Industrial Builders Inc
CAGE Code: 5F159
NCAGE Code: 5F159
Status: Active
Type: Commercial Supplier
Dun & Bradstreet (DUNS): 003868650
Summary
Industrial Builders Inc is an Active Commercial Supplier with the Cage Code 5F159 and is tracked by Dun & Bradstreet under DUNS Number 003868650..
Address
1307 County Road 17 N
West Fargo ND 58078-3818
United States
Points of Contact
Related Information
People who viewed this 'CAGE Code' also viewed...
Great Plains Towers Inc Water Smith, Inc Brenco Corporation Bryant Jr Weldon Anderson Prosthetics Advanced Orthotics And Prosthetics Lennys Pharmacy Gem Star Associates Johnstone Supply Quality Meats And Seafood Mid-America Aerotech, Llc Maxiair Farmers And Feeders Inc Weisgram Welding And Fabrication Premier Technology Sheyenne Forming Inc Ess Computer Inc Office Interiors, Inc. Aj Construction Inc Advanced Technology Ltd
Frequently Asked Questions (FAQ) for CAGE 5F159
- What is CAGE Code 5F159?
- 5F159 is the unique identifier used by NATO Organizations to reference the physical entity known as Industrial Builders Inc located at 1307 County Road 17 N, West Fargo ND 58078-3818, United States.
- Who is CAGE Code 5F159?
- 5F159 refers to Industrial Builders Inc located at 1307 County Road 17 N, West Fargo ND 58078-3818, United States.
- Where is CAGE Code 5F159 Located?
- CAGE Code 5F159 is located in West Fargo, ND, USA.
Contracting History for CAGE 5F159 Most Recent 25 Records
- W912ES21C0004
- Removal Of Crossovers, Elimination Of Shape Array Piping, Addition Of Extra Signs For Traffic Safety.
- 27 Oct 2022
- Removal Of Crossovers, Elimination Of Shape Array Piping, Addition Of Extra Signs For Traffic Safety.
- W07v Endist St Paul
- Department Of Defense (Dod)
- $67,732,787.41
- Department Of Defense (Dod)
- W912ES21C0004
- Remove The North And South Crossovers Installed Under Nddot Contract #Im-8-029(194)053. Work Includes Salvaged Base Course Removal, Asphalt Removal, Geosynthetic Material Removal, Material Disposal, And Necessary Traffic Control.
- 30 Jul 2021
- Remove The North And South Crossovers Installed Under Nddot Contract #Im-8-029(194)053. Work Includes Salvaged Base Course Removal, Asphalt Removal, Geosynthetic Material Removal, Material Disposal, And Necessary Traffic Control.
- W07v Endist St Paul
- Department Of Defense (Dod)
- $67,115,892.31
- Department Of Defense (Dod)
- W912ES21C0004
- This Contract Is Modified To: This Modification Extends The Red River Borrow Interim Completion Date By 8 Calendar Days From 08 October 2021 To 16 October 2021 For Unusually Severe Weather Between May 2021 And September 2021.
- 15 Oct 2021
- This Contract Is Modified To: This Modification Extends The Red River Borrow Interim Completion Date By 8 Calendar Days From 08 October 2021 To 16 October 2021 For Unusually Severe Weather Between May 2021 And September 2021.
- W07v Endist St Paul
- Department Of Defense (Dod)
- $67,115,892.31
- Department Of Defense (Dod)
- W912ES21C0004
- This Contract Is Modified To Adjust The Estimated Quantities To Interim Quantities For Pipe Conduit Clins 0009, 0012, 0013, 0014, 15, 0016, 0017, 0018.
- 2 Sep 2021
- This Contract Is Modified To Adjust The Estimated Quantities To Interim Quantities For Pipe Conduit Clins 0009, 0012, 0013, 0014, 15, 0016, 0017, 0018.
- W07v Endist St Paul
- Department Of Defense (Dod)
- $67,115,892.31
- Department Of Defense (Dod)
- W912ES21C0004
- Incorporate Nddot Drawings, Recover Fixed Costs Due To An Underrun In Quantity, Modify Drawings For Guardrail Installation.
- 20 Mar 2023
- Incorporate Nddot Drawings, Recover Fixed Costs Due To An Underrun In Quantity, Modify Drawings For Guardrail Installation.
- W07v Endist St Paul
- Department Of Defense (Dod)
- $68,673,628.08
- Department Of Defense (Dod)
- W912ES21C0004
- This Contract Is Modified To: Extend The Red River Borrow Interim Completion Date By 12 Calendar Days From 16 October 2021 To 28 October 2021 For Unusually Severe Weather During The Month Of October 2021.
- 10 Dec 2021
- This Contract Is Modified To: Extend The Red River Borrow Interim Completion Date By 12 Calendar Days From 16 October 2021 To 28 October 2021 For Unusually Severe Weather During The Month Of October 2021.
- W07v Endist St Paul
- Department Of Defense (Dod)
- $67,135,057.92
- Department Of Defense (Dod)
- W912ES21C0004
- This Contract Is Modified To Add Delineators, Mile Markers, And Object Markers Along The I-29 Temporary Bypass And To Add Delineators To The Temporary Interstate Ramp Connections Installed.
- 4 Mar 2022
- This Contract Is Modified To Add Delineators, Mile Markers, And Object Markers Along The I-29 Temporary Bypass And To Add Delineators To The Temporary Interstate Ramp Connections Installed.
- W07v Endist St Paul
- Department Of Defense (Dod)
- $67,062,103.44
- Department Of Defense (Dod)
- W912ES21C0004
- Increase In The Quantity Of Dam And Levee Embankment And Inspection Trench Due To An Error In Quantity Calculation During The Design Phase.
- 18 Jul 2023
- Increase In The Quantity Of Dam And Levee Embankment And Inspection Trench Due To An Error In Quantity Calculation During The Design Phase.
- W07v Endist St Paul
- Department Of Defense (Dod)
- $69,086,243.08
- Department Of Defense (Dod)
- W912ES21C0004
- I-29 Grade Raise And Borrow Ditch Crossing Modification
- 15 Apr 2021
- I-29 Grade Raise And Borrow Ditch Crossing Modification
- W07v Endist St Paul
- Department Of Defense (Dod)
- $66,969,789.60
- Department Of Defense (Dod)
- W912ES21C0004
- Fmm I-29 Grade Raise And Borrow Ditch Crossing - Variation In Estimated Quantity Contract Modification
- 24 Feb 2023
- Fmm I-29 Grade Raise And Borrow Ditch Crossing - Variation In Estimated Quantity Contract Modification
- W07v Endist St Paul
- Department Of Defense (Dod)
- $68,543,996.55
- Department Of Defense (Dod)
- W912ES21C0004
- This Contract Is Modified To: Adjust Contract Quantities To Interim Quantities For Clin 0017 Pipe Conduit 42-Inch, And Clin 0018 Pipe Conduit 54-Inch. Adjust Contract Quantities To Actual Final Quantities For Clin 0046 Granular Blanket Drain.
- 19 Jan 2023
- This Contract Is Modified To: Adjust Contract Quantities To Interim Quantities For Clin 0017 Pipe Conduit 42-Inch, And Clin 0018 Pipe Conduit 54-Inch. Adjust Contract Quantities To Actual Final Quantities For Clin 0046 Granular Blanket Drain.
- W07v Endist St Paul
- Department Of Defense (Dod)
- $68,543,996.55
- Department Of Defense (Dod)
- W912ES21C0004
- I-29 Grade Raise And Borrow Ditch Crossing Of The Fargo Moorhead Metropolitan Area Flood Risk Management Project
- 8 Apr 2021
- I-29 Grade Raise And Borrow Ditch Crossing Of The Fargo Moorhead Metropolitan Area Flood Risk Management Project
- W07v Endist St Paul
- Department Of Defense (Dod)
- $66,969,789.60
- Department Of Defense (Dod)
- W912ES21C0004
- This Contract Is Modified To Construct 2 Stabilization Berms, Increase The Borrow Ditch Width, Extend The Southern Embankment And To Compensate The Contractor For Unrecovered Fixed Costs Due To Quantity Underruns.
- 23 Nov 2022
- This Contract Is Modified To Construct 2 Stabilization Berms, Increase The Borrow Ditch Width, Extend The Southern Embankment And To Compensate The Contractor For Unrecovered Fixed Costs Due To Quantity Underruns.
- W07v Endist St Paul
- Department Of Defense (Dod)
- $67,732,787.41
- Department Of Defense (Dod)
- W912ES21C0004
- This Contract Is Modified To Install Additional Signs On Hwy 81 And Reimburse The Contractor For The Government Share Of The Partnering Expense.
- 14 Sep 2021
- This Contract Is Modified To Install Additional Signs On Hwy 81 And Reimburse The Contractor For The Government Share Of The Partnering Expense.
- W07v Endist St Paul
- Department Of Defense (Dod)
- $67,115,892.31
- Department Of Defense (Dod)
- W912ES21C0004
- Traffic Control Required To Close The County Road 16 Interchange Ramps To Allow The Contractor To Move In Phase 6 And 7 Of The Project. Contractor Will Not Be Required To Build The Temporary Ramp Connections.
- 28 Mar 2023
- Traffic Control Required To Close The County Road 16 Interchange Ramps To Allow The Contractor To Move In Phase 6 And 7 Of The Project. Contractor Will Not Be Required To Build The Temporary Ramp Connections.
- W07v Endist St Paul
- Department Of Defense (Dod)
- $68,673,628.08
- Department Of Defense (Dod)
- W912ES21C0004
- I-29 Grade Raise No-Cost Administrative Modification, Fargo, Nd
- 24 May 2021
- I-29 Grade Raise No-Cost Administrative Modification, Fargo, Nd
- W07v Endist St Paul
- Department Of Defense (Dod)
- $67,019,789.60
- Department Of Defense (Dod)
- W912ES21C0004
- Permanent I-29 Mainline Roadway
- 13 Jun 2023
- Permanent I-29 Mainline Roadway
- W07v Endist St Paul
- Department Of Defense (Dod)
- $69,086,243.08
- Department Of Defense (Dod)
- W912ES21C0004
- I-29 Grade Raise No-Cost Change
- 4 May 2021
- I-29 Grade Raise No-Cost Change
- W07v Endist St Paul
- Department Of Defense (Dod)
- $67,019,789.60
- Department Of Defense (Dod)
- W912ES21C0004
- Add Signs To The County Road 18/81 Intersection For Traffic Safety And Perform Bump Repair On The I-29 Bypass.
- 1 Sep 2022
- Add Signs To The County Road 18/81 Intersection For Traffic Safety And Perform Bump Repair On The I-29 Bypass.
- W07v Endist St Paul
- Department Of Defense (Dod)
- $68,019,979.41
- Department Of Defense (Dod)