Lund Randy M
Dba Lund Engineering
Div Engineering

CAGE Code: 5ELU1

NCAGE Code: 5ELU1

Status: Active

Type: Commercial Supplier

Dun & Bradstreet (DUNS): 089123504

Summary

Lund Randy M, Dba Lund Engineering, Div Engineering is an Active Commercial Supplier with the Cage Code 5ELU1 and is tracked by Dun & Bradstreet under DUNS Number 089123504..

Address

415 E 3Rd St
Washburn WI 54891-9430
United States

Points of Contact

No Points of Contact...

Related Information

Associated CAGE Codes People who viewed this 'CAGE Code' also viewed...

CAGE Code FAQ Frequently Asked Questions (FAQ) for CAGE 5ELU1

What is CAGE Code 5ELU1?
5ELU1 is the unique identifier used by NATO Organizations to reference the physical entity known as Lund Randy M Dba Lund Engineering Div Engineering located at 415 E 3Rd St, Washburn WI 54891-9430, United States.
Who is CAGE Code 5ELU1?
5ELU1 refers to Lund Randy M Dba Lund Engineering Div Engineering located at 415 E 3Rd St, Washburn WI 54891-9430, United States.
Where is CAGE Code 5ELU1 Located?
CAGE Code 5ELU1 is located in Washburn, WI, USA.

Contracting History for CAGE 5ELU1 Contracting History for CAGE 5ELU1 Most Recent 25 Records

W912EK20C0049
Levee Repairs For Milan, Il And Big Island
12 Sep 2020
W07v Endist Rock Island
Department Of Defense (Dod)
$2,011,729.48
W912EK20C0049
Contract For Mississippi River Basin Milan, Il, Flood Control Project R.I. County, Illinois Mill Creek, Rock River, Big Island 2019 Event Levee At R.I. County, Il. Reference No. Pl003. The Reason For This Modification Is Extend The Contract Time.
7 Dec 2021
W07v Endist Rock Island
Department Of Defense (Dod)
$2,088,474.00
W912EK20C0049
Mississippi River Basin Milan, Illinois Flood Control Project Rock Island County, Il. The Reason For This Modification Is For Big Island Gatewell And Area C.
20 Sep 2021
W07v Endist Rock Island
Department Of Defense (Dod)
$2,088,474.00
W912EK20C0049
Contract For Miss.Riverbasin Flood Control Project 2019 Event Levee&Gate Repairs Milan,Il-Rockislandco.,Il.Refno.R00004. Mod For Reseeding & Rock Variation In Estmt.Quant.&Verified.Contract Decreased$76,744.52And Completion Date Extended To 27Aug2022
21 Jul 2022
W07v Endist Rock Island
Department Of Defense (Dod)
$2,011,729.48
W912EK20C0049
Contract For Mississippi River Basin Milan, Illinois, Flood Control Project Rock Island County, Illinois Mill Creek, Rock River, Big Island, 2019 Event Levee And Gate Repairs. R00001 Reason For Modification Survey Of Additional Damaged Areas.
16 Sep 2021
W07v Endist Rock Island
Department Of Defense (Dod)
$2,088,474.00