Eddie Lopez Construction Llc

CAGE Code: 5Z4Z3

NCAGE Code: 5Z4Z3

Status: Discontinued

Type: Commercial Supplier

Dun & Bradstreet (DUNS): 962244898

Summary

Eddie Lopez Construction Llc is a Discontinued Commercial Supplier with the Cage Code 5Z4Z3 and is tracked by Dun & Bradstreet under DUNS Number 962244898..

Address

802 N 300 W
Hurricane UT 84737-2055
United States

Points of Contact

No Points of Contact...

Related Information

Associated CAGE Codes People who viewed this 'CAGE Code' also viewed...

CAGE Code FAQ Frequently Asked Questions (FAQ) for CAGE 5Z4Z3

What is CAGE Code 5Z4Z3?
5Z4Z3 is the unique identifier used by NATO Organizations to reference the physical entity known as Eddie Lopez Construction Llc located at 802 N 300 W, Hurricane UT 84737-2055, United States.
Who is CAGE Code 5Z4Z3?
5Z4Z3 refers to Eddie Lopez Construction Llc located at 802 N 300 W, Hurricane UT 84737-2055, United States.
Where is CAGE Code 5Z4Z3 Located?
CAGE Code 5Z4Z3 is located in Hurricane, UT, USA.

Contracting History for CAGE 5Z4Z3 Contracting History for CAGE 5Z4Z3 Most Recent 25 Records

INP17PX02545
X:Nogrn, Supply, Electric Power Supply System For Use At Great Basin.
16 Aug 2017
Pwr Lame(81000)
Department Of The Interior (Doi)
$19,817.00
INL17PC00006
Igf::Ot::Igf Paria Contact Station Remodel
5 Sep 2018
Bureau Of Land Managment
Department Of The Interior (Doi)
$172,229.94
1284N818C0009
Igf::Ot::Igf Moon Lake Guard Station Reroof This Project Includes All Requirements And Necessary Construction To Replace A Failing Roof Systems On The Moon Lake Guard Station On The Ashley National Forest. Award Is As Follows: Mobilization @ $2,800.00 Roof Demolition And Disposal @ $2,200.00 Supply And Installation Of Peel And Stick Membrane And Roof Felt @ $2,100.00 Supply And Install Metal Roof, Etc. @ $5,900.00 Total Of Award: $13,000.00 Contract To Start During Summer Of 2018 Period Of Performance: 45 Calendar Days After Issuance Of Notice To Proceed Contract End Date: November 30, 2018 Project Cor: Lance Valentine Phone: 435.781.5113 .
17 May 2018
Usda Forest Service
Department Of Agriculture (Usda)
$13,000.00
INP17PC00291
Cedar Breaks Picnic Pavilion Purpose Of This Modification Is To Deobligate This Contract In Its Entirety And Close Out. The Contractor Has Gone Out Of Business And Will Not Complete This Project.
29 May 2019
Imr Intermountain Region(1200)
Department Of The Interior (Doi)
$257,924.84
INP17PC00542
Zion Lodge Motel A-Upper Remodel Vanity Igf::Ot::Igf:: Purpose Of This Modification Is To Deobligate $800.55 For Tile That Has Been Discontinued. All Are In Agreement To Omit The Tile Work From This Contract, Which Is A Deduct Of $800.55. All Other Work Has Been Completed.
8 Feb 2019
Imr Intermountain Region(1200)
Department Of The Interior (Doi)
$233,551.45
DTFH6814C00015
De-Obligate And Close Out Mod.
19 Aug 2020
6982Af Central Federal Lands Divisi
Department Of Transportation (Dot)
$3,592,505.65
DTFH6814C00015
This Mod Was Created Erroneously During The Closeout Process And Should Be Disregarded.
19 Aug 2020
6982Af Central Federal Lands Divisi
Department Of Transportation (Dot)
$3,592,505.65
INP17PC00291
Cebr: Picnic Pavilion Project Igf::Ot::Igf:: Purpose Of This Modification Is To Extend The Period Of Performance To 9/6/2019. This Extension Is Due To A Seasonal Shutdown Per H.14 Of The Contract Clauses. Work Is Expected To Resume On 6/3/2019. Modification To The Scope Of Work P17pc00291 As Follows: The Restroom Building With Two Unisex Stalls Will Be Changed From Flush Toilets To Vault Toilets. A Stand-Alone Water Fountain Will Be Installed Near The Restroom Building. This Modification Covers The Cost Of Installing An Aba Accessible, Winterizable Drinking Fountain $4500.00. Changes To The Work Can Be Summarized With The Following: Current: Original Contract Called For Completing Wastewater Line By Installing 11 Cleanouts Encased In A Valve Box Below Grade. New: Complete Wastewater Line With A Cap And Detection Metal 18 Below Grade (No Valve Box, No Threaded Plug). Current: Original Contract Required Providing Utility Trenching For Rocky Mountain Power From The Designated Junction Box To The Power Pole. This Included 240 Feet Along The Road Way, 50 Feet Trenched Through The Campground Road, And 290 Feet Through A Meadow. This Is A Total Of 580 Feet Of Trenching. New: Complete No Trenching For Rocky Mountain Power. Current: Provide (12) Rab Wpled10 Lighting Fixtures Installed On A Waterproof Switch In The Picnic Pavilion Per Pavilion Construction Drawings. New: Provide No Lighting For Picnic Pavilion. Current: Provide (2) Gfci Protected Outlets On Opposite Corners Of The Pavilion, And One At The Fireplace (Only If Required For Approved Fireplace Design). New: Gfci Outlets To Remain. Current: Provide A Fuel Efficient, Wood Burning Fireplace Insert To Be Decided New: Provide Approved Wood Burning Fireplace (Insert Or Otherwise) Proportioned To The Approved Fireplace Design (Approximate Size: 32Inch High X 42Inch Wide). Provide A Fire Screen Or Other Approved Method To Keep Embers In The Fireplace. Current: Run Power From Junction Box&Meter By Others (See Original Bid Drawings Sheet 3) To 200 Amp Service Panel (Furnished By Mountain West Precast) On Back Of Restroom Building. Run Power From Restroom Building To The Picnic Pavilion Through Installed Conduit. Connect Power For Restroom Building Through Proper Breakers. Provide Empty Conduit Connecting The Service Panel To The Existing Electrical Conduit Bordering The Existing Trail (See Sheet 3 Of Original Bid Drawings). Provide Code Required Grounding, And Connections. New: The Existing Conduit Bordering The Existing Trail Has A 2/0 2/0 -1 Al Wire Providing Power To A Cross Walk Approximately 730 Feet Away From The Restroom Building. Connect Power From This Existing Wire To The Service Panel On The Back Of The Restroom Building, Through The Previously Empty Conduit Mentioned Above. Run Power From Service Panel To The Picnic Pavilion. Connect The Existing Power For The Cross Walk At The Service Panel To Operate The Same As Before The New Power Connection. Provide Code Required Grounding And Connections. Cap And Bury Installed Conduit At Junction Box By Others (For Future Connection). Current: Provide Water And Wastewater Supplied To The New Restroom Building To Include An Aba Accessible Drinking Fountain. New: Do Not Provide Water Or Wastewater To The Restroom Building. Install A Stand-Alone Drinking Fountain: Mostdependable.Com Model 440 Smss Or Approved Equal With The Following Options Included: Seasonal Covers, Cut Off Valve And Low Point Drain, Unattached Valve Box, And Recessed Hose Bibb And Locking Door. The Fountain Will Be Installed With The Shutoff Valve And Drain Valve Below The Frost Line. Provide Manufacturer Approved Drain Line. Current: Prepare Site For Concrete Restroom Building Including Placement Of Water, Wastewater, And Electric. Prepare Building Site With Sub Material Per Manufacturers Instructions. New: Prepare Site For Concrete Vault Toilet Building. Excavate And Prepare B
17 Oct 2018
Imr Intermountain Region(1200)
Department Of The Interior (Doi)
$278,320.00
INP17PC00291
Cebr: Picnic Pavilion Project Igf::Ot::Igf:: Modification To The Scope Of Work P17pc00291 As Follows: The Restroom Building With Two Unisex Stalls Will Be Changed From Flush Toilets To Vault Toilets. A Stand-Alone Water Fountain Will Be Installed Near The Restroom Building. This Modification Covers The Cost Of Installing An Aba Accessible, Winterizable Drinking Fountain $4500.00. Changes To The Work Can Be Summarized With The Following: Current: Original Contract Called For Completing Wastewater Line By Installing 11 Cleanouts Encased In A Valve Box Below Grade. New: Complete Wastewater Line With A Cap And Detection Metal 18 Below Grade (No Valve Box, No Threaded Plug). Current: Original Contract Required Providing Utility Trenching For Rocky Mountain Power From The Designated Junction Box To The Power Pole. This Included 240 Feet Along The Road Way, 50 Feet Trenched Through The Campground Road, And 290 Feet Through A Meadow. This Is A Total Of 580 Feet Of Trenching. New: Complete No Trenching For Rocky Mountain Power. Current: Provide (12) Rab Wpled10 Lighting Fixtures Installed On A Waterproof Switch In The Picnic Pavilion Per Pavilion Construction Drawings. New: Provide No Lighting For Picnic Pavilion. Current: Provide (2) Gfci Protected Outlets On Opposite Corners Of The Pavilion, And One At The Fireplace (Only If Required For Approved Fireplace Design). New: Gfci Outlets To Remain. Current: Provide A Fuel Efficient, Wood Burning Fireplace Insert To Be Decided New: Provide Approved Wood Burning Fireplace (Insert Or Otherwise) Proportioned To The Approved Fireplace Design (Approximate Size: 32Inch High X 42Inch Wide). Provide A Fire Screen Or Other Approved Method To Keep Embers In The Fireplace. Current: Run Power From Junction Box&Meter By Others (See Original Bid Drawings Sheet 3) To 200 Amp Service Panel (Furnished By Mountain West Precast) On Back Of Restroom Building. Run Power From Restroom Building To The Picnic Pavilion Through Installed Conduit. Connect Power For Restroom Building Through Proper Breakers. Provide Empty Conduit Connecting The Service Panel To The Existing Electrical Conduit Bordering The Existing Trail (See Sheet 3 Of Original Bid Drawings). Provide Code Required Grounding, And Connections. New: The Existing Conduit Bordering The Existing Trail Has A 2/0 2/0 -1 Al Wire Providing Power To A Cross Walk Approximately 730 Feet Away From The Restroom Building. Connect Power From This Existing Wire To The Service Panel On The Back Of The Restroom Building, Through The Previously Empty Conduit Mentioned Above. Run Power From Service Panel To The Picnic Pavilion. Connect The Existing Power For The Cross Walk At The Service Panel To Operate The Same As Before The New Power Connection. Provide Code Required Grounding And Connections. Cap And Bury Installed Conduit At Junction Box By Others (For Future Connection). Current: Provide Water And Wastewater Supplied To The New Restroom Building To Include An Aba Accessible Drinking Fountain. New: Do Not Provide Water Or Wastewater To The Restroom Building. Install A Stand-Alone Drinking Fountain: Mostdependable.Com Model 440 Smss Or Approved Equal With The Following Options Included: Seasonal Covers, Cut Off Valve And Low Point Drain, Unattached Valve Box, And Recessed Hose Bibb And Locking Door. The Fountain Will Be Installed With The Shutoff Valve And Drain Valve Below The Frost Line. Provide Manufacturer Approved Drain Line. Current: Prepare Site For Concrete Restroom Building Including Placement Of Water, Wastewater, And Electric. Prepare Building Site With Sub Material Per Manufacturers Instructions. New: Prepare Site For Concrete Vault Toilet Building. Excavate And Prepare Bedding Material Per Manufacturers Instructions. Compact Backfill Against The Building To 95% Compaction.
28 Aug 2018
Imr Intermountain Region(1200)
Department Of The Interior (Doi)
$278,320.00
DTFH6814C00015
Administrative Mod To Correct Funding/Line Of Accounting Errors That Were Issued Per Mod 1. Date Signed Above Is The Executed Date Of Mod 1. Lk
31 Jul 2014
Central Federal Lands Highway Division
Department Of Transportation (Dot)
$3,759,052.35
INL17PC00006
Igf::Ot::Igf Paria Contact Station Remodel
23 May 2018
Bureau Of Land Managment
Department Of The Interior (Doi)
$172,230.00
1284N818C0014
Igf::Ot::Igf Spillway Toilet Reroofing; Spillway Restroom Roof Replacement This Project Includes All Requirements And Necessary Construction To Replace A Failing Roof Systems On The Spillway Restroom, On The Green River, On The Ashley National Forest. Construction Work Includes The Following: 1. Remove And Dispose Of Existing Roof Materials According To Drawings And Specifications. 2. Install New Peel And Stick Membrane At The Roof Perimeter And #30 Roofing Felt Over Entire Roofs. 3. Install Metal Roof Panels W/ Slip Sheet And Trim According To Drawings And Specifications. Provide And Install Incidental Roof Trim And Gutters To Provide A Complete Roof Assembly. 4. Provide And Install New Roof Ridge Vent. 5. Provide And Install New Exhaust Stack, Per Photos And Drawings. 6. Remove, Protect, And Reinstall The Existing Solar Panel And Mount On The New Roof. Contract Time: 45 Calendar Days Cor: Lance Valentine Phone: 435.781.5113
14 Jun 2018
Usda Forest Service
Department Of Agriculture (Usda)
$11,400.00
1284N818C0010
Igf::Ot::Igf Red Canyon Vc Paint Exterior This Project Includes All Labor, Materials And Equipment Necessary To Prepare And Repaint Exterior Wood Glulam Beams And Wood Soffits On The Red Canyon Visitors Center. The Visitors Center Is Located Near Flaming Gorge, Utah. The Work Site Is Owned By The Ashley National Forest, United States Forest Service. Work Includes Scaffolding, Platforms, Surface Preparation And Repainting Of Glulam Beams, Wood Soffits, And Associated Trims. Award Is As Follows: Mobilization @ $3,400.00 Red Canyon Visitors Center; Exterior Painting, Including Glulam Beams, Wood Soffit, Associated Trim @ $7,640.00 Total Of This Award: $11,040.00 Contract Start Date: June/July Of 2018 Period Of Performance: 45 Calendar Days After Issuance Of Notice To Proceed Contract End Date: November 30, 2018 Contract Cor: Lance Valentine Phone: 435.781.5113 .
17 May 2018
Usda Forest Service
Department Of Agriculture (Usda)
$11,040.00
INP17PC00291
Cebr: Picnic Pavilion Project Igf::Ot::Igf:: This Project Will Include Construction Of A 1,000 Square Foot (25 X 40 Ft) Pavilion Structure, Including A 4' Concrete Sidewalk Leading To The Picnic Pavilion From Two Separate Locations Of The Project Area. The Project Will Also Include The Sub-Grade Preparation, Sewer And Water Line Trench Excavation, And The Installing Of A Restroom A 4' Concrete Apron Will Be Included In The Construction Process For This Building.
19 Jul 2017
Imr Intermountain Region(1200)
Department Of The Interior (Doi)
$257,924.84