Builders Cor #105 For $2,391.00, Dated 7/11/2018, Drywall Repair And Soffit (Cobs 13, 17R1, 19) -Swinerton Builders Cor #108 For $7,660.00, Dated 7/24/2018, Condensate Hub Drain Locations For Fcus -Swinerton Builders Cor #111 For $29,177.70, Dated 7/26/2018, Deionized Water Piping Sizes In Phase 2 Labs -Swinerton Builders Cor #112 For $11,295.90, Dated 7/31/2018, Re-Routed Plumbing -Swinerton Builders Cor #113 For $5,298.00, Dated 7/31/2018, Misc Additional Piping -Swinerton Builders Cor #114 For $5,763.00, Dated 7/31/2018, Control Of Existing Phx Valves -Swinerton Builders Cor #116 For $9,277.00, Dated 8/9/2018, Fume Hood Revisions -Swinerton Builders Cor #133R For $24,007.00, Dated 8/30/2018, Lightning Protection C. The Contract Award Has Increased By $94,869.60 From $12,582,899.72 To $12,677,769.32 D. The Contract Period Of Performance Remains October 3, 2018. E. Contractor Statement Of Release: The Contractor Hereby Accepts The Adjustment In The Price And Performance Set Forth In This Modification As The Complete, Equitable, And Final Adjustments Authorized Herein, And Agrees That The Government Has No Further Liability Whatsoever, Directly Or Indirectly, In Regard To Any Claims, Known Or Unknown, Including Claims For Delay And/Or Disruption, For Any Additional Adjustment To The Contract.
- Pbs R8
- General Services Administration (Gsa)
- $12,677,769.32
- General Services Administration (Gsa)
- GS08P17JBC0003
- Igf::Ot::Igf For Other Functions. Modification For Epa Consolidation Project At Building 25, Denver Federal Center, Denver, Co.
- 11 Jun 2018
- Igf::Ot::Igf For Other Functions. Modification For Epa Consolidation Project At Building 25, Denver Federal Center, Denver, Co.
- Pbs R8
- General Services Administration (Gsa)
- $12,207,621.30
- General Services Administration (Gsa)
- N4425515C6001
- Mod To Incorporate Various Changes
- 19 Dec 2017
- Mod To Incorporate Various Changes
- Navfac Northwest
- Department Of Defense (Dod)
- $28,320,418.10
- Department Of Defense (Dod)
- GS08P17JBC0003
- A. The Purpose Of This Modification Is To Provide All Labor, Materials, Supervision And Management Associated With Cors 104R3, 107R, 130, 132, 145, 146, 151, 153, 159, 160, 161, 163, 165, 167, 168, 187, 188, 189, 191. B. The Following Items Are Hereby Incorporated Into Contract Gs-08-P-17-Jb-C-0003: -Swinerton Builders Cor #104R3 For $4,564.00, Dated 12/28/2018, 1C-325 Revisions -Swinerton Builders Cor #107R For $14,612.00, Dated 7/20/2018, Lightning Protection - Epa Area -Swinerton Builders Cor #130 For $985.01, Dated 8/20/2018, Ramps For Ewh Drain -Swinerton Builders Cor #132 For $21,150.00, Dated 12/7/2018, 1A-265 Fume Hood Outlets -Swinerton Builders Cor #145 For $2,399.14, Dated 12/18/2018, 1C-340 Door, Hard Lid Ceiling; 1C-325 Patching/Furring -Swinerton Builders Cor #146 For $9,031.00, Dated 12/20/2018, Electrical Changes 1C-420/1C-520 -Swinerton Builders Cor #151 For $1,469.00, Dated 12/28/2018, Ph 1 Life Safety Jha Punch -Swinerton Builders Cor #153 For $1,368.00, Dated 12/28/2018, Power For Condensate Pumps Fcu-6,7 -Swinerton Builders Cor #159 Or $6,188.50, Dated 1/3/2019, Lighting Controls 1A-245 -Swinerton Builders Cor #160 For $2,860.00, Dated 1/3/2019, Duct Drop Re-Work In 1C-520 -Swinerton Builders Cor #161 For $2,313.00, Dated 1/4/2019, Power For Fcu In 1C-520 -Swinerton Builders Cor #163 For $1,329.00, Dated 1/4/2019, Condensate Pump For Fcu In 1C-420 -Swinerton Builders Cor #165 For $2,612.00, Dated 1/4/2019, 1C-340 Electrical Clarifications -Swinerton Builders Cor #167 For $14,271.00, Dated 1/4/2019, Transformers For Mech Controls (Ph 3) -Swinerton Builders Cor #168 For $25,403.75, Dated 1/5/2019, Esat Move -Swinerton Builders Cor #187 For $1,458.00, Dated 1/24/2019, Ph 2 Epa Fire Marshal Punch List -Swinerton Builders Cor #188 For $13,529.00, Dated 1/24/2019, Plumbing Changes 1C-340, 1C-425 -Swinerton Builders Cor #189 For $17,837.00, Dated 1/24/2019, 1C-420 Electrical Revisions -Swinerton Builders Cor #191 For $5,030.27, Dated 1/25/2019, Rebar Inspections And Testing C. The Contract Award Has Increased By $148,409.67 From $ 13,519,814.70 To $13,668,224.37 D. The Contract Period Of Performance Remains Unchanged At March 12, 2019 E. Contractor Statement Of Release: The Contractor Hereby Accepts This Modification Ps-19 As Complete Equitable Adjustments And Full And Final Satisfaction For The Change Order Requests Addressed With This Modification No. Ps-19. The Contractor Hereby Releases The Government From Any And All Future Requests For Equitable Adjustments Or Claims Whatsoever, Known Or Unknown, Related To The Change Order Requests Addressed Herein. The Parties Agree That No Additional Adjustments To The Contract For This Work Will Be Made.
- 6 Jun 2019
- A. The Purpose Of This Modification Is To Provide All Labor, Materials, Supervision And Management Associated With Cors 104R3, 107R, 130, 132, 145, 146, 151, 153, 159, 160, 161, 163, 165, 167, 168, 187, 188, 189, 191. B. The Following Items Are Hereby Incorporated Into Contract Gs-08-P-17-Jb-C-0003: -Swinerton Builders Cor #104R3 For $4,564.00, Dated 12/28/2018, 1C-325 Revisions -Swinerton Builders Cor #107R For $14,612.00, Dated 7/20/2018, Lightning Protection - Epa Area -Swinerton Builders Cor #130 For $985.01, Dated 8/20/2018, Ramps For Ewh Drain -Swinerton Builders Cor #132 For $21,150.00, Dated 12/7/2018, 1A-265 Fume Hood Outlets -Swinerton Builders Cor #145 For $2,399.14, Dated 12/18/2018, 1C-340 Door, Hard Lid Ceiling; 1C-325 Patching/Furring -Swinerton Builders Cor #146 For $9,031.00, Dated 12/20/2018, Electrical Changes 1C-420/1C-520 -Swinerton Builders Cor #151 For $1,469.00, Dated 12/28/2018, Ph 1 Life Safety Jha Punch -Swinerton Builders Cor #153 For $1,368.00, Dated 12/28/2018, Power For Condensate Pumps Fcu-6,7 -Swinerton Builders Cor #159 Or $6,188.50, Dated 1/3/2019, Lighting Controls 1A-245 -Swinerton Builders Cor #160 For $2,860.00, Dated 1/3/2019, Duct Drop Re-Work In 1C-520 -Swinerton Builders Cor #161 For $2,313.00, Dated 1/4/2019, Power For Fcu In 1C-520 -Swinerton Builders Cor #163 For $1,329.00, Dated 1/4/2019, Condensate Pump For Fcu In 1C-420 -Swinerton Builders Cor #165 For $2,612.00, Dated 1/4/2019, 1C-340 Electrical Clarifications -Swinerton Builders Cor #167 For $14,271.00, Dated 1/4/2019, Transformers For Mech Controls (Ph 3) -Swinerton Builders Cor #168 For $25,403.75, Dated 1/5/2019, Esat Move -Swinerton Builders Cor #187 For $1,458.00, Dated 1/24/2019, Ph 2 Epa Fire Marshal Punch List -Swinerton Builders Cor #188 For $13,529.00, Dated 1/24/2019, Plumbing Changes 1C-340, 1C-425 -Swinerton Builders Cor #189 For $17,837.00, Dated 1/24/2019, 1C-420 Electrical Revisions -Swinerton Builders Cor #191 For $5,030.27, Dated 1/25/2019, Rebar Inspections And Testing C. The Contract Award Has Increased By $148,409.67 From $ 13,519,814.70 To $13,668,224.37 D. The Contract Period Of Performance Remains Unchanged At March 12, 2019 E. Contractor Statement Of Release: The Contractor Hereby Accepts This Modification Ps-19 As Complete Equitable Adjustments And Full And Final Satisfaction For The Change Order Requests Addressed With This Modification No. Ps-19. The Contractor Hereby Releases The Government From Any And All Future Requests For Equitable Adjustments Or Claims Whatsoever, Known Or Unknown, Related To The Change Order Requests Addressed Herein. The Parties Agree That No Additional Adjustments To The Contract For This Work Will Be Made.
- Pbs R8
- General Services Administration (Gsa)
- $13,668,224.37
- General Services Administration (Gsa)
- W9128A16C0004
- Parking Structure; Igf::Ot::Igf
- 27 Feb 2019
- Parking Structure; Igf::Ot::Igf
- Us Army Engineer District Hawaii
- Department Of Defense (Dod)
- $27,144,613.40
- Department Of Defense (Dod)
- GS08P17JBC0003
- Igf::Ot::Igf For Other Functions. Administrative Modification To Obligate Funds That Was Erroneously Excluded On The Previous Modification (Ps12) For The Epa Colocation Project At Building 25, Denver Federal Center, Colorado.
- 3 Jul 2018
- Igf::Ot::Igf For Other Functions. Administrative Modification To Obligate Funds That Was Erroneously Excluded On The Previous Modification (Ps12) For The Epa Colocation Project At Building 25, Denver Federal Center, Colorado.
- Pbs R8
- General Services Administration (Gsa)
- $12,455,557.25
- General Services Administration (Gsa)
- W9123814C0046
- Igf::Ot::Igf Construct Dcgs (Inside 5Ft Line)
- 14 May 2018
- Igf::Ot::Igf Construct Dcgs (Inside 5Ft Line)
- W075 Endist Sacramento
- Department Of Defense (Dod)
- $56,454,830.73
- Department Of Defense (Dod)
- W9128A16C0004
- Parking Structure; Igf::Ot::Igf
- 25 May 2018
- Parking Structure; Igf::Ot::Igf
- W2sn Endist Honolulu
- Department Of Defense (Dod)
- $26,851,926.40
- Department Of Defense (Dod)
- N4425515C6001
- Igf::Ot::Igf Mod For Rea Amine Blush And Wage Det
- 30 Apr 2018
- Igf::Ot::Igf Mod For Rea Amine Blush And Wage Det
- Navfac Northwest
- Department Of Defense (Dod)
- $28,320,418.10
- Department Of Defense (Dod)
- W9128A16C0004
- Parking Structure; Igf::Ot::Igf
- 26 Mar 2018
- Parking Structure; Igf::Ot::Igf
- W2sn Endist Honolulu
- Department Of Defense (Dod)
- $26,932,366.40
- Department Of Defense (Dod)
- GS08P17JBC0003
- Administrative Mod To Fix Allocation Of Funds Coding
- 22 Oct 2021
- Administrative Mod To Fix Allocation Of Funds Coding
- Pbs R8
- General Services Administration (Gsa)
- $14,130,396.98
- General Services Administration (Gsa)
- DOCSB134116CN0010
- No Cost Time Extension And Final Negotiation With Consideration With Add Utilities Building 3 (Glycol System).
- 22 Sep 2018
- No Cost Time Extension And Final Negotiation With Consideration With Add Utilities Building 3 (Glycol System).
- Dept Of Commerce Nist
- Department Of Commerce (Doc)
- $18,101,636.14
- Department Of Commerce (Doc)
- W9128A16C0004
- Parking Structure:
- 16 Jul 2019
- Parking Structure:
- Us Army Engineer District Hawaii
- Department Of Defense (Dod)
- $27,173,094.40
- Department Of Defense (Dod)