Patterson Taber General Engineering,
Inc.

CAGE Code: 5XY95

NCAGE Code: 5XY95

Status: Active

Type: Commercial Supplier

Dun & Bradstreet (DUNS): 961622326

Summary

Patterson Taber General Engineering,, Inc. is an Active Commercial Supplier with the Cage Code 5XY95 and is tracked by Dun & Bradstreet under DUNS Number 961622326..

Address

950 Tharp Rd Ste 501
Yuba City CA 95993-8347
United States

Points of Contact

No Points of Contact...

Related Information

Associated CAGE Codes People who viewed this 'CAGE Code' also viewed...

CAGE Code FAQ Frequently Asked Questions (FAQ) for CAGE 5XY95

What is CAGE Code 5XY95?
5XY95 is the unique identifier used by NATO Organizations to reference the physical entity known as Patterson Taber General Engineering, Inc. located at 950 Tharp Rd Ste 501, Yuba City CA 95993-8347, United States.
Who is CAGE Code 5XY95?
5XY95 refers to Patterson Taber General Engineering, Inc. located at 950 Tharp Rd Ste 501, Yuba City CA 95993-8347, United States.
Where is CAGE Code 5XY95 Located?
CAGE Code 5XY95 is located in Yuba City, CA, USA.

Contracting History for CAGE 5XY95 Contracting History for CAGE 5XY95 Most Recent 25 Records

89503320CWA000017
Construct And Complete Engineered Concrete Caisson Foundations For Structure 7/2 In The Shasta-Cottonwood No. 1 And For Structures 7/1 And 7/2 In The Shasta Cottonwood No. 2 230 K/V Transmission Lines
6 May 2020
Western-Sierra Nevada Region
Department Of Energy (Doe)
$214,662.91
89503320CWA000017
The Purpose Of This Modification Is To: 1. Remove Extraneous Pages And Repaginate Award Document 2. Modify Contract Period Of Performance Dates
16 Jun 2020
Western-Sierra Nevada Region
Department Of Energy (Doe)
$214,662.91
W9123816C0024
Igf::Ot::Igf Berm Fill
21 Jul 2017
Us Army Engineer District Sacrament
Department Of Defense (Dod)
$773,717.16
W9123816C0024
Igf::Ot::Igf Berm Fill
22 Jun 2017
Us Army Engineer District Sacrament
Department Of Defense (Dod)
$773,717.16
W9123816C0024
Igf::Ot::Igf Yuba River, Mrl 4A, Yuba County, California The Purpose Of This Modification Is To Incorporate R0006/Cd006-2. A. Scope Of Work Cd006-2 Differing Site Concrete Removal The Contractor Shall Provide All Labor, Materials, And Equipment To Remove The Previously Exposed Concrete. The Contractor Will Also Remove Any Unsuitable Material On The Existing Slope To Facilitate Benching The Fill Material Into The Slope. This Material Shall Be Stockpiled On Site And Tested To Determine Method Of Disposal. Fill Material Must Be Benched Into Suitable Material. The Contractor Shall Survey The Tie In Points For Documentation On As-Built Drawings. Additional Fill Material Will Be Part Of The Existing Berm Fill Clin And Any Amount Greater Than The Existing Quantity Already On The Contract Will Be Addressed In A Final Quantities Modification Once Complete. B. Change In Contract Drawings It Is Understood And Agreed That The Contract Drawings Affected By This Modification Will Be Updated To Reflect As-Built Conditions Necessitated By This Change, And That Cost For Such Updates Are Included Within This Modification Amount. C. Change In Contract Specifications None D. Change In Contract Price Total Contract Price Is Decreased By $1,000.00. Lump Sum Changes Clin No. Description Change Amount 0021 Differing Site Concrete -$1,000.00 Total Change Amount E. Change In Contract Time The Contract Completion Date Shall Be Extended By 6 Calendar Days By Reason Of This Modification. F. Closing Statement It Is Understood And Agreed That Pursuant To The Above, The Contract Time Is Extended The Number Of Calendar Days Stated, And The Contract Price Is Decreased By This Modification, Which Reflects All Credits Due The Government And All Debits Due The Contractor. It Is Further Understood And Agreed That This Adjustment Constitutes Compensation In Full On Behalf Of The Contractor And Its Subcontractors And Suppliers For All Costs And Markups Directly Or Indirectly Attributable For The Change Ordered, For All Delays Related Thereto, For All Extended Overhead Costs, And For Performance Of The Change Within The Time Frame Stated. This Modification Definitizes Contract Modification A00004/R00004 Which Results In A Decrease Of $1,000 On Clin 0021, Differing Site Concrete, From $7,500 To $6,500.
7 Aug 2017
Us Army Engineer District Sacrament
Department Of Defense (Dod)
$773,717.16
W9123816C0024
Igf::Ot::Igf Berm Fill
16 Mar 2017
Us Army Engineer District Sacrament
Department Of Defense (Dod)
$773,717.16
W9123816C0024
The Purpose Of This Modification Is To Incorporate R0009 Into The Task Order For This Contract With Igf::Ct::Igf.
20 Sep 2017
Us Army Engineer District Sacrament
Department Of Defense (Dod)
$773,717.16
140F0119P0106
Ca-Colusa Nwr-Ditch Rehab
3 Jun 2019
Dept Of Interior Fish Wildlife Svc
Department Of The Interior (Doi)
$115,000.00
140F0119P0106
Ca-Colusa Nwr-Ditch Rehab
24 Jun 2019
Dept Of Interior Fish Wildlife Svc
Department Of The Interior (Doi)
$115,000.00
W9123816C0024
Igf::Ot::Igf Berm Fill
17 Jul 2017
Us Army Engineer District Sacrament
Department Of Defense (Dod)
$773,717.16
W9123816C0024
The Purpose Of This Modification Is To Incorporate R0008 Into The Task Order For This Contract With A Cost Of Igf::Ct::Igf.
15 Sep 2017
Us Army Engineer District Sacrament
Department Of Defense (Dod)
$773,717.16
W9123816C0024
Igf::Ot::Igf Berm Fill
3 Oct 2017
Us Army Engineer District Sacrament
Department Of Defense (Dod)
$773,717.16
W9123816C0024
Igf::Ot::Igf
10 Apr 2019
Us Army Engineer District Sacrament
Department Of Defense (Dod)
$773,717.16
W9123816C0024
Berm Fill The Purpose Of This Modification Is To Incorporate R0007 Into The Task Order For This Contract With A Cost Of Igf::Ct::Igf.
28 Aug 2017
Us Army Engineer District Sacrament
Department Of Defense (Dod)
$773,717.16