Covenant Construction Services Llc
CAGE Code: 5BF39
NCAGE Code: 5BF39
Status: Active
Type: Commercial Supplier
Dun & Bradstreet (DUNS): 829504070
Summary
Covenant Construction Services Llc is an Active Commercial Supplier with the Cage Code 5BF39 and is tracked by Dun & Bradstreet under DUNS Number 829504070..
Address
2635 Berkshire Pkwy Ste 202
Clive IA 50325-4557
United States
Points of Contact
Related Information
People who viewed this 'CAGE Code' also viewed...
Petersen Court Reporters Inc Gary Mcintosh Real Meals Commercial Interiors/Irving Terry's Auto Service Inc Park Avenue Partners Llc Lappe Dennis Rullman Jeff Terry A. Walter Consulting Central Iowa Orthodontics, P.C. R.D. Rogers Company The Trane U.S. Inc. Ikon Office Solutions Signs Solutions Llc Ikon Office Solutions Inc Briggs Medical Service Company Mapcon Technologies Inc. Cb&I Constructors Inc. Div Cb&I Sport Cons Unlimited Llc Hardage Hotels I Llc
Frequently Asked Questions (FAQ) for CAGE 5BF39
- What is CAGE Code 5BF39?
- 5BF39 is the unique identifier used by NATO Organizations to reference the physical entity known as Covenant Construction Services Llc located at 2635 Berkshire Pkwy Ste 202, Clive IA 50325-4557, United States.
- Who is CAGE Code 5BF39?
- 5BF39 refers to Covenant Construction Services Llc located at 2635 Berkshire Pkwy Ste 202, Clive IA 50325-4557, United States.
- Where is CAGE Code 5BF39 Located?
- CAGE Code 5BF39 is located in Clive, IA, USA.
Contracting History for CAGE 5BF39 Most Recent 25 Records
- W912LP23D0008
- Construction Indefinite Delivery-Indefinite Quantity (Idiq) Multiple Award Task Order Contract (Matoc) For Maintenance, Repair, Construction, And Design-Build Services In Support Of The National Guard Throughout The State Of Iowa.
- 7 Sep 2023
- Construction Indefinite Delivery-Indefinite Quantity (Idiq) Multiple Award Task Order Contract (Matoc) For Maintenance, Repair, Construction, And Design-Build Services In Support Of The National Guard Throughout The State Of Iowa.
- W7m8 Uspfo Activity Ia Arng
- Department Of Defense (Dod)
- $0.00
- Department Of Defense (Dod)
- 36C26323C0034
- Pn: 636A8-21-001 Remodel 2W For Ir-Cath-Ep At The Iowa City Vahcs. Mod P00001 To Incorporate Change Orders 01-05 And Add 50 Additional Days.
- 3 Jan 2024
- Pn: 636A8-21-001 Remodel 2W For Ir-Cath-Ep At The Iowa City Vahcs. Mod P00001 To Incorporate Change Orders 01-05 And Add 50 Additional Days.
- Network Contract Office 23 (36C263)
- Department Of Veterans Affairs (Va)
- $6,459,065.98
- Department Of Veterans Affairs (Va)
- 36C26323C0034
- Pn: 636A8-21-001 Remodel 2W For Ir-Cath-Ep At The Iowa City Vahcs.
- 14 Mar 2023
- Pn: 636A8-21-001 Remodel 2W For Ir-Cath-Ep At The Iowa City Vahcs.
- Network Contract Office 23 (36C263)
- Department Of Veterans Affairs (Va)
- $6,350,289.00
- Department Of Veterans Affairs (Va)
- 36C10F20C0025
- Administrative: Change Of Contracting Officer
- 9 Nov 2022
- Administrative: Change Of Contracting Officer
- Office Of Construction&Facilities Mgmt (36C10f)
- Department Of Veterans Affairs (Va)
- $30,802,720.96
- Department Of Veterans Affairs (Va)
- 36C10F20C0025
- Due To Unforeseen Condition, Sleeving Of Drilled Piers Was Needed As There Was Water Intrusion, Effecting Concrete Pour.
- 7 Jul 2022
- Due To Unforeseen Condition, Sleeving Of Drilled Piers Was Needed As There Was Water Intrusion, Effecting Concrete Pour.
- Office Of Construction&Facilities Mgmt (36C10f)
- Department Of Veterans Affairs (Va)
- $30,641,555.33
- Department Of Veterans Affairs (Va)
- 36C10F20C0025
- Budget For Reo Inspection Tools In Order To Successfully Carry Out Duties And Responsibilities.
- 22 Aug 2023
- Budget For Reo Inspection Tools In Order To Successfully Carry Out Duties And Responsibilities.
- Office Of Construction & Facilities Mgmt (36C10f)
- Department Of Veterans Affairs (Va)
- $30,930,562.21
- Department Of Veterans Affairs (Va)
- 36C10F20C0025
- Dallas Fort Worth National Cemetery, Phase 5, Design-Bid-Build
- 28 Sep 2020
- Dallas Fort Worth National Cemetery, Phase 5, Design-Bid-Build
- Office Of Construction&Facilities Mgmt (36C10f)
- Department Of Veterans Affairs (Va)
- $30,624,879.00
- Department Of Veterans Affairs (Va)
- 36C10F20C0025
- Weather Delay Modification To Incorporate 20 Non Compensable Calendar Days Of Time Extension To The Base Contract.
- 22 Aug 2023
- Weather Delay Modification To Incorporate 20 Non Compensable Calendar Days Of Time Extension To The Base Contract.
- Office Of Construction & Facilities Mgmt (36C10f)
- Department Of Veterans Affairs (Va)
- $30,930,562.21
- Department Of Veterans Affairs (Va)
- 36C10F20C0025
- Add A Concrete Slab To The Soil Storage Building And A Sidewalk Adjoining The New Ne Parking Lot With The Existing, In Order To Provide Safe Egress To The Client.
- 24 Aug 2023
- Add A Concrete Slab To The Soil Storage Building And A Sidewalk Adjoining The New Ne Parking Lot With The Existing, In Order To Provide Safe Egress To The Client.
- Office Of Construction & Facilities Mgmt (36C10f)
- Department Of Veterans Affairs (Va)
- $30,930,562.21
- Department Of Veterans Affairs (Va)
- 36C10F20C0025
- Design Omission Of Attic Stock For All Finishes Within The Base Contract.
- 7 Sep 2023
- Design Omission Of Attic Stock For All Finishes Within The Base Contract.
- Office Of Construction & Facilities Mgmt (36C10f)
- Department Of Veterans Affairs (Va)
- $30,930,562.21
- Department Of Veterans Affairs (Va)
- 36C10F20C0025
- Required By Nca For Contract Phasing.
- 22 May 2023
- Required By Nca For Contract Phasing.
- Office Of Construction & Facilities Mgmt (36C10f)
- Department Of Veterans Affairs (Va)
- $30,930,562.21
- Department Of Veterans Affairs (Va)
- 36C10F20C0025
- Administrative: Change Of Administrative Contracting Officer
- 6 Jul 2023
- Administrative: Change Of Administrative Contracting Officer
- Office Of Construction & Facilities Mgmt (36C10f)
- Department Of Veterans Affairs (Va)
- $30,930,562.21
- Department Of Veterans Affairs (Va)
- 36C10F20C0025
- Modification Addresses A Design Error And Omission. Segment Of The Secondary Conduits From The Pad Mounted Transformer Were To Remain However Did Not Have The Capacity For The New Conductors To Be Installed.
- 3 Mar 2023
- Modification Addresses A Design Error And Omission. Segment Of The Secondary Conduits From The Pad Mounted Transformer Were To Remain However Did Not Have The Capacity For The New Conductors To Be Installed.
- Office Of Construction & Facilities Mgmt (36C10f)
- Department Of Veterans Affairs (Va)
- $30,930,562.21
- Department Of Veterans Affairs (Va)
- 36C10F20C0025
- Weather Delay Modification To Incorporate 2 Non Compensable Calendar Days Of Time Extension To The Base Contract.
- 22 Aug 2023
- Weather Delay Modification To Incorporate 2 Non Compensable Calendar Days Of Time Extension To The Base Contract.
- Office Of Construction & Facilities Mgmt (36C10f)
- Department Of Veterans Affairs (Va)
- $30,930,562.21
- Department Of Veterans Affairs (Va)
- 36C10F20C0025
- Dallas Fort Worth National Cemetery, Phase 5, Design-Bid-Build Administrative Modification Reflecting Correct Project Address
- 30 Sep 2020
- Dallas Fort Worth National Cemetery, Phase 5, Design-Bid-Build Administrative Modification Reflecting Correct Project Address
- Office Of Construction & Facilities Mgmt (36C10f)
- Department Of Veterans Affairs (Va)
- $30,627,869.33
- Department Of Veterans Affairs (Va)
- 36C10F20C0025
- Change In Co Administration
- 21 Dec 2020
- Change In Co Administration
- Office Of Construction & Facilities Mgmt (36C10f)
- Department Of Veterans Affairs (Va)
- $30,624,879.00
- Department Of Veterans Affairs (Va)
- 36C10F20C0025
- Change In Co Administration
- 23 Aug 2021
- Change In Co Administration
- Office Of Construction & Facilities Mgmt (36C10f)
- Department Of Veterans Affairs (Va)
- $30,624,879.00
- Department Of Veterans Affairs (Va)
- 36C10F20C0025
- Additional Key Cylinders For Existing Facilities To Tie Into The New Key Schedule Provided Within This Contract.
- 22 Aug 2023
- Additional Key Cylinders For Existing Facilities To Tie Into The New Key Schedule Provided Within This Contract.
- Office Of Construction & Facilities Mgmt (36C10f)
- Department Of Veterans Affairs (Va)
- $30,804,030.96
- Department Of Veterans Affairs (Va)
- 36C10F20C0025
- Field Adjustment To Allow For More Accessibility For Future Maintenance From The Client.
- 7 Sep 2023
- Field Adjustment To Allow For More Accessibility For Future Maintenance From The Client.
- Office Of Construction & Facilities Mgmt (36C10f)
- Department Of Veterans Affairs (Va)
- $30,930,562.21
- Department Of Veterans Affairs (Va)
- 36C10F20C0025
- Design Error With New Maintenance Building Locker Room Windows, Shower Stall Redesign And Cement Backer Board Demolition.
- 7 Sep 2023
- Design Error With New Maintenance Building Locker Room Windows, Shower Stall Redesign And Cement Backer Board Demolition.
- Office Of Construction & Facilities Mgmt (36C10f)
- Department Of Veterans Affairs (Va)
- $30,930,562.21
- Department Of Veterans Affairs (Va)
- 36C10F20C0025
- Unforeseen Site Conditions - Electrical Conduit Deficiencies
- 6 Jan 2022
- Unforeseen Site Conditions - Electrical Conduit Deficiencies
- Office Of Construction & Facilities Mgmt (36C10f)
- Department Of Veterans Affairs (Va)
- $30,627,869.33
- Department Of Veterans Affairs (Va)
- 36C10F20C0025
- Unforeseen Site Conditions - Nca Trailers (In Contract) Were In A Deteriorated State. This Change Covers Leasing Costs For For New Trailers For Contract Phasing.
- 13 Sep 2022
- Unforeseen Site Conditions - Nca Trailers (In Contract) Were In A Deteriorated State. This Change Covers Leasing Costs For For New Trailers For Contract Phasing.
- Office Of Construction&Facilities Mgmt (36C10f)
- Department Of Veterans Affairs (Va)
- $30,802,720.96
- Department Of Veterans Affairs (Va)
- 36C10F20C0025
- Design Error/Omission For The Area Drains Around The New Administration Building And The Domestic Water Line.
- 7 Sep 2023
- Design Error/Omission For The Area Drains Around The New Administration Building And The Domestic Water Line.
- Office Of Construction & Facilities Mgmt (36C10f)
- Department Of Veterans Affairs (Va)
- $30,930,562.21
- Department Of Veterans Affairs (Va)
- 36C10F20C0025
- Modification Addresses Design Omission Of The Paint Finish For The Wood Awning Around The New Administration Building. Will Now Match Existing Facilities.
- 25 Apr 2023
- Modification Addresses Design Omission Of The Paint Finish For The Wood Awning Around The New Administration Building. Will Now Match Existing Facilities.
- Office Of Construction & Facilities Mgmt (36C10f)
- Department Of Veterans Affairs (Va)
- $30,930,562.21
- Department Of Veterans Affairs (Va)
- 36C10F20C0025
- Modification Captures The Credit For A Field Adjustment On The Size Of The New Ne Parking Lot As A Result Of A Design Error (Civil Vs Planting Plan).
- 18 Apr 2023
- Modification Captures The Credit For A Field Adjustment On The Size Of The New Ne Parking Lot As A Result Of A Design Error (Civil Vs Planting Plan).
- Office Of Construction & Facilities Mgmt (36C10f)
- Department Of Veterans Affairs (Va)
- $30,930,562.21
- Department Of Veterans Affairs (Va)