Gehry Partners-Aecom Eisenhower
Memorial Design Team, A Joint
Venture
CAGE Code: 5WS51
NCAGE Code: 5WS51
Status: Active
Type: Commercial Supplier
Dun & Bradstreet (DUNS): 961721441
Summary
Gehry Partners-Aecom Eisenhower, Memorial Design Team, A Joint, Venture is an Active Commercial Supplier with the Cage Code 5WS51 and is tracked by Dun & Bradstreet under DUNS Number 961721441..
Address
12541 Beatrice St
Los Angeles CA 90066-7001
United States
Points of Contact
No Points of Contact...
Related Information
People who viewed this 'CAGE Code' also viewed...
Simco Sales, Inc. G I Maintenance Los Angeles Potato Distributors Inc Pacific Radio Electronics Computer Graphics & Networking, Inc. Lehigh Safety Shoe Co Calumet Photographic Inc General Photo-Grapic Inc Fairchild Aviation Recorders Data Grimes-Stassforth Stationary Co Tork-Master Div Of General Controls Victory Salvage Inc. Abbott Instrument And Engineering Co Ells Dick Co Fiedler C O Cc Security Systems University Of California National Sam Sung Air Control Llc Electronic Stationers Gentle Touch House Keeping Llc
Frequently Asked Questions (FAQ) for CAGE 5WS51
- What is CAGE Code 5WS51?
- 5WS51 is the unique identifier used by NATO Organizations to reference the physical entity known as Gehry Partners-Aecom Eisenhower Memorial Design Team, A Joint Venture located at 12541 Beatrice St, Los Angeles CA 90066-7001, United States.
- Who is CAGE Code 5WS51?
- 5WS51 refers to Gehry Partners-Aecom Eisenhower Memorial Design Team, A Joint Venture located at 12541 Beatrice St, Los Angeles CA 90066-7001, United States.
- Where is CAGE Code 5WS51 Located?
- CAGE Code 5WS51 is located in Los Angeles, CA, USA.
Contracting History for CAGE 5WS51 Most Recent 25 Records
- GS11P10MKC0038
- Construction Phase Extension To 03312020 Option 6 Record Documents
- 22 Jan 2020
- Construction Phase Extension To 03312020 Option 6 Record Documents
- Pbs Ncr Capital Construction Ctr 2
- General Services Administration (Gsa)
- $29,530,006.41
- General Services Administration (Gsa)
- GS11P10MKC0038
- Additional Work Regarding Tree Replacement
- 30 Sep 2020
- Additional Work Regarding Tree Replacement
- Pbs Ncr Capital Construction Ctr 2
- General Services Administration (Gsa)
- $29,631,327.51
- General Services Administration (Gsa)
- GS11P10MKC0038
- Construction Administration Svcs Extension Revised To 09.17.2020 And De-Scope Re-Patination Of Sculptures
- 11 Aug 2020
- Construction Administration Svcs Extension Revised To 09.17.2020 And De-Scope Re-Patination Of Sculptures
- Pbs Ncr Capital Construction Ctr 2
- General Services Administration (Gsa)
- $29,631,327.51
- General Services Administration (Gsa)
- GS11P10MKC0038
- Gs11p10mkc0038, Professional Ae Design Services, Eisenhower Memorial, Washington, Dc Mod Ps84 - Additional Geotechnical Services The Contractor's Signature In Block 15B Indicates His Agreement To Provide Professional A/E Design Services As Detailed On Ae81 For Additional Geoconcepts Site Visits Due To Extending The Previous Geoconcepts Scope And For Additional Site Visit Scope, As An Add To The Contract In The Amount Of $72,485.07. Contract Completion Remains As 09/30/2019. . In Accordance With Far 52.243 Changes Clause (Fixed Price), You Are Hereby Authorized To Proceed With The Scope Of Work As Detailed Under The Following Clin (Refer To Ae81): Clin 0085 Ae81 Additional Geotechnical Services $72,485.07 Reference Gp-Aecom Proposal For Ae81 - Added Geotechnical Services (Rev. 2) Dated 05/01/2019 All Work Is To Be Completed In Accordance With All Applicable Contract Requirements, Regulations And Standards. All Terms And Conditions Remain In Full Force And Effect.
- 29 May 2019
- Gs11p10mkc0038, Professional Ae Design Services, Eisenhower Memorial, Washington, Dc Mod Ps84 - Additional Geotechnical Services The Contractor's Signature In Block 15B Indicates His Agreement To Provide Professional A/E Design Services As Detailed On Ae81 For Additional Geoconcepts Site Visits Due To Extending The Previous Geoconcepts Scope And For Additional Site Visit Scope, As An Add To The Contract In The Amount Of $72,485.07. Contract Completion Remains As 09/30/2019. . In Accordance With Far 52.243 Changes Clause (Fixed Price), You Are Hereby Authorized To Proceed With The Scope Of Work As Detailed Under The Following Clin (Refer To Ae81): Clin 0085 Ae81 Additional Geotechnical Services $72,485.07 Reference Gp-Aecom Proposal For Ae81 - Added Geotechnical Services (Rev. 2) Dated 05/01/2019 All Work Is To Be Completed In Accordance With All Applicable Contract Requirements, Regulations And Standards. All Terms And Conditions Remain In Full Force And Effect.
- Pbs Ncr Capital Construction Ctr 2
- General Services Administration (Gsa)
- $28,526,725.04
- General Services Administration (Gsa)
- GS11P10MKC0038
- Section 889
- 27 Mar 2020
- Section 889
- Pbs Ncr Capital Construction Ctr 2
- General Services Administration (Gsa)
- $29,530,006.41
- General Services Administration (Gsa)
- GS11P10MKC0038
- Gs11p10mkc0038, Professional Ae Design Services, Eisenhower Memorial, Washington, Dc Mod Ps83 - Stormwater Inlet Design, Added Art Management, Pole Base The Contractor's Signature In Block 15B Indicates His Agreement To Provide Professional A/E Design Services As Detailed On Ae78, Ae79 And Ae 80 As An Add To The Contract In The Amount Of $47,639.99, With No Time Extension. Completion Date Remains As 09/30/2019. In Accordance With Far 52.243 Changes Clause (Fixed Price), You Are Hereby Authorized To Proceed With The Scopes Of Work As Detailed Under The Following Clins (Refer To Ae78, Ae79, Ae80) Clin 0082 Ae78 Stormwater Inlet Design Add $11,206.45 Reference Gp-Aecom Proposal For Ae78 Stormwater Inlet Dated 01/12/2019 Clin 0083 Ae79 Added Art Management Add $31,706.01 Reference Gp-Aecom Proposal For Ae79 Additional Art Management Dated 01/31/2019 Clin 0084 Ae80 Light Pole Foundation Engineering Add $4,727.53 Reference Gp-Aecom Proposal For Ae80 Light Pole Foundation Engineering Dated 01/27/2019 All Work Is To Be Completed In Accordance With All Applicable Contract Requirements, Regulations And Standards. All Terms And Conditions Remain In Full Force And Effect.
- 14 Mar 2019
- Gs11p10mkc0038, Professional Ae Design Services, Eisenhower Memorial, Washington, Dc Mod Ps83 - Stormwater Inlet Design, Added Art Management, Pole Base The Contractor's Signature In Block 15B Indicates His Agreement To Provide Professional A/E Design Services As Detailed On Ae78, Ae79 And Ae 80 As An Add To The Contract In The Amount Of $47,639.99, With No Time Extension. Completion Date Remains As 09/30/2019. In Accordance With Far 52.243 Changes Clause (Fixed Price), You Are Hereby Authorized To Proceed With The Scopes Of Work As Detailed Under The Following Clins (Refer To Ae78, Ae79, Ae80) Clin 0082 Ae78 Stormwater Inlet Design Add $11,206.45 Reference Gp-Aecom Proposal For Ae78 Stormwater Inlet Dated 01/12/2019 Clin 0083 Ae79 Added Art Management Add $31,706.01 Reference Gp-Aecom Proposal For Ae79 Additional Art Management Dated 01/31/2019 Clin 0084 Ae80 Light Pole Foundation Engineering Add $4,727.53 Reference Gp-Aecom Proposal For Ae80 Light Pole Foundation Engineering Dated 01/27/2019 All Work Is To Be Completed In Accordance With All Applicable Contract Requirements, Regulations And Standards. All Terms And Conditions Remain In Full Force And Effect.
- Pbs Ncr Capital Construction Ctr 2
- General Services Administration (Gsa)
- $28,454,239.97
- General Services Administration (Gsa)
- GS11P10MKC0038
- Extension To Construction Administration Services And Site Visits During The Revised Construction Period
- 26 Sep 2019
- Extension To Construction Administration Services And Site Visits During The Revised Construction Period
- Pbs Ncr Capital Construction Ctr 2
- General Services Administration (Gsa)
- $29,231,585.67
- General Services Administration (Gsa)
- GS11P10MKC0038
- Ae Construction Administration Services Part 2
- 18 Jun 2018
- Ae Construction Administration Services Part 2
- Pbs Ncr Capital Construction Ctr 2
- General Services Administration (Gsa)
- $28,261,352.46
- General Services Administration (Gsa)
- GS11P10MKC0038
- Period Of Performance Extension
- 1 May 2020
- Period Of Performance Extension
- Pbs Ncr Capital Construction Ctr 2
- General Services Administration (Gsa)
- $29,631,327.51
- General Services Administration (Gsa)
- GS11P10MKC0038
- Modification Ps82 - Ae-74&Ae-76 Bim Tapestry&Memorial Core The Contractor's Signature In Block 15(B) Indicates Its Agreement To Provide A/E Design Services For Ae-74 Anad Ae-76 Bim Tapestry And Memorial Core (Clins 80 And 81) As An Add To The Contract In The Amount Of $90,405.57. The New Contract Aggregate Total Amount Is $28,378,277.68. The Completion Date Will Remain Unchanged. All Work Is To Be Accomplished In Accordance With All Applicable Standards, Requirements, Terms And Conditions. For Questions Concerning This Modification (Ps82), Please Feel Free To Contact Adrienne Smith At Adrienne.Smith@Gsa.Gov.
- 13 Nov 2018
- Modification Ps82 - Ae-74&Ae-76 Bim Tapestry&Memorial Core The Contractor's Signature In Block 15(B) Indicates Its Agreement To Provide A/E Design Services For Ae-74 Anad Ae-76 Bim Tapestry And Memorial Core (Clins 80 And 81) As An Add To The Contract In The Amount Of $90,405.57. The New Contract Aggregate Total Amount Is $28,378,277.68. The Completion Date Will Remain Unchanged. All Work Is To Be Accomplished In Accordance With All Applicable Standards, Requirements, Terms And Conditions. For Questions Concerning This Modification (Ps82), Please Feel Free To Contact Adrienne Smith At Adrienne.Smith@Gsa.Gov.
- Pbs Ncr Capital Construction Ctr 2
- General Services Administration (Gsa)
- $28,406,599.98
- General Services Administration (Gsa)
- GS11P10MKC0038
- Provide A 2Month Extension For Construction Administration Services
- 8 Apr 2020
- Provide A 2Month Extension For Construction Administration Services
- Pbs Ncr Capital Construction Ctr 2
- General Services Administration (Gsa)
- $29,631,327.51
- General Services Administration (Gsa)
- GS11P10MKC0038
- De-Obligation Modification For Unused Travel Expenses And Other Direct Costs
- 15 Jan 2021
- De-Obligation Modification For Unused Travel Expenses And Other Direct Costs
- Pbs Ncr Capital Construction Ctr 2
- General Services Administration (Gsa)
- $29,605,401.92
- General Services Administration (Gsa)
- GS11P10MKC0038
- Ae-75 Bulletin 10 Design
- 9 Aug 2018
- Ae-75 Bulletin 10 Design
- Pbs Ncr Capital Construction Ctr 2
- General Services Administration (Gsa)
- $28,316,194.41
- General Services Administration (Gsa)
- GS11P10MKC0038
- Provide Additional Staffing For Three Months And Enmar Travel,
- 19 Aug 2019
- Provide Additional Staffing For Three Months And Enmar Travel,
- Pbs Ncr Capital Construction Ctr 2
- General Services Administration (Gsa)
- $28,663,391.44
- General Services Administration (Gsa)
- GS11P10MKC0038
- Provide Ae Design Services For The New Donor Wall Within The Memorial Support Building
- 24 Jul 2019
- Provide Ae Design Services For The New Donor Wall Within The Memorial Support Building
- Pbs Ncr Capital Construction Ctr 2
- General Services Administration (Gsa)
- $28,558,679.82
- General Services Administration (Gsa)