Intech Construction, Llc
CAGE Code: 5PEM4
NCAGE Code: 5PEM4
Status: Active
Type: Commercial Supplier
Dun & Bradstreet (DUNS): 153795554
Summary
Intech Construction, Llc is an Active Commercial Supplier with the Cage Code 5PEM4 and is tracked by Dun & Bradstreet under DUNS Number 153795554..
Address
3020 Market St 6Th Floor
Philadelphia PA 19104-2999
United States
Points of Contact
Related Information
People who viewed this 'CAGE Code' also viewed...
Faith Assembly Of God Of Frankford Dalonzo-Lancaster Inc Central National-Gottesman Warren Intl Inc Howard Refrigerator Co Inc Silver Lake Foods Inc Industrial Oil Services Inc Center For Applied Research, Inc Boyer Earl G Jr Stelwagon Mfg Co Angelo Colonno Ge Energy Rentals General Electric Co Housewares And General Electric Co Appliance And Alex Products Guilbert Inc Key Chemicals Inc American Transformer Co Auto Engineering And Machine Co Neo-Quest Chemical Co
Frequently Asked Questions (FAQ) for CAGE 5PEM4
- What is CAGE Code 5PEM4?
- 5PEM4 is the unique identifier used by NATO Organizations to reference the physical entity known as Intech Construction, Llc located at 3020 Market St 6Th Floor, Philadelphia PA 19104-2999, United States.
- Who is CAGE Code 5PEM4?
- 5PEM4 refers to Intech Construction, Llc located at 3020 Market St 6Th Floor, Philadelphia PA 19104-2999, United States.
- Where is CAGE Code 5PEM4 Located?
- CAGE Code 5PEM4 is located in Philadelphia, PA, USA.
Contracting History for CAGE 5PEM4 Most Recent 25 Records
- GS03P17AZC0001
- Construction Restack Project At The Green Federal Building Philadelphia Pa Funding Action To Credit Back Rwa Money For Delays
- 8 Sep 2023
- Construction Restack Project At The Green Federal Building Philadelphia Pa Funding Action To Credit Back Rwa Money For Delays
- Pbs R3 Acq Mgmt Div North
- General Services Administration (Gsa)
- $126,574,009.01
- General Services Administration (Gsa)
- GS03P17AZC0001
- Administrative Modification To Correct Funding Issue
- 14 Aug 2023
- Administrative Modification To Correct Funding Issue
- Pbs R3 Acq Mgmt Div North
- General Services Administration (Gsa)
- $126,574,009.01
- General Services Administration (Gsa)
- GS03P17AZC0001
- Igf::Ot::Igf Restack Of The William J. Green Federal Building Construction Manager As Constructor (Cmc) Services Project At The William J. Green Federal Building In Philadelphia, Pa. This Modification Incorporates Several Request For Proposal Changes And Cost Events.
- 19 Dec 2017
- Igf::Ot::Igf Restack Of The William J. Green Federal Building Construction Manager As Constructor (Cmc) Services Project At The William J. Green Federal Building In Philadelphia, Pa. This Modification Incorporates Several Request For Proposal Changes And Cost Events.
- Pbs R3
- General Services Administration (Gsa)
- $126,816,744.00
- General Services Administration (Gsa)
- GS03P17AZC0001
- Restack Construction Change Order
- 20 Dec 2021
- Restack Construction Change Order
- Pbs R3
- General Services Administration (Gsa)
- $126,816,744.00
- General Services Administration (Gsa)
- GS03P17AZC0001
- Green Restack Gap Project Modification
- 20 Apr 2021
- Green Restack Gap Project Modification
- Pbs R3
- General Services Administration (Gsa)
- $126,816,744.00
- General Services Administration (Gsa)
- GS03P17AZC0001
- Intech Construction,Llc Green Federal Building Restack Renovation Modification Ps41. The Total Value Of This Modification Is $256,308.00.
- 12 Jul 2022
- Intech Construction,Llc Green Federal Building Restack Renovation Modification Ps41. The Total Value Of This Modification Is $256,308.00.
- Pbs R3
- General Services Administration (Gsa)
- $127,409,179.00
- General Services Administration (Gsa)
- GS03P17AZC0001
- Igf::Ot::Igf Restack Of The William J. Green Federal Building Construction Manager As Constructor (Cmc) Services Project At The William J. Green Federal Building In Philadelphia, Pa. This Modification Is Issued To Incorporate Request For Proposal 002.
- 30 Aug 2017
- Igf::Ot::Igf Restack Of The William J. Green Federal Building Construction Manager As Constructor (Cmc) Services Project At The William J. Green Federal Building In Philadelphia, Pa. This Modification Is Issued To Incorporate Request For Proposal 002.
- Pbs R3
- General Services Administration (Gsa)
- $126,816,744.00
- General Services Administration (Gsa)
- GS03P17AZC0001
- Deobligation Modification For Final Close Out And Shared Savings
- 18 Apr 2023
- Deobligation Modification For Final Close Out And Shared Savings
- Pbs R3 Acq Mgmt Div North
- General Services Administration (Gsa)
- $126,576,189.00
- General Services Administration (Gsa)
- GS03P17AZC0001
- Green Restack Modification Based Upon Agency Requested Changes
- 17 Mar 2021
- Green Restack Modification Based Upon Agency Requested Changes
- Pbs R3
- General Services Administration (Gsa)
- $126,816,744.00
- General Services Administration (Gsa)
- GS03P17AZC0001
- Igf::Ot::Igf Restack Of The William J. Green Federal Building Construction Manager As Constructor (Cmc) Services Project At The William J. Green Federal Building In Philadelphia, Pa. This Modification Is Issued For Phase 1.1 Construction Services.
- 30 May 2017
- Igf::Ot::Igf Restack Of The William J. Green Federal Building Construction Manager As Constructor (Cmc) Services Project At The William J. Green Federal Building In Philadelphia, Pa. This Modification Is Issued For Phase 1.1 Construction Services.
- Pbs R3
- General Services Administration (Gsa)
- $126,816,744.00
- General Services Administration (Gsa)
- GS03P17AZC0001
- Gs-03-P-17-Az-C-0001 Restack Of William J. Green Federal Building Cmc Services Mod Ps13 1. This Modification Represents The Supplemental Agreement Negotiated Between The Parties For The Pricing Updates For Phase 1.0 Customer Requested Changes, Request For Proposals (Rfps) Issued And Associated Cost Events For The Green Restack Cmc Project. 2. This Modification Includes The Following Proposals As Listed Below: -Cost Event #2007 - Eliminate Gmp Alternate #A4 As Included With Final Gmp Proposal Dated 10/24/2018 In The Amount Of ($115,560.00). -Cost Event #2012 - Rfi 1.1Con-0004, 0011 - Hw Coils&Dampers In Mech Rm Ahu Proposal Dated 10/25/2018 In The Amount Of ($46,131,31). -Cost Event #2015 - Rfp 20 Dated 9/11/2018 - Chiller Plant Bas Conversion Proposal Dated 1/31/2019 In The Amount Of $74,360.00. -Cost Event #2018 Addendum 04- Furniture Plan Adjustments Proposal Dated 1/24/2019 In The Amount Of $0.00. -Cost Event #2022 - Rfp 21 Dated 10/3/2018 - Retrofit Spring Isolators To 4 New Chiller Units Proposal Dated 11/6/2018 In The Amount Of $67,078.00. -Cost Event #2023 - Hvac Bas Align With Submittal Review&Gsa Network Directive Final Proposal Dated 1/24/2019 In The Amount Of $45,052.00. -Cost Event #2042 - Replace Condenser Water South Tower 24" Isolation Valve Parts Proposal Dated 1/31/2019 In The Amount Of $1932.00. In Consideration Of The Changes Listed Above The Total Contract Amount Is Increased By $26,731.00; These Changes Will Result In An Increase Of The Total Gmp For Phase 1 From $44,512,649.00 To $44,539,380.00. 3. The Contractor's Proposals Shown In The List Above Are Hereby Incorporated Into The Contract. 4. The Substantial Completion Date For Phase 1 Remains Unchanged As 4/10/2020. The Contract Completion Date For Phase 1 Remains Unchanged As 5/8/2020. 5. In Consideration Of This Modification, Agreed To Herein As A Complete Equitable Adjustment For The Aforementioned Changes, The Contractor Hereby Releases The Government From Any And All Liability Under This Contract For Further Equitable Adjustments, Attributable To Such Facts Or Circumstances Giving Rise To This Modification. All Other Terms And Conditions Remain Unchanged.
- 14 Feb 2019
- Gs-03-P-17-Az-C-0001 Restack Of William J. Green Federal Building Cmc Services Mod Ps13 1. This Modification Represents The Supplemental Agreement Negotiated Between The Parties For The Pricing Updates For Phase 1.0 Customer Requested Changes, Request For Proposals (Rfps) Issued And Associated Cost Events For The Green Restack Cmc Project. 2. This Modification Includes The Following Proposals As Listed Below: -Cost Event #2007 - Eliminate Gmp Alternate #A4 As Included With Final Gmp Proposal Dated 10/24/2018 In The Amount Of ($115,560.00). -Cost Event #2012 - Rfi 1.1Con-0004, 0011 - Hw Coils&Dampers In Mech Rm Ahu Proposal Dated 10/25/2018 In The Amount Of ($46,131,31). -Cost Event #2015 - Rfp 20 Dated 9/11/2018 - Chiller Plant Bas Conversion Proposal Dated 1/31/2019 In The Amount Of $74,360.00. -Cost Event #2018 Addendum 04- Furniture Plan Adjustments Proposal Dated 1/24/2019 In The Amount Of $0.00. -Cost Event #2022 - Rfp 21 Dated 10/3/2018 - Retrofit Spring Isolators To 4 New Chiller Units Proposal Dated 11/6/2018 In The Amount Of $67,078.00. -Cost Event #2023 - Hvac Bas Align With Submittal Review&Gsa Network Directive Final Proposal Dated 1/24/2019 In The Amount Of $45,052.00. -Cost Event #2042 - Replace Condenser Water South Tower 24" Isolation Valve Parts Proposal Dated 1/31/2019 In The Amount Of $1932.00. In Consideration Of The Changes Listed Above The Total Contract Amount Is Increased By $26,731.00; These Changes Will Result In An Increase Of The Total Gmp For Phase 1 From $44,512,649.00 To $44,539,380.00. 3. The Contractor's Proposals Shown In The List Above Are Hereby Incorporated Into The Contract. 4. The Substantial Completion Date For Phase 1 Remains Unchanged As 4/10/2020. The Contract Completion Date For Phase 1 Remains Unchanged As 5/8/2020. 5. In Consideration Of This Modification, Agreed To Herein As A Complete Equitable Adjustment For The Aforementioned Changes, The Contractor Hereby Releases The Government From Any And All Liability Under This Contract For Further Equitable Adjustments, Attributable To Such Facts Or Circumstances Giving Rise To This Modification. All Other Terms And Conditions Remain Unchanged.
- Pbs R3
- General Services Administration (Gsa)
- $126,816,744.00
- General Services Administration (Gsa)
- GS03P17AZC0001
- Contract No.: Gs03p17azc0001 Pdn: Engs03p17azc0001 Project: Restack William J. Green Federal Building Construction Manager As Contractor (Cmc) Services Location: William J. Green Federal Building, Philadelphia Pa Contractor: Intech Construction, Llc Duns: 153795554 Modification Ps15 See Attached Sf30 For Details
- 27 Jun 2019
- Contract No.: Gs03p17azc0001 Pdn: Engs03p17azc0001 Project: Restack William J. Green Federal Building Construction Manager As Contractor (Cmc) Services Location: William J. Green Federal Building, Philadelphia Pa Contractor: Intech Construction, Llc Duns: 153795554 Modification Ps15 See Attached Sf30 For Details
- Pbs R3
- General Services Administration (Gsa)
- $126,816,744.00
- General Services Administration (Gsa)
- GS03P17AZC0001
- Modification For Credit For Asbestos Work Not Performed
- 14 Dec 2021
- Modification For Credit For Asbestos Work Not Performed
- Pbs R3
- General Services Administration (Gsa)
- $126,816,744.00
- General Services Administration (Gsa)
- GS03P17AZC0001
- Igf::Ot::Igf Restack Of The William J. Green Federal Building Construction Manager As Constructor (Cmc) Services Project At The William J. Green Federal Building In Philadelphia, Pa. This Modification Is Issued To Correct The Building Number In The Accounting String.
- 1 Feb 2017
- Igf::Ot::Igf Restack Of The William J. Green Federal Building Construction Manager As Constructor (Cmc) Services Project At The William J. Green Federal Building In Philadelphia, Pa. This Modification Is Issued To Correct The Building Number In The Accounting String.
- Pbs R3
- General Services Administration (Gsa)
- $126,816,744.00
- General Services Administration (Gsa)
- GS03P17AZC0001
- Green Restack Modification Based Upon Agency Initiated Change Orders
- 4 Dec 2020
- Green Restack Modification Based Upon Agency Initiated Change Orders
- Pbs R3
- General Services Administration (Gsa)
- $126,816,744.00
- General Services Administration (Gsa)
- GS03P17AZC0001
- Administrative Modification To Correct Funding Code
- 14 Jul 2021
- Administrative Modification To Correct Funding Code
- Pbs R3
- General Services Administration (Gsa)
- $126,816,744.00
- General Services Administration (Gsa)
- GS03P17AZC0001
- Green Restack Modification To Incorporate Tenant Agency Change Requests Into Construction
- 12 Sep 2019
- Green Restack Modification To Incorporate Tenant Agency Change Requests Into Construction
- Pbs R3
- General Services Administration (Gsa)
- $126,816,744.00
- General Services Administration (Gsa)
- GS03P17AZC0001
- Gs-03-P-17-Az-C-0001 Restack Of William J. Green Federal Building Cmc Services Mod Ps11 1. This Modification Represents The Supplemental Agreement Negotiated Between The Parties For The Pricing Updates For Phase 1.1 And Phase 1.0 Customer Requested Changes, Request For Proposals (Rfps) Issued And Associated Cost Events For The Green Restack Cmc Project. 2. This Modification Includes The Following Proposals As Listed Below: -Cost Event #1081 Phase 1.1 - Rfi 1.1Con-00115 - Add Exterior Lighting And Fire Alarm Devices At New Substation Proposal Dated 6/25/2018 In The Amount Of $9036.00. -Cost Event #1088 Phase 1.1 - Provide Chemical Cleaning For Of Chiller Vsd Heat Exchangers Proposal Dated 8/27/2018 In The Amount Of $14,591. -Cost Event # 2004 Phase 1.0 - Add Riser Isolation Valves Final Proposal Dated 9/7/2018 In The Amount Of $36,278. -Cost Event # 2009 Phase 1.0 - Rfp 18 Gsa Field Office Swing Space T/D Fiber Final Proposal Dated 9/19/2018 In The Amount Of $5,132. -Cost Event # 2010 Phase 1.0 - Gsa Field Office Swing Space Lighting Restoration Proposal Dated 10/3/2018 In The Amount Of $5,175. In Consideration Of The Changes Listed Above The Total Contract Amount Is Increased By $70,212.00; These Changes Will Result In An Increase Of The Total Gmp For Phase 1 From $43,226,516.00 To 43,296,728.00. 3. The Contractor's Proposals Shown In The List Above Are Hereby Incorporated Into The Contract. 4. The Substantial Completion Date For Phase 1 Remains Unchanged As February 27, 2020. The Contract Completion Date For Phase 1 Remains Unchanged As March 27, 2020. 5. In Consideration Of This Modification, Agreed To Herein As A Complete Equitable Adjustment For The Aforementioned Changes, The Contractor Hereby Releases The Government From Any And All Liability Under This Contract For Further Equitable Adjustments, Attributable To Such Facts Or Circumstances Giving Rise To This Modification. All Other Terms And Conditions Remain Unchanged.
- 7 Nov 2018
- Gs-03-P-17-Az-C-0001 Restack Of William J. Green Federal Building Cmc Services Mod Ps11 1. This Modification Represents The Supplemental Agreement Negotiated Between The Parties For The Pricing Updates For Phase 1.1 And Phase 1.0 Customer Requested Changes, Request For Proposals (Rfps) Issued And Associated Cost Events For The Green Restack Cmc Project. 2. This Modification Includes The Following Proposals As Listed Below: -Cost Event #1081 Phase 1.1 - Rfi 1.1Con-00115 - Add Exterior Lighting And Fire Alarm Devices At New Substation Proposal Dated 6/25/2018 In The Amount Of $9036.00. -Cost Event #1088 Phase 1.1 - Provide Chemical Cleaning For Of Chiller Vsd Heat Exchangers Proposal Dated 8/27/2018 In The Amount Of $14,591. -Cost Event # 2004 Phase 1.0 - Add Riser Isolation Valves Final Proposal Dated 9/7/2018 In The Amount Of $36,278. -Cost Event # 2009 Phase 1.0 - Rfp 18 Gsa Field Office Swing Space T/D Fiber Final Proposal Dated 9/19/2018 In The Amount Of $5,132. -Cost Event # 2010 Phase 1.0 - Gsa Field Office Swing Space Lighting Restoration Proposal Dated 10/3/2018 In The Amount Of $5,175. In Consideration Of The Changes Listed Above The Total Contract Amount Is Increased By $70,212.00; These Changes Will Result In An Increase Of The Total Gmp For Phase 1 From $43,226,516.00 To 43,296,728.00. 3. The Contractor's Proposals Shown In The List Above Are Hereby Incorporated Into The Contract. 4. The Substantial Completion Date For Phase 1 Remains Unchanged As February 27, 2020. The Contract Completion Date For Phase 1 Remains Unchanged As March 27, 2020. 5. In Consideration Of This Modification, Agreed To Herein As A Complete Equitable Adjustment For The Aforementioned Changes, The Contractor Hereby Releases The Government From Any And All Liability Under This Contract For Further Equitable Adjustments, Attributable To Such Facts Or Circumstances Giving Rise To This Modification. All Other Terms And Conditions Remain Unchanged.
- Pbs R3
- General Services Administration (Gsa)
- $126,816,744.00
- General Services Administration (Gsa)
- GS03P17AZC0001
- Restack Renovation Modification Agency Requested Changes And Differing Site Conditions
- 22 Jul 2020
- Restack Renovation Modification Agency Requested Changes And Differing Site Conditions
- Pbs R3
- General Services Administration (Gsa)
- $126,816,744.00
- General Services Administration (Gsa)
- GS03P17AZC0001
- Restack Change Orders Agency Required
- 28 Jul 2021
- Restack Change Orders Agency Required
- Pbs R3
- General Services Administration (Gsa)
- $126,816,744.00
- General Services Administration (Gsa)
- GS03P17AZC0001
- Igf::Ot::Igf Restack Of The William J. Green Federal Building Construction Manager As Constructor (Cmc) Services Project At The William J. Green Federal Building In Philadelphia, Pa. This Modification Incorporates Several Request For Propoosals And Cost Event Changes.
- 4 Apr 2018
- Igf::Ot::Igf Restack Of The William J. Green Federal Building Construction Manager As Constructor (Cmc) Services Project At The William J. Green Federal Building In Philadelphia, Pa. This Modification Incorporates Several Request For Propoosals And Cost Event Changes.
- Pbs R3
- General Services Administration (Gsa)
- $126,816,744.00
- General Services Administration (Gsa)
- GS03P17AZC0001
- Restack Modification For Tenant A Design Changes
- 4 Sep 2020
- Restack Modification For Tenant A Design Changes
- Pbs R3
- General Services Administration (Gsa)
- $126,816,744.00
- General Services Administration (Gsa)
- GS03P17AZC0001
- Modification To Incorproate Agency Requested Changes
- 26 Jan 2022
- Modification To Incorproate Agency Requested Changes
- Pbs R3
- General Services Administration (Gsa)
- $126,816,744.00
- General Services Administration (Gsa)
- GS03P17AZC0001
- Contract No.: Gs-03P-17-Az-C-0001 Pdn: Engs03p17azc0001 Project: Restack William J. Green Federal Building Construction Manager As Contractor (Cmc) Services Location: William J. Green Federal Building, Philadelphia Pa Contractor: Intech Construction, Llc Duns: 153795554 Modification Ps14
- 22 May 2019
- Contract No.: Gs-03P-17-Az-C-0001 Pdn: Engs03p17azc0001 Project: Restack William J. Green Federal Building Construction Manager As Contractor (Cmc) Services Location: William J. Green Federal Building, Philadelphia Pa Contractor: Intech Construction, Llc Duns: 153795554 Modification Ps14
- Pbs R3
- General Services Administration (Gsa)
- $126,816,744.00
- General Services Administration (Gsa)
- GS03P17AZC0001
- Green Federal Building Restack Modification Customer Requested Changes
- 21 May 2020
- Green Federal Building Restack Modification Customer Requested Changes
- Pbs R3
- General Services Administration (Gsa)
- $126,816,744.00
- General Services Administration (Gsa)