Eric's Leading Edge

CAGE Code: 5QJT9

NCAGE Code: 5QJT9

Status: Active

Type: Commercial Supplier

Dun & Bradstreet (DUNS): 832070333

Summary

Eric's Leading Edge is an Active Commercial Supplier with the Cage Code 5QJT9 and is tracked by Dun & Bradstreet under DUNS Number 832070333..

Address

4196 S Airport Pkwy Unit 2D
St George UT 84790-4959
United States

Points of Contact

No Points of Contact...

Related Information

Associated CAGE Codes People who viewed this 'CAGE Code' also viewed...

CAGE Code FAQ Frequently Asked Questions (FAQ) for CAGE 5QJT9

What is CAGE Code 5QJT9?
5QJT9 is the unique identifier used by NATO Organizations to reference the physical entity known as Eric's Leading Edge located at 4196 S Airport Pkwy Unit 2D, St George UT 84790-4959, United States.
Who is CAGE Code 5QJT9?
5QJT9 refers to Eric's Leading Edge located at 4196 S Airport Pkwy Unit 2D, St George UT 84790-4959, United States.
Where is CAGE Code 5QJT9 Located?
CAGE Code 5QJT9 is located in St George, UT, USA.

Contracting History for CAGE 5QJT9 Contracting History for CAGE 5QJT9 Most Recent 25 Records

1284N818C0002
Igf::Ot::Igf New Avionics And Engine Indication Equipment For N143z, De Havilland Dhc 6-300 With Possible Option For N141z R4 Aviation The Objective Of This Contract Is To Complete The Installation And Certification Of New Avionics And Engine Instrument Panel Upgrade On Plane N143z (A De Havilland Dhc6-300); With A Possible Contract Option Item For A Second New Avionics And Engine Instrument Panel Upgrade On Plane N141z (A De Havilland Dhc6-300). Both Of These Planes Have Had The Original -27 Engines Replaced By Pratt And Whitney Pt6-34 Engines (There Is An Stc Document Stating The Gauge Differences For Itt And Oil Pressure). Government Contract: Kevin Bailey Phone: 801.620.1870 Contract Period Of Performance: 75 Calendar Days From Issuance Of Notice To Proceed Modification 01 This Modification Extends The Contract From 06/29/2018 To 08/31/2018. This Extension Allows Time For The Contractor To Work With Aerocorp And Garmin To Obtain The Necessary Approved Stc Of The Nxi Screens (With The Software Corrections Currently Being Worked On)For Installing Into The Plane. Modification 02 This Modification Extends The Contract From 08/31/2018 To 09/28/2018. This Extension Allows Time For Stc, Which Is Currently In The Queue At The Federal Aviation Administration New York Aircraft Certification Office, To Be Administratively Approved. All Other Contract Terms And Conditions Remain Unchanged. Modification 03 This Modification Corrects Modification 02. The Period Of Performance For This Contract Is Extended To 09/28/2018 And The Contract Expiration Date Is Set At 10/31/2018. All Other Contract Terms And Conditions Remain Unchanged. Modification 04 This Modification Exercises Option #1 For: -New Avionics And Engine Indication Equipment For N141z, De Havilland Dhc 6-300 (Includes Any Certificates, Licensing, Testing, Etc.) Quantity Of 1 At $778,504.90 -Labor For Installation Of Equipment Quantity Of 1 At $152,955.00 -Credit For Equipment Removed From Aircraft (If Accepted) If Accepted, Quantity Of 1 At -$20,000.00 Total Of This Modification: $911,459.90 All Other Contract Terms And Conditions Remain Unchanged.
14 Sep 2018
Usda Forest Service
Department Of Agriculture (Usda)
$1,822,919.80
1284N819C0001
Igf::Ot::Igf Avionics Upgrade Of N144z Cessna Citation Bravo Serial Number Ce550b/926 Modification 03 - This Modification Extends The Period Of Performance By An Additional 15 Calendar Days (For A Total Of 72 Calendar Days) And Extends The Contract Expiration Date To May 15, 2019. New Period Of Performance Ends On May 1, 2019. All Other Contract Terms And Conditions Remain Unchanged. Modification 02 - This Modification Extends The Period Of Performance By An Additional 17 Days (For A Total Of 57 Calendar Days) And Extends The Contract Expiration Date To April 30, 2019. In Consideration For The Additional 17 Days Of Period Of Performance, A Contract Deduction Of $432.00 Is Applied. All Other Contract Terms And Conditions Remain Unchanged. Modification 01 - This Modification Extends The Contract Expiration Date To March 30, 2019. This Extension Is Necessary As The Plane Was Not Inducted Until January 8, 2019 And With A 40 Calendar Period Of Performance, The Contract Should Be Completed By February 16, 2019. However, To Provide For Possible Changes Required For The Government Shutdown Entered Into On December 22, 2018, The Contract Expiration Date Is Set At March 30, 2019. Complete The Installation And Certification Of New Avionics Upgrade On Plane N144z. The Scope Of This Contract Is To Furnish All Labor, Tools, Upgrade Equipment, Permits, And Incidentals Necessary To Remove The Existing/Original Avionics Equipment And Install All Equipment As Listed In The Contract Scope Of Work. Contract Period Of Performance Is 40 Calendar Days From Issuance Of Notice To Proceed. The Government Requires Delivery Of The Completed Aircraft By January 11, 2019. Project Cor: Kevin Bailey Phone: 801.620.1870 Schedule Of Items: 1.A Avionics Upgrade To N144z, Cessna Citation Bravo (Includes Any Applicable Certificates, Licensing, Testing, Etc.) Quantity Of 1 System @ $261,650.80 1.B Labor For Installation Of Equipment Quantity Of 1 Job @ $40,625.00 1.C Credit For Equipment Removed From The Aircraft Quantity (If Accepted Of 1 Lot @ $-7,500.00 Total Of This Award: $294,775.80
15 Apr 2019
Usda Forest Service
Department Of Agriculture (Usda)
$294,343.80
1284N819C0001
Igf::Ot::Igf Avionics Upgrade Of N144z Cessna Citation Bravo Serial Number Ce550b/926 Modification 04 - This Modification Extends The Period Of Performance By An Additional 7 Calendar Days (For A Total Of 79 Calendar Days) And Extends The Contract Expiration Date To June 14, 2019. New Period Of Performance Ends Of May 8, 2019. All Other Contract Terms And Conditions Remain Unchanged. This Modification Is A No Cost Modification And There Is No Change To The Contract Value. Modification 03 - This Modification Extends The Period Of Performance By An Additional 15 Calendar Days (For A Total Of 72 Calendar Days) And Extends The Contract Expiration Date To May 15, 2019. New Period Of Performance Ends On May 1, 2019. All Other Contract Terms And Conditions Remain Unchanged. Modification 02 - This Modification Extends The Period Of Performance By An Additional 17 Days (For A Total Of 57 Calendar Days) And Extends The Contract Expiration Date To April 30, 2019. In Consideration For The Additional 17 Days Of Period Of Performance, A Contract Deduction Of $432.00 Is Applied. All Other Contract Terms And Conditions Remain Unchanged. Modification 01 - This Modification Extends The Contract Expiration Date To March 30, 2019. This Extension Is Necessary As The Plane Was Not Inducted Until January 8, 2019 And With A 40 Calendar Period Of Performance, The Contract Should Be Completed By February 16, 2019. However, To Provide For Possible Changes Required For The Government Shutdown Entered Into On December 22, 2018, The Contract Expiration Date Is Set At March 30, 2019. Complete The Installation And Certification Of New Avionics Upgrade On Plane N144z. The Scope Of This Contract Is To Furnish All Labor, Tools, Upgrade Equipment, Permits, And Incidentals Necessary To Remove The Existing/Original Avionics Equipment And Install All Equipment As Listed In The Contract Scope Of Work. Contract Period Of Performance Is 40 Calendar Days From Issuance Of Notice To Proceed. The Government Requires Delivery Of The Completed Aircraft By January 11, 2019. Project Cor: Kevin Bailey Phone: 801.620.1870 Schedule Of Items: 1.A Avionics Upgrade To N144z, Cessna Citation Bravo (Includes Any Applicable Certificates, Licensing, Testing, Etc.) Quantity Of 1 System @ $261,650.80 1.B Labor For Installation Of Equipment Quantity Of 1 Job @ $40,625.00 1.C Credit For Equipment Removed From The Aircraft Quantity (If Accepted Of 1 Lot @ $-7,500.00 Total Of This Award: $294,775.80
1 May 2019
Usda Forest Service
Department Of Agriculture (Usda)
$294,343.80
1284N818C0002
Igf::Ot::Igf New Avionics And Engine Indication Equipment For N143z, De Havilland Dhc 6-300 With Possible Option For N141z R4 Aviation The Objective Of This Contract Is To Complete The Installation And Certification Of New Avionics And Engine Instrument Panel Upgrade On Plane N143z (A De Havilland Dhc6-300); With A Possible Contract Option Item For A Second New Avionics And Engine Instrument Panel Upgrade On Plane N141z (A De Havilland Dhc6-300). Both Of These Planes Have Had The Original -27 Engines Replaced By Pratt And Whitney Pt6-34 Engines (There Is An Stc Document Stating The Gauge Differences For Itt And Oil Pressure). Government Contract: Kevin Bailey Phone: 801.620.1870 Contract Period Of Performance: 75 Calendar Days From Issuance Of Notice To Proceed Modification 01 This Modification Extends The Contract From 06/29/2018 To 08/31/2018. This Extension Allows Time For The Contractor To Work With Aerocorp And Garmin To Obtain The Necessary Approved Stc Of The Nxi Screens (With The Software Corrections Currently Being Worked On)For Installing Into The Plane. Modification 02 This Modification Extends The Contract From 08/31/2018 To 09/28/2018. This Extension Allows Time For Stc, Which Is Currently In The Queue At The Federal Aviation Administration New York Aircraft Certification Office, To Be Administratively Approved. All Other Contract Terms And Conditions Remain Unchanged.
30 Aug 2018
Usda Forest Service
Department Of Agriculture (Usda)
$911,459.90
1284N818C0002
Igf::Ot::Igf New Avionics And Engine Indication Equipment For N143z, De Havilland Dhc 6-300 With Possible Option For N141z R4 Aviation The Objective Of This Contract Is To Complete The Installation And Certification Of New Avionics And Engine Instrument Panel Upgrade On Plane N143z (A De Havilland Dhc6-300); With A Possible Contract Option Item For A Second New Avionics And Engine Instrument Panel Upgrade On Plane N141z (A De Havilland Dhc6-300). Both Of These Planes Have Had The Original -27 Engines Replaced By Pratt And Whitney Pt6-34 Engines (There Is An Stc Document Stating The Gauge Differences For Itt And Oil Pressure). Government Contract: Kevin Bailey Phone: 801.620.1870 Contract Period Of Performance: 75 Calendar Days From Issuance Of Notice To Proceed
7 Mar 2018
Usda Forest Service
Department Of Agriculture (Usda)
$1,822,919.80
1284N818C0002
Igf::Ot::Igf New Avionics And Engine Indication Equipment For N143z, De Havilland Dhc 6-300 With Possible Option For N141z R4 Aviation The Objective Of This Contract Is To Complete The Installation And Certification Of New Avionics And Engine Instrument Panel Upgrade On Plane N143z (A De Havilland Dhc6-300); With A Possible Contract Option Item For A Second New Avionics And Engine Instrument Panel Upgrade On Plane N141z (A De Havilland Dhc6-300). Both Of These Planes Have Had The Original -27 Engines Replaced By Pratt And Whitney Pt6-34 Engines (There Is An Stc Document Stating The Gauge Differences For Itt And Oil Pressure). Government Contract: Kevin Bailey Phone: 801.620.1870 Contract Period Of Performance: 75 Calendar Days From Issuance Of Notice To Proceed Modification 01 This Modification Extends The Contract From 06/29/2018 To 08/31/2018. This Extension Allows Time For The Contractor To Work With Aerocorp And Garmin To Obtain The Necessary Approved Stc Of The Nxi Screens (With The Software Corrections Currently Being Worked On)For Installing Into The Plane. Modification 02 This Modification Extends The Contract From 08/31/2018 To 09/28/2018. This Extension Allows Time For Stc, Which Is Currently In The Queue At The Federal Aviation Administration New York Aircraft Certification Office, To Be Administratively Approved. All Other Contract Terms And Conditions Remain Unchanged. Modification 03 This Modification Corrects Modification 02. The Period Of Performance For This Contract Is Extended To 09/28/2018 And The Contract Expiration Date Is Set At 10/31/2018. All Other Contract Terms And Conditions Remain Unchanged. Modification 04 This Modification Exercises Option #1 For: -New Avionics And Engine Indication Equipment For N141z, De Havilland Dhc 6-300 (Includes Any Certificates, Licensing, Testing, Etc.) Quantity Of 1 At $778,504.90 -Labor For Installation Of Equipment Quantity Of 1 At $152,955.00 -Credit For Equipment Removed From Aircraft (If Accepted) If Accepted, Quantity Of 1 At -$20,000.00 Total Of This Modification: $911,459.90 All Other Contract Terms And Conditions Remain Unchanged. Modification 05 The Department Of Agriculture Has Determined That The Work Performed Under This Contract Is Of A Non-Excepted Nature During The Federal Government's Lapse Of Appropriations. Therefore, Contract Performance Shall Be Suspended As Of The Date Of This Modification (December 26, 2018) Until Further Notification. Following The Availability Of Appropriated Funding, The Contractor Will Be Notified By The Contracting Officer On How To Proceed, And The Contract Will Be Modified To Reflect This Change.
26 Dec 2018
Usda Forest Service
Department Of Agriculture (Usda)
$1,822,919.80
1284N818C0002
Igf::Ot::Igf New Avionics And Engine Indication Equipment For N143z, De Havilland Dhc 6-300 With Possible Option For N141z R4 Aviation The Objective Of This Contract Is To Complete The Installation And Certification Of New Avionics And Engine Instrument Panel Upgrade On Plane N143z (A De Havilland Dhc6-300); With A Possible Contract Option Item For A Second New Avionics And Engine Instrument Panel Upgrade On Plane N141z (A De Havilland Dhc6-300). Both Of These Planes Have Had The Original -27 Engines Replaced By Pratt And Whitney Pt6-34 Engines (There Is An Stc Document Stating The Gauge Differences For Itt And Oil Pressure). Government Contract: Kevin Bailey Phone: 801.620.1870 Contract Period Of Performance: 75 Calendar Days From Issuance Of Notice To Proceed Modification 01 This Modification Extends The Contract From 06/29/2018 To 08/31/2018. This Extension Allows Time For The Contractor To Work With Aerocorp And Garmin To Obtain The Necessary Approved Stc Of The Nxi Screens (With The Software Corrections Currently Being Worked On)For Installing Into The Plane. Modification 02 This Modification Extends The Contract From 08/31/2018 To 09/28/2018. This Extension Allows Time For Stc, Which Is Currently In The Queue At The Federal Aviation Administration New York Aircraft Certification Office, To Be Administratively Approved. All Other Contract Terms And Conditions Remain Unchanged. Modification 03 This Modification Corrects Modification 02. The Period Of Performance For This Contract Is Extended To 09/28/2018 And The Contract Expiration Date Is Set At 10/31/2018. All Other Contract Terms And Conditions Remain Unchanged. Modification 04 This Modification Exercises Option #1 For: -New Avionics And Engine Indication Equipment For N141z, De Havilland Dhc 6-300 (Includes Any Certificates, Licensing, Testing, Etc.) Quantity Of 1 At $778,504.90 -Labor For Installation Of Equipment Quantity Of 1 At $152,955.00 -Credit For Equipment Removed From Aircraft (If Accepted) If Accepted, Quantity Of 1 At -$20,000.00 Total Of This Modification: $911,459.90 All Other Contract Terms And Conditions Remain Unchanged. Modification 05 The Department Of Agriculture Has Determined That The Work Performed Under This Contract Is Of A Non-Excepted Nature During The Federal Government's Lapse Of Appropriations. Therefore, Contract Performance Shall Be Suspended As Of The Date Of This Modification (December 26, 2018) Until Further Notification. Following The Availability Of Appropriated Funding, The Contractor Will Be Notified By The Contracting Officer On How To Proceed, And The Contract Will Be Modified To Reflect This Change. Modification 06 The Department Of Agriculture Has Determined That The Work Performed Under This Contract Shall Continue During The Government Shutdown. Therefore, Contract Performance Shall Continue As Of The Date Of This Modification (January 8, 2019) And Continue Through Completion Of The Contract Or Until Further Notification. Modification 07 This Modification Extends The Contract Period Of Performance To March 16, 2019. This Extension Allows For Completion Of The Contract After The Government Shutdown Impacted The Original Contract Period Of Performance. Original Contract Completion Date: February 28, 2019 Government Shutdown Began: December 22, 2019 Contract Started Up: January 8, 2019 The Contract Was Shutdown For 16 Calendar Days During The Government Shutdown. This Modification Extends The Contract Period Of Performance By 16 Calendar Days, Making The New Contract Expiration Date Come To March 16, 2019. All Other Contract Terms And Conditions Remain Unchanged.
19 Feb 2019
Usda Forest Service
Department Of Agriculture (Usda)
$1,822,919.80
1284N819C0001
Igf::Ot::Igf Avionics Upgrade Of N144z Cessna Citation Bravo Serial Number Ce550b/926 Complete The Installation And Certification Of New Avionics Upgrade On Plane N144z. The Scope Of This Contract Is To Furnish All Labor, Tools, Upgrade Equipment, Permits, And Incidentals Necessary To Remove The Existing/Original Avionics Equipment And Install All Equipment As Listed In The Contract Scope Of Work. Contract Period Of Performance Is 40 Calendar Days From Issuance Of Notice To Proceed. The Government Requires Delivery Of The Completed Aircraft By January 11, 2019. Project Cor: Kevin Bailey Phone: 801.620.1870 Schedule Of Items: 1.A Avionics Upgrade To N144z, Cessna Citation Bravo (Includes Any Applicable Certificates, Licensing, Testing, Etc.) Quantity Of 1 System @ $261,650.80 1.B Labor For Installation Of Equipment Quantity Of 1 Job @ $40,625.00 1.C Credit For Equipment Removed From The Aircraft Quantity (If Accepted Of 1 Lot @ $-7,500.00 Total Of This Award: $294,775.80
4 Oct 2018
Usda Forest Service
Department Of Agriculture (Usda)
$294,775.80
1284N818C0002
Igf::Ot::Igf New Avionics And Engine Indication Equipment For N143z, De Havilland Dhc 6-300 With Possible Option For N141z R4 Aviation The Objective Of This Contract Is To Complete The Installation And Certification Of New Avionics And Engine Instrument Panel Upgrade On Plane N143z (A De Havilland Dhc6-300); With A Possible Contract Option Item For A Second New Avionics And Engine Instrument Panel Upgrade On Plane N141z (A De Havilland Dhc6-300). Both Of These Planes Have Had The Original -27 Engines Replaced By Pratt And Whitney Pt6-34 Engines (There Is An Stc Document Stating The Gauge Differences For Itt And Oil Pressure). Government Contract: Kevin Bailey Phone: 801.620.1870 Contract Period Of Performance: 75 Calendar Days From Issuance Of Notice To Proceed Modification 01 This Modification Extends The Contract From 06/29/2018 To 08/31/2018. This Extension Allows Time For The Contractor To Work With Aerocorp And Garmin To Obtain The Necessary Approved Stc Of The Nxi Screens (With The Software Corrections Currently Being Worked On)For Installing Into The Plane. Modification 02 This Modification Extends The Contract From 08/31/2018 To 09/28/2018. This Extension Allows Time For Stc, Which Is Currently In The Queue At The Federal Aviation Administration New York Aircraft Certification Office, To Be Administratively Approved. All Other Contract Terms And Conditions Remain Unchanged. Modification 03 This Modification Corrects Modification 02. The Period Of Performance For This Contract Is Extended To 09/28/2018 And The Contract Expiration Date Is Set At 10/31/2018. All Other Contract Terms And Conditions Remain Unchanged. Modification 04 This Modification Exercises Option #1 For: -New Avionics And Engine Indication Equipment For N141z, De Havilland Dhc 6-300 (Includes Any Certificates, Licensing, Testing, Etc.) Quantity Of 1 At $778,504.90 -Labor For Installation Of Equipment Quantity Of 1 At $152,955.00 -Credit For Equipment Removed From Aircraft (If Accepted) If Accepted, Quantity Of 1 At -$20,000.00 Total Of This Modification: $911,459.90 All Other Contract Terms And Conditions Remain Unchanged. Modification 05 The Department Of Agriculture Has Determined That The Work Performed Under This Contract Is Of A Non-Excepted Nature During The Federal Government's Lapse Of Appropriations. Therefore, Contract Performance Shall Be Suspended As Of The Date Of This Modification (December 26, 2018) Until Further Notification. Following The Availability Of Appropriated Funding, The Contractor Will Be Notified By The Contracting Officer On How To Proceed, And The Contract Will Be Modified To Reflect This Change. Modification 06 The Department Of Agriculture Has Determined That The Work Performed Under This Contract Shall Continue During The Government Shutdown. Therefore, Contract Performance Shall Continue As Of The Date Of This Modification (January 8, 2019) And Continue Through Completion Of The Contract Or Until Further Notification.
8 Jan 2019
Usda Forest Service
Department Of Agriculture (Usda)
$1,822,919.80
1284N818C0002
Igf::Ot::Igf New Avionics And Engine Indication Equipment For N143z, De Havilland Dhc 6-300 With Possible Option For N141z R4 Aviation The Objective Of This Contract Is To Complete The Installation And Certification Of New Avionics And Engine Instrument Panel Upgrade On Plane N143z (A De Havilland Dhc6-300); With A Possible Contract Option Item For A Second New Avionics And Engine Instrument Panel Upgrade On Plane N141z (A De Havilland Dhc6-300). Both Of These Planes Have Had The Original -27 Engines Replaced By Pratt And Whitney Pt6-34 Engines (There Is An Stc Document Stating The Gauge Differences For Itt And Oil Pressure). Government Contract: Kevin Bailey Phone: 801.620.1870 Contract Period Of Performance: 75 Calendar Days From Issuance Of Notice To Proceed Modification 01 This Modification Extends The Contract From 06/29/2018 To 08/31/2018. This Extension Allows Time For The Contractor To Work With Aerocorp And Garmin To Obtain The Necessary Approved Stc Of The Nxi Screens (With The Software Corrections Currently Being Worked On)For Installing Into The Plane. Modification 02 This Modification Extends The Contract From 08/31/2018 To 09/28/2018. This Extension Allows Time For Stc, Which Is Currently In The Queue At The Federal Aviation Administration New York Aircraft Certification Office, To Be Administratively Approved. All Other Contract Terms And Conditions Remain Unchanged. Modification 03 This Modification Corrects Modification 02. The Period Of Performance For This Contract Is Extended To 09/28/2018 And The Contract Expiration Date Is Set At 10/31/2018. All Other Contract Terms And Conditions Remain Unchanged.
30 Aug 2018
Usda Forest Service
Department Of Agriculture (Usda)
$911,459.90
1284N819C0001
Igf::Ot::Igf Avionics Upgrade Of N144z Cessna Citation Bravo Serial Number Ce550b/926 Modification 05 - This Modification Extends The Period Of Performance By An Additional 23 Calendar Days (For A Total Of 102 Calendar Days), The Contract Expiration Date Remains At June 14, 2019. New Period Of Performance Ends May 31, 2019. Work On The Plane Is To Be Completed By May 22, 2019 In Order To Allow For Government Inspectors To Perform Inspection Duties And Any Deficiencies Resolved Prior To May 28, 2019 (The Last Day That The Plane Can Be Flown Out Of The St. George, Utah Airport Prior To Runway Being Closed For Repairs) Modification 04 - This Modification Extends The Period Of Performance By An Additional 7 Calendar Days (For A Total Of 79 Calendar Days) And Extends The Contract Expiration Date To June 14, 2019. New Period Of Performance Ends Of May 8, 2019. All Other Contract Terms And Conditions Remain Unchanged. This Modification Is A No Cost Modification And There Is No Change To The Contract Value. Modification 03 - This Modification Extends The Period Of Performance By An Additional 15 Calendar Days (For A Total Of 72 Calendar Days) And Extends The Contract Expiration Date To May 15, 2019. New Period Of Performance Ends On May 1, 2019. All Other Contract Terms And Conditions Remain Unchanged. Modification 02 - This Modification Extends The Period Of Performance By An Additional 17 Days (For A Total Of 57 Calendar Days) And Extends The Contract Expiration Date To April 30, 2019. In Consideration For The Additional 17 Days Of Period Of Performance, A Contract Deduction Of $432.00 Is Applied. All Other Contract Terms And Conditions Remain Unchanged. Modification 01 - This Modification Extends The Contract Expiration Date To March 30, 2019. This Extension Is Necessary As The Plane Was Not Inducted Until January 8, 2019 And With A 40 Calendar Period Of Performance, The Contract Should Be Completed By February 16, 2019. However, To Provide For Possible Changes Required For The Government Shutdown Entered Into On December 22, 2018, The Contract Expiration Date Is Set At March 30, 2019. Complete The Installation And Certification Of New Avionics Upgrade On Plane N144z. The Scope Of This Contract Is To Furnish All Labor, Tools, Upgrade Equipment, Permits, And Incidentals Necessary To Remove The Existing/Original Avionics Equipment And Install All Equipment As Listed In The Contract Scope Of Work. Contract Period Of Performance Is 40 Calendar Days From Issuance Of Notice To Proceed. The Government Requires Delivery Of The Completed Aircraft By January 11, 2019. Project Cor: Kevin Bailey Phone: 801.620.1870 Schedule Of Items: 1.A Avionics Upgrade To N144z, Cessna Citation Bravo (Includes Any Applicable Certificates, Licensing, Testing, Etc.) Quantity Of 1 System @ $261,650.80 1.B Labor For Installation Of Equipment Quantity Of 1 Job @ $40,625.00 1.C Credit For Equipment Removed From The Aircraft Quantity (If Accepted Of 1 Lot @ $-7,500.00 Total Of This Award: $294,775.80
8 May 2019
Usda Forest Service
Department Of Agriculture (Usda)
$294,343.80
1284N818C0002
Igf::Ot::Igf New Avionics And Engine Indication Equipment For N143z, De Havilland Dhc 6-300 With Possible Option For N141z R4 Aviation The Objective Of This Contract Is To Complete The Installation And Certification Of New Avionics And Engine Instrument Panel Upgrade On Plane N143z (A De Havilland Dhc6-300); With A Possible Contract Option Item For A Second New Avionics And Engine Instrument Panel Upgrade On Plane N141z (A De Havilland Dhc6-300). Both Of These Planes Have Had The Original -27 Engines Replaced By Pratt And Whitney Pt6-34 Engines (There Is An Stc Document Stating The Gauge Differences For Itt And Oil Pressure). Government Contract: Kevin Bailey Phone: 801.620.1870 Contract Period Of Performance: 75 Calendar Days From Issuance Of Notice To Proceed Modification 01 This Modification Extends The Contract From 06/29/2018 To 08/31/2018. This Extension Allows Time For The Contractor To Work With Aerocorp And Garmin To Obtain The Necessary Approved Stc Of The Nxi Screens (With The Software Corrections Currently Being Worked On)For Installing Into The Plane.
29 May 2018
Usda Forest Service
Department Of Agriculture (Usda)
$911,459.90
1284N819C0001
Igf::Ot::Igf Avionics Upgrade Of N144z Cessna Citation Bravo Serial Number Ce550b/926 Modification 02 - This Modification Extends The Period Of Performance By An Additional 17 Days (For A Total Of 57 Calendar Days) And Extends The Contract Expiration Date To April 30, 2019. In Consideration For The Additional 17 Days Of Period Of Performance, A Contract Deduction Of $432.00 Is Applied. All Other Contract Terms And Conditions Remain Unchanged. Modification 01 - This Modification Extends The Contract Expiration Date To March 30, 2019. This Extension Is Necessary As The Plane Was Not Inducted Until January 8, 2019 And With A 40 Calendar Period Of Performance, The Contract Should Be Completed By February 16, 2019. However, To Provide For Possible Changes Required For The Government Shutdown Entered Into On December 22, 2018, The Contract Expiration Date Is Set At March 30, 2019. Complete The Installation And Certification Of New Avionics Upgrade On Plane N144z. The Scope Of This Contract Is To Furnish All Labor, Tools, Upgrade Equipment, Permits, And Incidentals Necessary To Remove The Existing/Original Avionics Equipment And Install All Equipment As Listed In The Contract Scope Of Work. Contract Period Of Performance Is 40 Calendar Days From Issuance Of Notice To Proceed. The Government Requires Delivery Of The Completed Aircraft By January 11, 2019. Project Cor: Kevin Bailey Phone: 801.620.1870 Schedule Of Items: 1.A Avionics Upgrade To N144z, Cessna Citation Bravo (Includes Any Applicable Certificates, Licensing, Testing, Etc.) Quantity Of 1 System @ $261,650.80 1.B Labor For Installation Of Equipment Quantity Of 1 Job @ $40,625.00 1.C Credit For Equipment Removed From The Aircraft Quantity (If Accepted Of 1 Lot @ $-7,500.00 Total Of This Award: $294,775.80
1 Apr 2019
Usda Forest Service
Department Of Agriculture (Usda)
$294,343.80
1284N819C0001
Igf::Ot::Igf Avionics Upgrade Of N144z Cessna Citation Bravo Serial Number Ce550b/926 Modification 01 - This Modification Extends The Contract Expiration Date To March 30, 2019. This Extension Is Necessary As The Plane Was Not Inducted Until January 8, 2019 And With A 40 Calendar Period Of Performance, The Contract Should Be Completed By February 16, 2019. However, To Provide For Possible Changes Required For The Government Shutdown Entered Into On December 22, 2018, The Contract Expiration Date Is Set At March 30, 2019. Complete The Installation And Certification Of New Avionics Upgrade On Plane N144z. The Scope Of This Contract Is To Furnish All Labor, Tools, Upgrade Equipment, Permits, And Incidentals Necessary To Remove The Existing/Original Avionics Equipment And Install All Equipment As Listed In The Contract Scope Of Work. Contract Period Of Performance Is 40 Calendar Days From Issuance Of Notice To Proceed. The Government Requires Delivery Of The Completed Aircraft By January 11, 2019. Project Cor: Kevin Bailey Phone: 801.620.1870 Schedule Of Items: 1.A Avionics Upgrade To N144z, Cessna Citation Bravo (Includes Any Applicable Certificates, Licensing, Testing, Etc.) Quantity Of 1 System @ $261,650.80 1.B Labor For Installation Of Equipment Quantity Of 1 Job @ $40,625.00 1.C Credit For Equipment Removed From The Aircraft Quantity (If Accepted Of 1 Lot @ $-7,500.00 Total Of This Award: $294,775.80
8 Jan 2019
Usda Forest Service
Department Of Agriculture (Usda)
$294,775.80